The utility model discloses a frame-type flood control wall for substation, including frame and cast-in-place slab; the frame includes frame columns and frame beams, which are arranged vertically with equal spacing, and the frame beams are arranged horizontally with equal spacing; the frame beams and frame beams are vertically intersected to form a frame, and the flood control wall is divided into several square units, each of which is a block unit. With frame column and frame beam as the edge, reinforcement bars are installed in the block unit, then cast-in-place slab is formed by integral concrete placement, and frame and cast-in-place slab are integrally constituted as frame flood control wall. When the flood level is high, compared with the conventional cantilever type flood control wall and boom type flood control wall, the scheme can effectively reduce the thickness of flood control wall by optimizing the stress mode, making full use of the mechanical properties of materials, thus reducing the volume of flood control wall works, and the cross-section height of frame columns is 800 mm. On the premise of meeting the same use function, the scheme greatly reduces the occupation of land and saves compared with boom type flood control wall. Land resources.
【技术实现步骤摘要】
一种用于变电站的框架式防洪墙
本技术涉及一种用于变电站的框架式防洪墙,属于变电站安全防护
技术介绍
当变电站原始地坪标高低于百年一遇洪水位(五十年一遇洪水位)较多时,为减少土方回填工程量,变电站一般采用防洪墙阻挡洪水方案,防洪墙顶标高高出百年一遇洪水位500mm,站内适度填土即可满足防洪要求。这种常规的防洪墙一般采用现浇悬臂式钢筋混凝土防洪墙,当挡水高度较大时(>3m),为满足墙体抗弯要求,悬臂式防洪墙厚度一般在400mm以上,造成防洪墙工程量巨大,增加投资。除此之外,尚可选择一种扶壁式防洪墙,有鉴于完全利用墙板抵抗水平荷载的不合理性,扶壁式防洪墙每隔一定距离设置一道加劲肋,其受力特征为:洪水侧压力传递至两道肋之间的墙体上,再传递至两侧的肋上,这种方案充分利用加劲肋减少板的跨度,并承受大部分水平荷载,从而降低了墙板的厚度。但其伸出的臂较长,一般水平长度达到3~4m,增加了整个防洪墙的占地面积,使得变电站占地面积增大,不利于节约土地资源。
技术实现思路
目的:为了克服现有技术中存在的不足,解决在面临较高的防洪挡水高度时产生的大额工程量或者用地面积大等问题,本技术提供一种用于变电站的框架式防洪墙,解决了传统防洪墙工程量大或者占地大的问题。技术方案:为解决上述技术问题,本技术采用的技术方案为:一种用于变电站的框架式防洪墙,其特征在于:包括框架、现浇板;所述框架由框架柱、框架梁组成,所述框架柱竖向等间距布置,所述框架梁横向等间距布置;所述框架梁、框架梁相互垂直交叉连接,形成框架,将防洪墙分隔为若干个方块单元,每个方块单元以框架柱、框架梁为边;在方块单元内配 ...
【技术保护点】
1.一种用于变电站的框架式防洪墙,其特征在于:包括框架、现浇板;所述框架包括框架柱、框架梁,所述框架柱竖向等间距布置,所述框架梁横向等间距布置;所述框架梁、框架梁相互垂直交叉连接,形成框架,将防洪墙分隔为若干个方块单元,每个方块单元以框架柱、框架梁为边;在方块单元内配设加强筋,再整体混凝土浇筑形成现浇板;框架与现浇板整体构成框架式防洪墙。
【技术特征摘要】
1.一种用于变电站的框架式防洪墙,其特征在于:包括框架、现浇板;所述框架包括框架柱、框架梁,所述框架柱竖向等间距布置,所述框架梁横向等间距布置;所述框架梁、框架梁相互垂直交叉连接,形成框架,将防洪墙分隔为若干个方块单元,每个方块单元以框架柱、框架梁为边;在方块单元内配设加强筋,再整体混凝土浇筑形成现浇板;框架与现浇板整体构成框架式防洪墙。2.根据权利要求1所述的用于变电站的框架式防洪墙,其特征在于:所述框架为钢筋砼框架。3.根据权利要求1所述的用于变电站的框架式防洪墙,其特征在于:现浇板采用现浇钢筋混凝土结构。4.根据权利要求1所述的用于变电站的框架式防洪...
【专利技术属性】
技术研发人员:谭志成,周元强,姚刚,陆启亮,李龙剑,纪卫尚,王凯洋,肖平成,张涌泉,沈大伟,
申请(专利权)人:中国能源建设集团江苏省电力设计院有限公司,
类型:新型
国别省市:江苏,32