The utility model discloses a device for perforating lightning-proof belt of a comprehensive pipe gallery, which comprises two lightning-proof belt brackets connected by a perforator bracket. The lightning-proof belt bracket is a stool-shaped one, comprising two beams, a connecting shaft connecting two beams, a rotating tube sleeved on the connecting shaft and four legs connected under the end of the beam. The perforator bracket comprises a perforator bracket and four legs connected to the end of the beam. The support leg under the support of the perforator is connected to the support leg of the lightning arrester belt support. The device is flexible and convenient to operate. It is easy to move the lightning arrester belt in the drilling process, and can accurately maintain the transverse position of the lightning arrester belt on the drilling device, so that the holes on the lightning arrester belt are in the same straight line and easy to install.
【技术实现步骤摘要】
一种综合管廊避雷带打孔用装置
本技术涉及一种综合管廊避雷带辅助装置,具体是一种综合管廊避雷带打孔用装置。
技术介绍
地下综合管廊是城市地下用于集中敷设市政管线的公共隧道。综合管廊是目前市政基础设施建设的一项主要工程,可有效杜绝反复开挖路面,方便技术人员在管廊中就可对各类管线进行抢修、维护、扩容改造等。地下综合管廊中通常包含电力、通信、广播电视、给水等多种生活设施管线,因此,必须做好地下综合管廊的防雷避雷措施。
技术实现思路
为了克服现有技术不足,本技术提供一种综合管廊避雷带打孔用装置,该装置操作灵活方便,在打孔过程中易于移动避雷带,并且并能精确保持避雷带在打孔装置上的横向位置,使得避雷带上的孔都处于同一条直线上,便于安装。本技术实现上述目的的技术方案如下:一种综合管廊避雷带打孔用装置,包括由打孔机支架连接的两个避雷带支架,所述避雷带支架为条凳形,包括两根横梁、连接两根横梁的连接轴,套在连接轴上的转动管及连接于横梁端部下面的四个支腿,所述打孔机支架包括打孔机支座和连接于打孔机支座下方的支撑腿,所述打孔机支架的支撑腿连接在避雷带支架的支腿上。本技术中,两根横梁长度相等并相互平行,在两横梁的端部和中部等间隔设置若干连接轴,连接轴连接两横梁,每个连接轴上均套有转动管,各转动管的尺寸相同,所述转动管均靠近同一侧横梁。所述转动管能够在连接轴上转动,所述转动管的长度小于连接轴长度。两个避雷带支架之间通过一避雷带限位杆连接,所述避雷带限位杆连接于各连接轴上,所有转动管均设置在限位杆的同一侧。所述避雷带限位杆的长度等于打孔机支架与两个避雷带支架的长度之和。即避雷带限位杆沿打孔机支架 ...
【技术保护点】
1.一种综合管廊避雷带打孔用装置,其特征在于,包括由打孔机支架(1)连接的两个避雷带支架(2),所述避雷带支架(2)包括两根横梁(201)、连接两根横梁(201)的连接轴(202),套在连接轴(202)上的转动管(203)及连接于横梁(201)端部下面的四个支腿(204),所述打孔机支架(1)包括打孔机支座(101)和连接于打孔机支座(101)下方的支撑腿(102)。
【技术特征摘要】
1.一种综合管廊避雷带打孔用装置,其特征在于,包括由打孔机支架(1)连接的两个避雷带支架(2),所述避雷带支架(2)包括两根横梁(201)、连接两根横梁(201)的连接轴(202),套在连接轴(202)上的转动管(203)及连接于横梁(201)端部下面的四个支腿(204),所述打孔机支架(1)包括打孔机支座(101)和连接于打孔机支座(101)下方的支撑腿(102)。2.根据权利要求1所述的综合管廊避雷带打孔用装置,其特征在于,所述打孔机支架(1)的支撑腿(102)连接在避雷带支架(2)的支腿(204)上。3.根据权利要求1所述的综合管廊避雷带打孔用装置,其特征在于,两根横梁(201)长度相等并相互平行。4.根据权利要求1所述的综合管廊避雷带打孔用装置,其特征在于,所述避雷带支架(2)为条凳形。5.根据权利要求1所述的综合管廊避雷带打孔用装置,其特征在于,在两横梁(201)的端部和中部等间隔设置若干连接轴(202),每个连接轴(20...
【专利技术属性】
技术研发人员:浦绍川,殷华富,向万军,崔敏,宋盛涛,罗如刚,王利,王飞,段涛,杨超,张玉权,田丹丹,刘泽南,熊梓辰,邹伟迪,
申请(专利权)人:云南省建设投资控股集团有限公司,
类型:新型
国别省市:云南,53
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。