The invention discloses a wind-resistant locking device and method for erecting closing ports of steel truss beams hole by hole, which is used to temporarily lock the erected A-span steel truss beams and the B-span steel truss beams to be erected, including two telescopic booms, rear crossbeams and two pushing mechanisms; two telescopic booms are arranged on both sides of the inclined poles of A-span steel truss beams along the transverse direction of the bridge, and the telescopic booms include outer sleeve, inner sleeve and drive. The outer sleeve is placed on the A-span lower chord of the A-span steel truss beam; the inner sleeve part is located in the outer sleeve; the driving mechanism is located in the outer sleeve and connected with the inner sleeve to drive the inner sleeve to move along the longitudinal bridge; the rear cross beam is connected with two outer sleeves; the inner sleeve of the two telescopic arms forms a receiving area of the B-span lower chord for accommodating the B-span steel truss beam; one end of the two pushing mechanisms is respectively fixed. It is fixed on two inner sleeves and is located outside the outer sleeve. The other end can be extended or retracted along the transverse bridge towards the shelter area. The invention can improve the overall wind resistance of the steel truss beam during erection.
【技术实现步骤摘要】
一种钢桁梁逐孔架设合龙口抗风锁定装置及使用方法
本专利技术涉及桥梁工程上部结构钢桁梁逐孔架设施工
,具体涉及一种钢桁梁逐孔架设合龙口抗风锁定装置及使用方法。
技术介绍
现有桥梁工程上部结构施工中,一般多跨多联的大跨度钢桁梁逐孔架设方法如下:大跨度钢桁梁通过运梁台车纵移、横移至钢桁梁下河码头后,运输至待架孔位,一联中的首跨钢桁梁采用大型浮吊直接架设,除首跨外其余跨钢桁梁由菱形钢梁吊架辅助逐孔安装,直至架设完成一联钢桁梁。然而,每年的3月~10月,桥址区域频发不可预见的飓风或飑线风,钢桁梁架设阶段10年一遇的最高风速达到39.25m/s,一方面,超强的飑线风曾经损坏过钢桁梁下河码头和大型浮吊;另一方面,待架设的钢桁梁与已架设的钢桁梁进行合拢对接工序时,二者合拢的抗风能力弱、稳定性差,合拢对接安全性低。
技术实现思路
针对现有技术中存在的缺陷,本专利技术的目的在于提供一种钢桁梁逐孔架设合龙口抗风锁定装置,可提高钢桁梁架设期间整体抗风能力,保证飓风或飑线风期间架梁安全性。为达到以上目的,本专利技术采取的技术方案是:一种钢桁梁逐孔架设合龙口抗风锁定装置,其用于将已架设的A跨钢桁梁与待架设的B跨钢桁梁进行临时锁定,其包括:两个伸缩臂,其用于沿横桥向分别布置于A跨钢桁梁的斜杆两侧,所述伸缩臂包括:-外套筒,其用于安置于A跨钢桁梁的A跨下弦杆上;-内套筒,其部分位于所述外套筒内;-驱动机构,其设于外套筒内并与内套筒相连,其用于驱动所述内套筒沿纵桥向运动;后横梁,其连接两所述外套筒;两个伸缩臂的内套筒之间形成用于收容B跨钢桁梁的B跨下弦杆的收容区;两个顶推机构,两所述顶推 ...
【技术保护点】
1.一种钢桁梁逐孔架设合龙口抗风锁定装置,其用于将已架设的A跨钢桁梁(1)与待架设的B跨钢桁梁(2)进行临时锁定,其特征在于,其包括:两个伸缩臂(3),其用于沿横桥向分别布置于A跨钢桁梁(1)的斜杆(10)两侧,所述伸缩臂(3)包括:‑外套筒(30),其用于安置于A跨钢桁梁(1)的A跨下弦杆(11)上;‑内套筒(31),其部分位于所述外套筒(30)内;‑驱动机构(32),其设于外套筒(30)内并与内套筒(31)相连,其用于驱动所述内套筒(31)沿纵桥向运动;后横梁(4),其连接两所述外套筒(30);两个伸缩臂(3)的内套筒(31)之间形成用于收容B跨钢桁梁(2)的B跨下弦杆(20)的收容区(5);两个顶推机构(6),两所述顶推机构(6)一端分别固定于两所述内套筒(31)上且位于外套筒(30)外,另一端可以沿横桥向朝收容区(5)伸长或回缩。
【技术特征摘要】
1.一种钢桁梁逐孔架设合龙口抗风锁定装置,其用于将已架设的A跨钢桁梁(1)与待架设的B跨钢桁梁(2)进行临时锁定,其特征在于,其包括:两个伸缩臂(3),其用于沿横桥向分别布置于A跨钢桁梁(1)的斜杆(10)两侧,所述伸缩臂(3)包括:-外套筒(30),其用于安置于A跨钢桁梁(1)的A跨下弦杆(11)上;-内套筒(31),其部分位于所述外套筒(30)内;-驱动机构(32),其设于外套筒(30)内并与内套筒(31)相连,其用于驱动所述内套筒(31)沿纵桥向运动;后横梁(4),其连接两所述外套筒(30);两个伸缩臂(3)的内套筒(31)之间形成用于收容B跨钢桁梁(2)的B跨下弦杆(20)的收容区(5);两个顶推机构(6),两所述顶推机构(6)一端分别固定于两所述内套筒(31)上且位于外套筒(30)外,另一端可以沿横桥向朝收容区(5)伸长或回缩。2.如权利要求1所述的抗风锁定装置,其特征在于:两所述外套筒(30)之间还通过联接系(9)连接,所述后横梁(4)与联接系(9)间隔设置。3.如权利要求1所述的抗风锁定装置,其特征在于:所述外套筒(30)内设有反力座(7),所述驱动机构(32)与反力座(7)相连。4.如权利要求1所述的抗风锁定装置,其特征在于:所述顶推机构(6)采用千斤顶,所述千斤顶与内套筒(31)相连,且其动力输出端用于抵持B跨下弦杆(20)。5.如权利要求1所述的抗风锁定装置,其特征在于:所述内套筒(31)远离外套筒...
【专利技术属性】
技术研发人员:徐平安,毛伟琦,涂满明,卢鹏,黄晓剑,李方峰,刘建华,潘军,余本俊,孙刘洋,
申请(专利权)人:中铁大桥局集团有限公司,