The utility model relates to the technical field of material hoisting for bridge construction, in particular to a material hoisting device for bridge construction, which comprises a bottom plate. The upper four corners of the bottom plate are fixed with supporting rods, and the edge of the bottom plate is close to the adjacent two supporting rods. There are installation grooves between the two inner ends of the installation groove. A support column is fixed and installed, and a telescopic baffle plate is installed in the installation groove, and a connecting rod is rotated and installed at the bottom of the telescopic baffle plate. The two ends of the connecting rod are rotated and connected with the two supporting columns through the connecting shaft respectively. The sliding blocks are installed through screws in the sliding groove, and the two ends of the installation plate are respectively connected with two sliding blocks. Connection, the top of the four supporting rods are all provided with connection grooves, and the connection blocks are movably installed in the connection grooves. The connection blocks are all provided with suspension holes. The utility model has simple structure, easy to adjust the material lifting capacity of the lifting frame, strong applicability and easy to use.
【技术实现步骤摘要】
一种桥梁施工用材料运送升降设备
本技术涉及桥梁施工材料吊运
,尤其涉及一种桥梁施工用材料运送升降设备。
技术介绍
在桥梁施工的现场经常需要将一些材料运输至高处,以便进行施工建设。现有的将货物提升至高处的方式主要通过提升机进行,但现有的提升机用运料框的材料运送量固定,不能够调节,实用性差,不方便使用。
技术实现思路
本技术的目的是为了解决现有技术中存在不能够调节,实用性差等缺点,而提出的一种桥梁施工用材料运送升降设备。为了实现上述目的,本技术采用了如下技术方案:设计一种桥梁施工用材料运送升降设备,包括底板,所述底板的上部四角均固定安装有支撑杆,所述底板边缘靠近相邻的两根支撑杆之间均开设有安装槽,所述安装槽的内侧两端均固定安装有支撑柱,所述安装槽内安装有伸缩挡板,所述伸缩挡板的底部转动安装有连接杆,所述连接杆的两端分别通过连接轴与两根支撑柱转动连接,所述伸缩挡板的上部活动连接有安装板,所述支撑杆侧壁靠近安装槽的两端均开设有滑槽,所述滑槽内均通过螺钉安装有滑块,所述安装板的两端分别与两个滑块连接,四根所述支撑杆的顶部均开设有连接槽,所述连接槽内均活动安装有连接块,所述连接块上均开设有吊孔。优选的,所述伸缩挡板包括若干连接板和连接件,相邻的两块所述连接板之间通过连接件连接。优选的,所述连接杆的两端均开设有凹槽,所述连接轴插设在凹槽内。优选的,所述支撑柱焊接在安装槽内。本技术提出的一种桥梁施工用材料运送升降设备,有益效果在于:通过在底板的上部边缘开设安装槽,在安装槽内活动安装伸缩挡板,便于调节吊运量,便于使用,通过在支撑柱的侧壁靠近安装槽的两端均开设滑槽,在滑槽内安装 ...
【技术保护点】
1.一种桥梁施工用材料运送升降设备,包括底板(10),所述底板(10)的上部四角均固定安装有支撑杆(4),其特征在于:所述底板(10)边缘靠近相邻的两根支撑杆(4)之间均开设有安装槽(11),所述安装槽(11)的内侧两端均固定安装有支撑柱(12),所述安装槽(11)内安装有伸缩挡板(9),所述伸缩挡板(9)的底部转动安装有连接杆(7),所述连接杆(7)的两端分别通过连接轴(13)与两根支撑柱(12)转动连接,所述伸缩挡板(9)的上部活动连接有安装板(8),所述支撑杆(4)侧壁靠近安装槽(11)的两端均开设有滑槽(5),所述滑槽(5)内均通过螺钉安装有滑块(6),所述安装板(8)的两端分别与两个滑块(6)连接,四根所述支撑杆(4)的顶部均开设有连接槽(3),所述连接槽(3)内均活动安装有连接块(2),所述连接块(2)上均开设有吊孔(1)。
【技术特征摘要】
1.一种桥梁施工用材料运送升降设备,包括底板(10),所述底板(10)的上部四角均固定安装有支撑杆(4),其特征在于:所述底板(10)边缘靠近相邻的两根支撑杆(4)之间均开设有安装槽(11),所述安装槽(11)的内侧两端均固定安装有支撑柱(12),所述安装槽(11)内安装有伸缩挡板(9),所述伸缩挡板(9)的底部转动安装有连接杆(7),所述连接杆(7)的两端分别通过连接轴(13)与两根支撑柱(12)转动连接,所述伸缩挡板(9)的上部活动连接有安装板(8),所述支撑杆(4)侧壁靠近安装槽(11)的两端均开设有滑槽(5),所述滑槽(5)内均通过螺钉安装有滑块(6),所述安装板...
【专利技术属性】
技术研发人员:田磊,陈龙,李远洋,孔令朋,张博,邹英英,
申请(专利权)人:张昭,
类型:新型
国别省市:河南,41
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。