The invention provides a grouting steel pipe pile foundation reinforcement system and its construction method. By embedding the static pressure pile anchor anchor back force frame on the floor of the building structure, the self weight load of the building structure can be used as the back force of the pile, and the pile section of the steel pipe pile is separated from the pile hole in the bottom of the floor or in the pile hole. When the section is pressed into the foundation, the construction is convenient, the working surface and the working space are small; when the pile is sealed, the anchor bar is connected with the anchor bar at the top of the steel pipe. The pile head is connected with the floor of the building structure by the non shrinkage grouting material to improve the bearing capacity of the foundation and control the settlement. Force conditions are designed to be long enough. In the lower part of the steel pipe pile, the restrained grouting is used to form the enlarged pile body and enhance the holding force between the pile body and the surrounding soil. Therefore, the bearing capacity of the single pile is enhanced after the grouting, and the pile head and the rigid connection of the pile foundation are combined to form the whole force.
【技术实现步骤摘要】
注浆钢管桩地基加固体系及其施工方法
本专利技术涉及建筑基础施工
,尤其涉及一种注浆钢管桩地基加固体系及其施工方法。
技术介绍
已投入使用的地下室结构由于地质勘察资料不充分造成的结构设计失误、建筑功能改变、使用荷载增大、桩基施工质量缺陷等原因,需要进行地基加固,传统地基加固体系存在加固效果不稳定、作业面及作业空间大、施工进度缓慢、造价高的缺点。
技术实现思路
鉴于上述现有技术中存在或潜在的不足之处,本专利技术提供了一种注浆钢管桩地基加固体系及其施工方法,其施工方法简便,作业面及作用空间较小,且能够保证较好的地基加固效果。为实现上述目的,本专利技术的第一方面提供了一种注浆钢管桩地基加固施工方法,其包括:于建筑结构的底板上设置钢管桩的压桩孔,并于所述压桩孔的周围埋设静压桩锚杆;于所述静压桩锚杆上固定压桩反力架,所述压桩反力架包括连接于所述静压桩锚杆的竖向支撑及安装于所述竖向支撑上的横向支撑;利用所述压桩反力架的所述横向支撑作为千斤顶的顶部支顶,所述千斤顶的底部支抵于钢管桩的桩段,将钢管桩的桩段从所述压桩孔内逐段压入底板下方的地基,进行钢管桩的沉桩,所述钢管桩的下端封闭,所述钢管桩的上端固接有锚固筋,所述钢管桩的部分桩段开设有注浆孔且外部包覆有注浆囊套;待完成所述钢管桩的沉桩后,于所述静压桩锚杆上拆除所述压桩反力架,采用联系筋将所述静压桩锚杆和所述锚固筋连接在一起;向所述钢管桩的内部进行注浆,浆液在填充所述钢管桩的内部的同时,透过部分桩段上开设的所述注浆孔进入到所述注浆囊套中,所述注浆囊套被撑开而形成扩大桩身部位;以及待完成所述钢管桩的注浆后,于所述压桩孔中填补 ...
【技术保护点】
1.一种注浆钢管桩地基加固施工方法,其特征在于,包括:于建筑结构的底板上设置钢管桩的压桩孔,并于所述压桩孔的周围埋设静压桩锚杆;于所述静压桩锚杆上固定压桩反力架,所述压桩反力架包括连接于所述静压桩锚杆的竖向支撑及安装于所述竖向支撑上的横向支撑;利用所述压桩反力架的所述横向支撑作为千斤顶的顶部支顶,所述千斤顶的底部支抵于钢管桩的桩段,将钢管桩的桩段从所述压桩孔内逐段压入底板下方的地基,进行钢管桩的沉桩,所述钢管桩的下端封闭,所述钢管桩的上端固接有锚固筋,所述钢管桩的部分桩段开设有注浆孔且外部包覆有注浆囊套;待完成所述钢管桩的沉桩后,于所述静压桩锚杆上拆除所述压桩反力架,采用联系筋将所述静压桩锚杆和所述锚固筋连接在一起;向所述钢管桩的内部进行注浆,浆液在填充所述钢管桩的内部的同时,透过部分桩段上开设的所述注浆孔进入到所述注浆囊套中,所述注浆囊套被撑开而形成扩大桩身部位;以及待完成所述钢管桩的注浆后,于所述压桩孔中填补封桩料,进行封桩,并将所述静压桩锚杆、所述锚固筋和所述联系筋埋设于封桩料中。
【技术特征摘要】
1.一种注浆钢管桩地基加固施工方法,其特征在于,包括:于建筑结构的底板上设置钢管桩的压桩孔,并于所述压桩孔的周围埋设静压桩锚杆;于所述静压桩锚杆上固定压桩反力架,所述压桩反力架包括连接于所述静压桩锚杆的竖向支撑及安装于所述竖向支撑上的横向支撑;利用所述压桩反力架的所述横向支撑作为千斤顶的顶部支顶,所述千斤顶的底部支抵于钢管桩的桩段,将钢管桩的桩段从所述压桩孔内逐段压入底板下方的地基,进行钢管桩的沉桩,所述钢管桩的下端封闭,所述钢管桩的上端固接有锚固筋,所述钢管桩的部分桩段开设有注浆孔且外部包覆有注浆囊套;待完成所述钢管桩的沉桩后,于所述静压桩锚杆上拆除所述压桩反力架,采用联系筋将所述静压桩锚杆和所述锚固筋连接在一起;向所述钢管桩的内部进行注浆,浆液在填充所述钢管桩的内部的同时,透过部分桩段上开设的所述注浆孔进入到所述注浆囊套中,所述注浆囊套被撑开而形成扩大桩身部位;以及待完成所述钢管桩的注浆后,于所述压桩孔中填补封桩料,进行封桩,并将所述静压桩锚杆、所述锚固筋和所述联系筋埋设于封桩料中。2.如权利要求1所述的注浆钢管桩地基加固施工方法,其特征在于:开设有所述注浆孔的部分桩段位于所述钢管桩的底部位置。3.如权利要求2所述的注浆钢管桩地基加固施工方法,其特征在于:开设有所述注浆孔的部分桩段位于所述钢管桩的底部末尾两节桩段,每节所述桩段上沿桩周均匀开设有多个所述注浆孔。4.如权利要求3所述的注浆钢管桩地基加固施工方法,其特征在于:所述注浆囊套的两端开口并无缝套接于对应桩段的外壁,所述注浆囊套的中部在注浆后呈弧形向外鼓入所述地基中。5.如权利要求1所述的注浆钢管桩地基加...
【专利技术属性】
技术研发人员:赵中兴,胡大伟,罗亚楠,韩凯,李战强,林哲,
申请(专利权)人:中国建筑第八工程局有限公司,
类型:发明
国别省市:上海,31