An air conditioning pipeline pressure test assembly includes a first connection port and a second connection port, the first connection port is connected with one end of the first cut-off valve through the pipeline, the other end of the first cut-off valve is connected with one end of the check valve through the first pipeline, the other end of the check valve is connected with one end of the second cut-off valve through the pipeline, and the other end of the second cut-off valve is connected with the other end of the second cut-off valve. The pipeline is connected with the second connection port; the side of the first pipeline is connected with one end of the third cut-off valve through the pipeline, and the other end of the third cut-off valve is connected with a pressure gauge through the pipeline. The pressure test assembly of the air conditioning pipeline of the utility model can accurately measure the pressure in the air conditioning pipeline, and the leakage gas in the air conditioning pipeline to be measured is less.
【技术实现步骤摘要】
一种空调管道试压组件
本技术涉及一种空调管道试压组件,属于机电工程
技术介绍
众所周知,当前社会大众物质生活条件不断改善,大众对于居住空间以及公共建筑中环境舒适度的要求也不断提高。暖通空调系统作为改善建筑室内环境舒适度的重要系统之一,在现代建筑中占据着非常重要的地位。但结合既往经验来看,在暖通空调系统安装中仍然存在一定的问题与不足。相关人员必须提高对暖通空调系统安装施工重要性的认识,引入项目管理理念,积极改进暖通空调系统安装施工中存在的各种问题,以提高系统运行质量。当前,暖通空调系统安装施工中仍然面临着一定的问题与不足,如管线标高与标注不够准确、噪声超标等。其中,管线标高与标注不够准确是指:综合管线设计要求对建筑物内相关管线工程进行统一规划与安排,以明确工程设计中存在的各种问题,及时发现单项工程中布置走向不合理或与其他工程管线存在矛盾与冲突的地方,以便及时提出处理意见,对管线位置进行综合调整,使各类管线在建筑空间中的布局关系更为科学与合理。而导致综合管线设计出现上述问题的最主要原因是暖通空调施工前期未针对设计图纸进行详细校对,施工图存在定位交叉严重以及管 ...
【技术保护点】
1.一种空调管道试压组件,其特征在于:包括第一连接口和第二连接口,所述第一连接口通过管路与一第一切断阀的一端连接,所述第一切断阀的另一端通过第一管路与一止回阀的一端连接,所述止回阀的另一端通过管路与一第二切断阀的一端连接,所述第二切断阀的另一端通过管路与所述第二连接口连接;所述第一管路的侧部通过管路与一第三切断阀的一端连通,所述第三切断阀的另一端通过管路与一压力表连通。
【技术特征摘要】
1.一种空调管道试压组件,其特征在于:包括第一连接口和第二连接口,所述第一连接口通过管路与一第一切断阀的一端连接,所述第一切断阀的另一端通过第一管路与一止回阀的一端连接,所述止回阀的另一端通过管路与一第二切断阀的一端连接,所述第...
【专利技术属性】
技术研发人员:李少奇,何燕,曹裕怀,赵俊中,
申请(专利权)人:合肥元鼎机电工程有限公司,
类型:新型
国别省市:安徽,34
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。