The invention relates to the field of prefabricated assembled concrete structure construction, in particular to an all-steel key connection structure and assembly method of an assembled concrete structure wall and column. The structure includes prefabricated columns, wall embedded parts, prefabricated columns and prefabricated shear walls. The prefabricated shear walls are located between two prefabricated columns. The prefabricated columns and wall embedded parts correspond to each other, and the prefabricated columns and wall embedded parts are connected by I-shaped columns and walls. The prefabricated column and the prefabricated shear wall of the invention complete the transfer of shear force between the wall and the column connection by setting the pre-embedded parts and the steel shear keys, further enhancing the integrity of the structure and improving the seismic performance. The invention does not include on-site grouting or concrete pouring and other processes, all of which are on-site installation and connection of prefabricated components, do not need wet operation, greatly shorten the time required for on-site construction, and can greatly improve the construction speed.
【技术实现步骤摘要】
装配式混凝土结构墙-柱全钢键连接结构及拼装方法
本专利技术涉及预制装配式混凝土结构建筑领域,具体为一种装配式混凝土结构墙-柱全钢键连接结构及拼装方法。
技术介绍
装配式混凝土结构具有施工速度快、节能环保、现场湿作业量小等优点,近些年在国内得到迅猛发展。混凝土框架-剪力墙结构(简称框剪结构)是我国目前应用的主要结构形式之一。因此,如何拆分连接框剪结构,形成装配式体系成为土木工程师关注的重要问题。以往有关墙-柱连接,主要采用钢筋连接然后在连接处浇筑混凝土或灌浆料的方法,施工需要湿作业,施工工艺繁琐,施工速度慢,且连接部位的质量不易保证。为此,专利技术人之前专利技术“一种装配式框剪结构弯剪型组合键槽连接结构”和“一种装配式混凝土框架剪力墙键槽连接结构”,并获得授权。上述两个专利,在处理构件间拼缝时,采用的是灌浆连接,需要湿作业,并且墙-柱连接处,限制二者脱开的能力较弱。为此,提出装配式混凝土结构墙-柱全钢键连接结构及拼装方法。
技术实现思路
本专利技术的目的在于提供一种装配式混凝土结构墙-柱全钢键连接结构及拼装方法,在保证各种预制混凝土构件间连接的前提下,完全不 ...
【技术保护点】
1.一种装配式混凝土结构墙‑柱全钢键连接结构,其特征在于,包括预制柱‑墙预埋件、预制柱、预制剪力墙,预制剪力墙位于两个预制柱之间,预制柱与预制剪力墙之间的预制柱‑墙预埋件相对应,相对设置的预制柱‑墙预埋件之间通过工字型柱‑墙连接键连接,其中:(1)预制柱‑墙预埋件由带肋钢板和圆孔组成,带肋钢板的一侧上下平行设置横截面为L型的肋板,整块带肋钢板上设置圆孔,圆孔平行排布,剪力墙横向受力筋穿过圆孔,肋板分别与带肋钢板的侧面形成凹槽,上下两个凹槽相对;(2)预制柱由预制柱内纵向受力筋、预制柱箍筋、竖向钢筋套筒和带肋钢板浇筑混凝土组成,呈方形排布的四个预制柱内纵向受力筋通过预制柱箍筋 ...
【技术特征摘要】
1.一种装配式混凝土结构墙-柱全钢键连接结构,其特征在于,包括预制柱-墙预埋件、预制柱、预制剪力墙,预制剪力墙位于两个预制柱之间,预制柱与预制剪力墙之间的预制柱-墙预埋件相对应,相对设置的预制柱-墙预埋件之间通过工字型柱-墙连接键连接,其中:(1)预制柱-墙预埋件由带肋钢板和圆孔组成,带肋钢板的一侧上下平行设置横截面为L型的肋板,整块带肋钢板上设置圆孔,圆孔平行排布,剪力墙横向受力筋穿过圆孔,肋板分别与带肋钢板的侧面形成凹槽,上下两个凹槽相对;(2)预制柱由预制柱内纵向受力筋、预制柱箍筋、竖向钢筋套筒和带肋钢板浇筑混凝土组成,呈方形排布的四个预制柱内纵向受力筋通过预制柱箍筋连接形成框架结构,每个预制柱内纵向受力筋的底部套装竖向钢筋套筒,所述框架结构的一侧面自上而下均匀设置预制柱-墙预埋件,混凝土浇筑于框架结构内侧和外侧;(3)预制剪力墙包括钢筋骨架、预制柱-墙预埋件和混凝土,钢筋骨架的两侧分别设置预制柱-墙预埋件,混凝土浇筑于钢筋骨架内侧和外侧;钢筋骨架为剪力墙纵向受力筋、剪力墙横向受力筋、剪力墙约束边缘构件箍筋和剪力墙拉筋组成,两排剪力墙纵向受力筋平行相对设置,每排剪力墙纵向受力筋之间通过剪力墙横向受力筋连接,相对设置的剪力墙纵向受力筋之间通过剪力墙拉筋连接,两排剪力墙纵向受力筋的边缘之间外侧上下平行设置剪力墙约束边缘构件箍筋。2.按照权利要求1所述的装配式混凝土结构墙-柱全钢键连接结构,其特征在于,工字型柱-墙连接键4由竖向板、水平板、凸筋组成,竖向板的上下设置水平板呈工字型结构,位于上部的水平板顶部两端一体设置平行的凸筋,位于下部的水平板底部两端一体设置平行的凸筋,工字型柱-墙连接键4的两侧分别与预制柱-墙预埋件连接,工字型柱-墙连接键通过上下两个凸筋分别与预制柱-墙预埋件的上下两个凹槽插装配合。3.按照权利要求1所述的装配式混凝土结构墙-柱全钢键连接结构,其特征在于,预制柱与预制剪力墙间连接部位外侧设置盖板,盖板包括盖板横向分布筋、盖板纵向分布筋和钢垫板,一排平行相对的盖板横向分布筋和一排平行相对的盖板纵向分布筋组成钢筋骨架网。4.按照权利要求3所述的装配式混凝土结构墙-柱全钢键连接结构,其特征在于,钢垫板焊接在钢筋骨架网内某两根相邻盖板横向分布筋间,具体连接位置对应为预制柱与预制剪力墙间填充苯板中心。5.一种权利要求1至4之一所述的装配式混凝土结构墙-柱全钢键连接结构的拼装方法,其特征在于,包括如下步骤:(1)预制柱与预制剪力墙的吊装,先将两个预制柱与一个预制剪力墙吊装到位,预制剪力墙位于两个预制柱之间;(2)在预...
【专利技术属性】
技术研发人员:李明,唐元昊,魏大勇,史永彬,
申请(专利权)人:沈阳建筑大学,
类型:发明
国别省市:辽宁,21