The application discloses a non rock socketed post pile method inclined pile jacket construction system, which includes: jacket, steel pipe pile, guide block and packer, steel pipe pile sinking into the jacket setting and slurry is filled in its ring joint, the packer is set at the inner side of the bottom of the jacket, and the guide block is set on the inner wall of the jacket; the top of the jacket and the steel pipe pile are temporarily fixed by \7-shaped plate\; solution Except for temporary fixing, ring plate welding is adopted between the top of jacket and steel pipe pile. The application has high construction accuracy, saves offshore operation time, and provides a strong guarantee for the quality of jacket installation and construction.
【技术实现步骤摘要】
一种非嵌岩后桩法斜桩导管架施工系统
本申请属于导管架施工
,具体涉及一种非嵌岩后桩法斜桩导管架施工系统。
技术介绍
导管架基础作为一种重量轻、海床地质条件适应性好、稳定性好,整体刚度大、受到波浪和水流等环境载荷的作用比较小等优点,已被广泛用于海上风电风机基础、海上升压站基础和海上采油平台基础。作为海上风电场的电能汇集中心,海上升压站是其中输变电的关键设施,同时是整个海上风电场成败的关键。AlphaVentus(德国)、BelwindDemo(比利时)、ThorntonBank(比利时)、Walney(英国)以及Ormonde(英国)等国外海上升压站结构型式大多采用导管架结构形式,导管架和钢管桩之间通过灌浆连接。江苏鲁能东台、江苏大唐滨海、江苏三峡大丰、浙江普陀6#风电场等大量近海风电项目中,海上升压站基础结构大都采用后桩法斜桩导管架基础形式。海洋工程和海上风电工程中导管架按照安装与打桩施工的先后顺序划分,有两种结构形式:先打桩导管架和后打桩导管架。对于后桩法导管架施工而言,在现有施工工艺中常见的问题有:导管架安装施工过程中存在导管架初步调平难度大、钢管桩起吊插桩过程中封隔器易损坏、导管架精准调平和固定不到位、导管架灌浆前因导管架底部海床面附近淤泥被冲刷严重而引起导管架整体下沉等技术问题,这些问题严重影响了后续灌浆施工和导管架基础施工质量。
技术实现思路
针对上述现有技术的缺点或不足,本申请要解决的技术问题是提供一种一种非嵌岩后桩法斜桩导管架施工系统,其施工精度高,节省海上作业时间,为确保 ...
【技术保护点】
1.一种非嵌岩后桩法斜桩导管架施工系统,其特征在于,/n包括:导管架、钢管桩、导向块以及封隔器,/n所述钢管桩沉入所述导管架设置且其环缝内灌有浆料,所述封隔器设置在所述导管架的底部内侧,所述导向块设置在所述封隔器之上的所述导管架的内壁上;/n其中,所述导管架顶部与所述钢管桩之间通过“7字板”临时固定;解除临时固定后,所述导管架顶部与所述钢管桩之间采用环板永久焊接。/n
【技术特征摘要】
1.一种非嵌岩后桩法斜桩导管架施工系统,其特征在于,
包括:导管架、钢管桩、导向块以及封隔器,
所述钢管桩沉入所述导管架设置且其环缝内灌有浆料,所述封隔器设置在所述导管架的底部内侧,所述导向块设置在所述封隔器之上的所述导管架的内壁上;
其中,所述导管架...
【专利技术属性】
技术研发人员:汪冬冬,王大鹏,黄延琦,潘晓炜,吴亚波,张悦然,高健岳,吕东良,许卫士,孙兆斌,杜炎丰,
申请(专利权)人:中交上海三航科学研究院有限公司,中交上海港湾工程设计研究院有限公司,中交港湾上海科技有限公司,中交第三航务工程局有限公司,
类型:新型
国别省市:上海;31