A method of anti weathering and holistic closure of surrounding rock belongs to the technical field of roadway support, which can solve the problem of the bad effect of the existing roadway anti weathering methods, including the timely grouting sealing and bolt sealing in the surrounding rock of the roadway, in which the timely grouting of the surrounding rock of the roadway is closed to the undamaged integrity of the surrounding rock, that is, the roadway support is completed 2 to 3. After the cycle, the grouting is timely, the thickness of the spray layer is 2 3mm, the nudity time of the roadway is less than 8h; the bolt is sealed by the bolt, and the grouting seal is closed to the non anchoring section, the slurry is solidified in the 1min, and the tray is added after the space is closed in the hole, and the pretightening force is applied. The method of the invention ensures the strength of the surrounding rock structure, improves the self stabilizing time, and further enhances the strength of the deep surrounding rock.
【技术实现步骤摘要】
一种围岩防风化整体封闭的方法
本专利技术属于巷道支护
,特别是节理裂隙发育的煤矿受风化影响变形明显的回采巷道的支护,具体涉及一种围岩防风化整体封闭的方法。
技术介绍
对于煤层及其直接顶、底板,具有节理裂隙较发育的煤矿,其巷道围岩具有结构强度低、自稳时间短等力学特征。巷道开挖后,裸露围岩会受风流、水的影响,其强度会降低;同时,锚杆锚索锚固后,锚杆锚索孔仍然可与空气接触,进一步降低了深部围岩的强度。因此,防止井下通风侵蚀所引起的风化作用,是维护围岩结构、保持围岩自稳能力的又一技术关键,通常未引起重视。传统的巷道一般采用滞后喷浆或砌碹:(1)滞后喷浆:常规的掘进巷道喷浆一般滞后于掘进头40~50m,对于节理裂隙发育的围岩,在围岩暴露至喷浆期间,围岩较长时间暴露于风流及潮湿环境中,围岩强度会有较大程度的降低。(2)砌碹:砌碹是指在围岩外围砌筑墙体,增强围岩自稳能力。砌碹不仅耗时,工序多,而且也不能达到及时封闭围岩的作用。同时,砌碹墙体层并未达到与实体围岩(煤)体紧密结合,裸露围岩(煤)体仍然与空气接触。
技术实现思路
本专利技术针对现有巷道防风化的方法效果不好的问题,提供一种围岩防风化整体封闭的方法。本专利技术采用如下技术方案:一种围岩防风化整体封闭的方法,包括巷道围岩及时喷浆封闭和锚杆封空,其中,巷道围岩及时喷浆封闭在围岩整体性未破坏之前,即在巷道支护完成2-3个循环后,及时喷浆,喷层厚度2-3mm,巷道裸露时间小于8h;锚杆封空,在锚杆药包凝固后,对非锚固段进行封孔注浆封闭,浆液在1min内凝固,孔内空间封闭后加托盘,施加预紧力。巷道围岩及时喷浆封闭包括如下 ...
【技术保护点】
1.一种围岩防风化整体封闭的方法,其特征在于:包括巷道围岩及时喷浆封闭和锚杆封空,其中,巷道围岩及时喷浆封闭在围岩整体性未破坏之前,即在巷道支护完成2‑3个循环后,及时喷浆,喷层厚度2‑3mm,巷道裸露时间小于8h;锚杆封空,在锚杆药包凝固后,对非锚固段进行封孔注浆封闭,浆液在1min内凝固,孔内空间封闭后加托盘,施加预紧力。
【技术特征摘要】
1.一种围岩防风化整体封闭的方法,其特征在于:包括巷道围岩及时喷浆封闭和锚杆封空,其中,巷道围岩及时喷浆封闭在围岩整体性未破坏之前,即在巷道支护完成2-3个循环后,及时喷浆,喷层厚度2-3mm,巷道裸露时间小于8h;锚杆封空,在锚杆药包凝固后,对非锚固段进行封孔注浆封闭,浆液在1min内凝固,孔内空间封闭后加托盘,施加预紧力。2.根据权利要求1所述的一种围岩防风化整体封闭的方法,其特征在于:巷道围岩及时喷浆封闭包括如下步骤:第一步,调整上料斗底部的干粉进料口;第二步,打开进水阀门,调整浮子流量计上的流量阀,使浮子流量计上端平面对齐550刻度位置,10~20秒后达到开机水量;第三步,启动电源,将设备及喷浆软管内的清水泵出,待喷枪出口水流稳定后,向上料斗内连续、缓慢、匀速加入预先备好的湿喷材料;第四步,开始正常喷浆,打开气源并调好大小,手持喷枪,按照先上后下的顺序,进行循环喷浆作业;第五步,待设备料斗内所有干料全部喷射完成后,操作浮子流量计上面的流量阀,将水量调大,同时,将事先备...
【专利技术属性】
技术研发人员:杨竹军,李文龙,胡红伟,张智杰,梁海楠,韩瑞军,张鹤,徐慧芳,
申请(专利权)人:山西晋城无烟煤矿业集团有限责任公司,
类型:发明
国别省市:山西,14