The invention discloses a construction method of bored grouting steel pipe pile with full-length casing follow-up, and adopts the full-length follow-up drilling method of Unit 2 to construct pile holes, so that casing supports pile holes in the whole process of pile hole formation, avoids collapse and shrinkage in the process of drilling, ensures the accuracy of pile diameter in the later period, and avoids pile breakage and other quality problems. Moreover, without the need of mud wall protection, the drilling time, mud discharge and construction progress are greatly shortened. Therefore, the invention can solve the problem of collapse and shrinkage of holes in the construction of sand and gravel layers, the problem of slurry loss in the grouting construction of sand and gravel layers, and the formed grouting steel pipe pile has high bearing capacity and can be guaranteed, and can be used for building foundation reinforcement. Cheng.
【技术实现步骤摘要】
一种采用套管全长跟进的钻孔注浆钢管桩施工方法
本专利技术涉及一种采用套管全长跟进的钻孔注浆钢管桩施工方法。
技术介绍
当前,社会在不断向前发展,科技创新在不断进步,我国建筑业经历了不同时期的发展,我国建筑日益增多,人民生产和生活对建筑要求地提高,过去建造的建筑,其建筑标准和技术已被更新替代,使用功能不能满足社会发展的需求,以及因增层改造和不均匀沉降等原因,结构可靠性不能满足要求,需要提高地基基础承载力,满足建筑物的安全。在实践中,在土质不良的地层中,为避免塌孔缩径,采用套管全长跟进的钻孔注浆钢管桩是一种比较常用的处理方法。微型桩一般是指用桩工机械或其他小型设备在土中形成直径不大于300mm的树根桩、预制水泥砂浆桩或钢管桩。采用套管全长跟进钻孔注浆钢管桩对建筑地基基础进行有效处理,通过钻孔注浆钢管桩施工,使地基基础能够承受更大的上部传递下来的荷载。
技术实现思路
本专利技术所要解决的技术问题是:提供一种采用套管全长跟进的钻孔注浆钢管桩施工方法。解决上述技术问题,本专利技术所采用的技术方案如下:一种采用套管全长跟进的钻孔注浆钢管桩施工方法,用于施工形成桩孔并在该桩孔内施工形成注浆钢管桩,其中,所述桩孔由地表向下穿透土层后深入岩层至所述注浆钢管桩的桩端持力层设计标高,其特征在于:所述的钻孔注浆钢管桩施工方法包括:步骤S1、制备多节套管和多节桩身钢管,其中,所述套管的外径等于所述桩孔的孔径,所述桩身钢管的外径小于所述套管的内径;步骤S2、用钻机和多节钻杆,按照全长跟进钻孔方式进行施工,以形成所述桩孔,所述全长跟进钻孔方式为:步骤A、将第1节所述钻杆和第1节所述套管分别 ...
【技术保护点】
1.一种采用套管全长跟进的钻孔注浆钢管桩施工方法,用于施工形成桩孔(PH)并在该桩孔(PH)内施工形成注浆钢管桩,其中,所述桩孔(PH)由地表(H0)向下穿透土层后深入岩层(H1)至所述注浆钢管桩的桩端持力层设计标高(H2),其特征在于:所述的钻孔注浆钢管桩施工方法包括:步骤S1、制备多节套管(1)和多节桩身钢管(2),其中,所述套管(1)的外径等于所述桩孔(PH)的孔径,所述桩身钢管(2)的外径小于所述套管(1)的内径;步骤S2、用钻机和多节钻杆(3),按照全长跟进钻孔方式进行施工,以形成所述桩孔(PH),所述全长跟进钻孔方式为:步骤A、将第1节所述钻杆(3)和第1节所述套管(1)分别连接在所述钻机上,使得第1节所述钻杆(3)位于第1节所述套管(1)内部的轴线位置,且第1节所述钻杆(3)的下端安装有主钻头,所述第1节所述套管(1)的下端安装有套管钻头,所述主钻头和套管钻头的钻孔尺寸与所述套管(1)的外径相等;步骤B、用所述钻机通过第1节所述钻杆(3)驱动所述主钻头由所述地表(H0)向下钻孔,使得所述套管钻头和第1节所述套管(1)跟随所述主钻头向下;并且,在达到预定的进尺深度后控制所述 ...
