The utility model relates to an inner support used for the construction of an open caisson, which comprises a support block, an I-beam and an inner support unit. The support blocks are respectively arranged at the four corners of the open caisson wall, the I-beam is set on the support block, and a plurality of the inner support units are spliced into an integral fixed set on the I-beam; the inner support unit comprises a support rod, a lower connecting rod and an upper connecting rod, and the inner support unit comprises a support rod, a lower connecting rod and an upper connecting rod One side of the support rod toward the caisson wall is provided with a plurality of rollers which are butted on the wall, the lower end of the adjacent support rod is connected with the lower connecting rod, and the upper end is connected with the upper connecting rod; the bottom end surface of the lower connecting rod is provided with a holding groove, and the top end surface of the upper connecting rod is provided with a fixing block matching the size of the holding groove. When the inner support unit is spliced, the fixing block is clamped in the holding groove In the groove, the side wall of the lower connecting rod is fixedly provided with a locking device for fixing the internal bracket units spliced with each other. The utility model has the advantages of convenient disassembly and protection of the caisson wall.
【技术实现步骤摘要】
一种沉井施工用的内支架
本技术涉及沉井施工的
,尤其是涉及一种沉井施工用的内支架。
技术介绍
沉井是施工常用的一种施工工艺。沉井有方形、圆形、椭圆形等形式,施工时提前浇筑首节,凝固后掏空下方,混凝土块开始下沉,随后继续浇筑上方,完成后再掏空,依次循环,直至开挖到基础底部,由壁、隔墙、支撑组成。目前,沉井在市政排水管网中应用通常是设置多个方形沉井呈九宫格排列,将市政管网中排出的水经过沉井的过滤然后在将水向外排出,避免脏水污染外部水资源。上述中的现有技术方案存在以下缺陷:在沉井管节浇筑时,通常是在沉井内四周设置内支架用于支撑管节内模板,但是每次在开挖沉井底部土体时都需要重新拆除内支架,将内支架吊离沉井内部,才能够对沉井底部土体进行开挖;在吊离内支架的过程中很容易将内支架碰到沉井已浇筑完成的内壁,造成内壁被破坏。
技术实现思路
本技术的目的是提供一种沉井施工用的内支架,该支架具有便于拆装和保护沉井墙体的优点。本技术的目的是通过以下技术方案得以实现的:一种沉井施工用的内支架,包括支撑块、工字钢和内支架单元,四个所述支撑块分别设置在沉井墙体四角内侧且于沉井最下端墙体一起浇筑成型,所述工字钢搭设在相邻支撑块上,多个所述内支架单元沿沉井高度方向相互拼接为整体固定设置在工字钢上;所述内支架单元包括支撑杆、下连接杆和上连接杆,所述支撑杆朝向沉井墙体一侧设置有多个滚轮,所述滚轮抵接在沉井墙体上,相邻所述支撑杆下端连接下连接杆,上端连接上连接杆;所述下连接杆背离上连接杆的端面上开设有容纳槽,所 ...
【技术保护点】
1.一种沉井施工用的内支架,其特征在于:包括支撑块(1)、工字钢(2)和内支架单元(3),四个所述支撑块(1)分别设置在沉井墙体(4)四角内侧且于沉井最下端墙体(4)一起浇筑成型,所述工字钢(2)搭设在相邻支撑块(1)上,多个所述内支架单元(3)沿沉井高度方向相互拼接为整体固定设置在工字钢(2)上;所述内支架单元(3)包括支撑杆(31)、下连接杆(32)和上连接杆(33),所述支撑杆(31)朝向沉井墙体(4)一侧设置有多个滚轮(5),所述滚轮(5)抵接在沉井墙体(4)上,相邻所述支撑杆(31)下端连接下连接杆(32),上端连接上连接杆(33);所述下连接杆(32)背离上连接杆(33)的端面上开设有容纳槽(321),所述上连接杆(33)背离下连接杆(32)的端面上设置与容纳槽(321)大小适配的固定块(331),在所述内支架单元(3)拼接时,位于下方的固定块(331)卡嵌在容纳槽(321)内,所述下连接杆(32)的侧壁上固定设置有锁紧装置(6),所述锁紧装置(6)中的杆件能够穿过容纳槽(321)和固定块(331)将相邻的内支架单元(3)固定在一起。/n
【技术特征摘要】
1.一种沉井施工用的内支架,其特征在于:包括支撑块(1)、工字钢(2)和内支架单元(3),四个所述支撑块(1)分别设置在沉井墙体(4)四角内侧且于沉井最下端墙体(4)一起浇筑成型,所述工字钢(2)搭设在相邻支撑块(1)上,多个所述内支架单元(3)沿沉井高度方向相互拼接为整体固定设置在工字钢(2)上;所述内支架单元(3)包括支撑杆(31)、下连接杆(32)和上连接杆(33),所述支撑杆(31)朝向沉井墙体(4)一侧设置有多个滚轮(5),所述滚轮(5)抵接在沉井墙体(4)上,相邻所述支撑杆(31)下端连接下连接杆(32),上端连接上连接杆(33);所述下连接杆(32)背离上连接杆(33)的端面上开设有容纳槽(321),所述上连接杆(33)背离下连接杆(32)的端面上设置与容纳槽(321)大小适配的固定块(331),在所述内支架单元(3)拼接时,位于下方的固定块(331)卡嵌在容纳槽(321)内,所述下连接杆(32)的侧壁上固定设置有锁紧装置(6),所述锁紧装置(6)中的杆件能够穿过容纳槽(321)和固定块(331)将相邻的内支架单元(3)固定在一起。
2.根据权利要求1所述的一种沉井施工用的内支架,其特征在于:所述滚轮(5)沿支撑杆(31)高度方向间隔均匀设置,所述滚轮(5)包括连接轴(51)、辊轴(52)和滑轮(53),所述连接轴(51)一端固定设置在支撑杆(31)上,另一端固定连接有辊轴(52),所述辊轴(52)上设置有滑轮(53),所述滑轮(53)抵接在沉井墙体(4)上。
3.根据权利要求1所述的一种沉井施工用的内支架,其特征在于:所述锁紧装置(6)包括套筒(61...
【专利技术属性】
技术研发人员:逯平,赵昕,宋鑫,车青森,李振坤,马跃东,蔡连军,孙熙栋,
申请(专利权)人:北京市市政二建设工程有限责任公司,
类型:新型
国别省市:北京;11