The utility model discloses a prestressed pipe pile pull-out test anchorage device, which comprises a concrete cushion, in which a pipe pile is embedded and a core-filled concrete is arranged. The top of the concrete cushion is symmetrically fixed with two supporting columns and two guiding columns, and both guiding columns are located. Between the two supporting pillars, one end of the two supporting pillars away from the concrete cushion is connected with the main beam, and the main beam is located above the pipe pile, one end of the two guiding pillars away from the concrete cushion is penetrated through the main beam, and the guiding sleeve of the pull-down beam and the guiding sleeve of the pull-up beam are arranged on the two guiding pillars, and the utility model is provided with the pull-down beam guiding sleeve. Two guide columns, two guide sleeves of pull-down beams and two guide sleeves of pull-up beams were used to fix the two ends of the pull-down beams and the two guide sleeves of the pull-up beams on the two guide columns respectively. The deflection of the pull-down beams and the pull-up beams was prevented by the guide columns.
【技术实现步骤摘要】
一种预应力管桩抗拔试验锚固装置
本技术属于混凝土管桩
,具体涉及一种预应力管桩抗拔试验锚固装置。
技术介绍
随着我国国民经济的快速发展以及工程技术的不断进步,我国的建筑行业也取得了巨大的进步,当前,在建筑工程施工中,预应力混凝土管桩具有抗裂性好、施工速度快、桩身强度高等优点,在建筑工程中得到广泛应用,研究预应力混凝土管桩抗拔静载试验具有重要的现实意义。目前,现有的预应力管桩抗拔试验中大多采用焊接的连接方式,该种连接方式容易导致焊接部分不牢固,使管桩发生偏心的问题,从而影响试验数据和试验结果。
技术实现思路
本技术的目的在于提供一种预应力管桩抗拔试验锚固装置,以解决上述
技术介绍
中提出采用焊接的连接方式容易导致焊接部分不牢固,使管桩发生偏心,影响试验数据和试验结果的问题。为实现上述目的,本技术提供如下技术方案:一种预应力管桩抗拔试验锚固装置,包括混凝土垫层,所述混凝土垫层的内部嵌入有管桩,且管桩的内部设置有填芯混凝土,所述混凝土垫层的顶部对称固定有两个支撑柱和两个导向柱,且两个导向柱均位于两个支撑柱之间,两个所述支撑柱远离混凝土垫层的一端均与主梁连接,且主梁位于管桩的上方,两个所述导向柱远离混凝土垫层的一端均贯穿主梁,且两个导向柱上均套设有下拉梁导向套和上拉梁导向套,两个所述下拉梁导向套分别位于两个上拉梁导向套的下方,两个所述下拉梁导向套之间连接有下拉梁,且下拉梁的底部与管桩通过两个纵向螺栓固定连接,所述下拉梁底部连接的两个固定块对称位于管桩的两侧,且两个固定块均与管桩通过横向螺栓固定连接,两个所述上拉梁导向套之间连接有上拉梁,且上拉梁位于主梁的上方,所述上拉梁 ...
【技术保护点】
1.一种预应力管桩抗拔试验锚固装置,包括混凝土垫层(3),其特征在于:所述混凝土垫层(3)的内部嵌入有管桩(2),且管桩(2)的内部设置有填芯混凝土(1),所述混凝土垫层(3)的顶部对称固定有两个支撑柱(5)和两个导向柱(8),且两个导向柱(8)均位于两个支撑柱(5)之间,两个所述支撑柱(5)远离混凝土垫层(3)的一端均与主梁(6)连接,且主梁(6)位于管桩(2)的上方,两个所述导向柱(8)远离混凝土垫层(3)的一端均贯穿主梁(6),且两个导向柱(8)上均套设有下拉梁导向套(4)和上拉梁导向套(7),两个所述下拉梁导向套(4)分别位于两个上拉梁导向套(7)的下方,两个所述下拉梁导向套(4)之间连接有下拉梁(13),且下拉梁(13)的底部与管桩(2)通过两个纵向螺栓(12)固定连接,所述下拉梁(13)底部连接的两个固定块(15)对称位于管桩(2)的两侧,且两个固定块(15)均与管桩(2)通过横向螺栓(14)固定连接,两个所述上拉梁导向套(7)之间连接有上拉梁(10),且上拉梁(10)位于主梁(6)的上方,所述上拉梁(10)与主梁(6)之间连接有千斤顶(9),且上拉梁(10)与下拉梁(13 ...
【技术特征摘要】
1.一种预应力管桩抗拔试验锚固装置,包括混凝土垫层(3),其特征在于:所述混凝土垫层(3)的内部嵌入有管桩(2),且管桩(2)的内部设置有填芯混凝土(1),所述混凝土垫层(3)的顶部对称固定有两个支撑柱(5)和两个导向柱(8),且两个导向柱(8)均位于两个支撑柱(5)之间,两个所述支撑柱(5)远离混凝土垫层(3)的一端均与主梁(6)连接,且主梁(6)位于管桩(2)的上方,两个所述导向柱(8)远离混凝土垫层(3)的一端均贯穿主梁(6),且两个导向柱(8)上均套设有下拉梁导向套(4)和上拉梁导向套(7),两个所述下拉梁导向套(4)分别位于两个上拉梁导向套(7)的下方,两个所述下拉梁导向套(4)之间连接有下拉梁(13),且下拉梁(13)的底部与管桩(2)通过两个纵向螺栓(12)固定连接,所述下拉梁(13)底部连接的两个固定块(15)对称位于管桩(2)的两侧,且两个固定块(15)均与管桩...
【专利技术属性】
技术研发人员:张艳伟,
申请(专利权)人:天津市大地海陆岩土工程技术开发有限公司,
类型:新型
国别省市:天津,12
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。