【技术特征摘要】
1.一种采用套管全长跟进的钻孔注浆钢管桩施工方法,用于施工形成桩孔(PH)并在该桩孔(PH)内施工形成注浆钢管桩,其中,所述桩孔(PH)由地表(H0)向下穿透土层后深入岩层(H1)至所述注浆钢管桩的桩端持力层设计标高(H2),其特征在于:所述的钻孔注浆钢管桩施工方法包括:步骤S1、制备多节套管(1)和多节桩身钢管(2),其中,所述套管(1)的外径等于所述桩孔(PH)的孔径,所述桩身钢管(2)的外径小于所述套管(1)的内径;步骤S2、用钻机和多节钻杆(3),按照全长跟进钻孔方式进行施工,以形成所述桩孔(PH),所述全长跟进钻孔方式为:步骤A、将第1节所述钻杆(3)和第1节所述套管(1)分别连接在所述钻机上,使得第1节所述钻杆(3)位于第1节所述套管(1)内部的轴线位置,且第1节所述钻杆(3)的下端安装有主钻头,所述第1节所述套管(1)的下端安装有套管钻头,所述主钻头和套管钻头的钻孔尺寸与所述套管(1)的外径相等;步骤B、用所述钻机通过第1节所述钻杆(3)驱动所述主钻头由所述地表(H0)向下钻孔,使得所述套管钻头和第1节所述套管(1)跟随所述主钻头向下;并且,在达到预定的进尺深度后控制所述钻机停止,使得第1节所述套管(1)嵌入在所述主钻头所钻开的钻孔中,且第1节所述套管(1)的上端在所述地表(H0)上露出;步骤C、松开第i节所述钻杆(3)和第i节所述套管(1)与所述钻机的连接,将第i+1节所述钻杆(3)的下端与第i节所述钻杆(3)的上端共轴连接固定,将第i+1节所述套管(1)的下端与第i节所述套管(1)的上端共轴连接固定,并且,将第i+1节所述钻杆(3)和第i+1节所述套管(1)分别连接在所述钻机上;其中,i为已嵌入在所述主钻头所钻开的钻孔中的所述套管(1)的数量;步骤D、用所述钻机通过第1节至第i+1节所述钻杆(3)驱动所述主钻头向下钻孔,使得所述套管钻头和第1节至第i+1节所述套管(1)跟随所述主钻头向下;并且,在达到预定的进尺深度后控制所述钻机停止,使得第1节至第i+1节所述套管(1)嵌入在所述主钻头所钻开的钻孔中,且第i+1节所述套管(1)的上端在所述地表(H0)上露出;步骤E、重复所述步骤C和步骤D,直至第1节至第n节所述套管(1)所连接形成的通长套管(1’)嵌入在所述主钻头所钻开的钻孔中,其中,n为大于1的正整数,且n的取值符合:第1节所述套管(1)的下端达到所述注浆钢管桩的桩端持力层设计标高(H2);此时,所述主钻头所钻开的钻孔即为所述桩孔(PH);步骤S3、对所述桩孔(PH)进行清孔,以清除钻孔时在所述桩孔(PH)内形成的泥浆,并且,先控制所述钻机将所述桩孔(PH)中的全部所述钻杆(3)和主钻头取出,再将多节所述桩身钢管(2)逐一放入所述桩孔(PH)中,且各节所述桩身钢管(2)按放入次序依次首尾连接组成钢管桩身,该钢管桩身与所述桩孔(PH)共轴,该钢管桩身的下端伸至所述桩孔(PH)的孔底、上端在所述地表(H0)上露出,其中,所述钢管桩身的最上端管段上无水泥砂浆流通孔(2a),除此之外,组成所述钢管桩身的剩余管段的每一节所述桩身钢管(2)上均开设有多个所述水泥砂浆流通孔(2a),所述钢管桩身的最上端管段的竖向长度在2m至3m之间;步骤S4、向由多节所述桩身钢管(2)组成的钢管桩身内灌注水泥砂浆,并取出所述通长套管(1’),令所述水泥砂浆灌满所述钢管桩身,且所述水泥砂浆通过所述水泥砂浆流通孔(2a)流入并灌满所述桩孔(PH),使得所述钢管桩身内外的水泥砂浆凝固形成水泥砂浆桩身(4),且该水泥砂浆桩身(4)与由多节所述桩身钢管(2)组成的钢管桩身结合形成所述注浆钢管桩。2.根据权利要求1所述采用套管全长跟进的钻孔注浆钢管桩施工方法,其特征在于:所述套管(1)的上端和下端中的任意一者设有内丝牙、另一者设有外丝牙,第i+1节所述套管(1)的下端与第i节所述套管(1)的上端通过丝牙连接方式连接固定;所述桩身钢管(2)的两端分别设有内丝牙和外丝牙,相邻两节所述桩身钢管(2)通过丝牙连接方式连接固定。3.根据权利要求1或2所述采用套管...
【专利技术属性】
技术研发人员:吕文龙,潘景斌,刘恋,吴亚春,刘春红,
申请(专利权)人:广东省建筑科学研究院集团股份有限公司,广东建科建筑工程技术开发有限公司,
类型:发明
国别省市:广东,44