A new method of rock-soil anchored pre-stressed polymer bolt support mainly includes the following steps: determining the location of boreholes; drilling and removing impurities in boreholes; removing contaminants on the surface of the rod body, welding alignment brackets, binding and sealing bags; putting boreholes into the rod body; injecting polymer into the sealing bags; injecting polymer into the anchoring section; prestressing tension and locking; effective prestressing force. Monitoring shows that the loss of prestressing force is observed 24 hours after the locking of prestressing force. If the loss of prestressing force exceeds 10% of the designed tension force, compensatory tension and locking should be carried out; grouting concrete slurry and sealing. The invention has the characteristics of fast use, safety and time saving, can quickly anchor the rock and soil body, and has very low permeability coefficient, does not need special anti-corrosion treatment for the rod body, and has certain flexibility, better adaptability to the deformation of rock and soil body, and the bond strength with the matrix is greater than that of concrete, and is more suitable for projects requiring rapid reinforcement.
【技术实现步骤摘要】
一种预应力锚杆支护锚固装置及方法
本专利技术属于岩土锚固支护
,尤其涉及一种预应力锚杆支护锚固装置及方法。
技术介绍
我国幅员辽阔,有着丰富的地质、地貌单元,南北跨越大,地质条件复杂。大型工程的修建必然会跨越不同的地质单元,有时还会途径特殊的岩土体;如:南水北调工程在途径河南段遇到膨胀土,我国西北地区有着大量的湿陷性黄土等;这些特殊性土体对水是极为敏感的,而当前土体支护中仍旧使用混凝土,尽管经过不断的改进,水在传统的锚固支护中是必不可少的。随着锚固技术的不断发展,锚固理论的不断完善,无论是杆体还是锚固剂都在不断的发展,尽管如此,在实际的工程中还是以传统的水泥砂浆锚杆为主要的支护方式。传统的预应力锚杆锚固中,由于混凝土或砂浆混凝土流动性较差,采用高压注浆的方法,将砂浆注入钻孔;然后经过固结、养护达到一定强度后才能施加预应力,由于养护周期相对较长,不仅浪费大量的人力、物力,无形中延长了工期;由于水的参与,不可避免的会发生干缩的现象,在一定程度上降低了锚固效果。混凝土抗拉强度较低,当岩土体产生微小变形时,就会很容易出现裂缝,增加锚杆锈蚀速率。特别是当遇到险情,需要快速锚固岩土体时,传统的锚固技术是无法达到快速锚固并快速承担岩土体所受的荷载。树脂粘结型的锚杆虽然固结相对较快,但由于树脂材料含毒、易燃、易老化、价格高,使其推广应用受到限制。无论是对水敏感的膨胀土、湿陷性黄土还是岩体风化程度较高的岩质边体,亦或是发生险情需要快速加固的渠坡,都需要有一种能快速承力,无需水的参与,并且安全、稳定、环保的锚固材料。非水反应双组份聚氨酯材料,在固化反应过程中无需水的参与 ...
【技术保护点】
1.一种预应力锚杆支护锚固方法,其特征在于:包括以下步骤,(1)确定钻孔位置,并进行标注;(2)钻孔:采用钻机进行钻孔,在钻具上安装反吹排渣装置进行孔内杂物清理;(3)对锚杆进行预处理:在锚杆上焊接对中支架,对锚杆表面污渍进行处理,在锚杆上捆扎封孔布袋,锚杆穿过封孔布袋;(4)安放锚杆:将锚杆置于钻孔中心处,锚杆与钻孔同心,在钻孔内放置一次注浆管、二次注浆管和封孔注浆管,一次注浆管末端穿过封孔布袋,二次注浆管的末端置于封孔布袋上方,封孔注浆管末端置于布袋内,钻孔内封孔布袋下部为锚固段,封孔布袋上部为自由段;(5)封孔布袋注浆:注浆车通过封孔注浆管向封孔布袋内进行注浆封孔,10‑15分钟反应完毕,对钻孔进行封孔;(6)锚固段注浆:注浆车通过一次注浆管对锚固段进行注浆,注浆完成后,30‑40分钟后施加预应力;(7)预应力损失情况观测:通过张拉设备对锚杆施加张拉力,在锚杆上安装测力计,通过测力计监测锚杆的预应力,若24h后预应力损失超过张拉力的10%,则补偿张拉力至超出原张拉力的10%,锁定补偿后的张拉力,若预应力损失在张拉力的10%的范围内时,通过二次注浆管对自由段进行注浆。
【技术特征摘要】
1.一种预应力锚杆支护锚固方法,其特征在于:包括以下步骤,(1)确定钻孔位置,并进行标注;(2)钻孔:采用钻机进行钻孔,在钻具上安装反吹排渣装置进行孔内杂物清理;(3)对锚杆进行预处理:在锚杆上焊接对中支架,对锚杆表面污渍进行处理,在锚杆上捆扎封孔布袋,锚杆穿过封孔布袋;(4)安放锚杆:将锚杆置于钻孔中心处,锚杆与钻孔同心,在钻孔内放置一次注浆管、二次注浆管和封孔注浆管,一次注浆管末端穿过封孔布袋,二次注浆管的末端置于封孔布袋上方,封孔注浆管末端置于布袋内,钻孔内封孔布袋下部为锚固段,封孔布袋上部为自由段;(5)封孔布袋注浆:注浆车通过封孔注浆管向封孔布袋内进行注浆封孔,10-15分钟反应完毕,对钻孔进行封孔;(6)锚固段注浆:注浆车通过一次注浆管对锚固段进行注浆,注浆完成后,30-40分钟后施加预应力;(7)预应力损失情况观测:通过张拉设备对锚杆施加张拉力,在锚杆上安装测力计,通过测力计监测锚杆的预应力,若24h后预应力损失超过张拉力的10%,则补偿张拉力至超出原张拉力的10%,锁定补偿后的张拉力,若预应力损失在张拉力的10%的范围内时,通过二次注浆管对自由段进行注浆。2.如权利要求1所述的预应力锚杆支护锚固方法,其特征在于:所述锚固段和自由段内均为高...
【专利技术属性】
技术研发人员:王复明,石明生,王道路,郝燕洁,王超杰,李禄禄,陈永利,张素亚,
申请(专利权)人:郑州大学,郑州安源工程技术有限公司,
类型:发明
国别省市:河南,41