The invention discloses a high building foundation piling machine, including steel bracket, piling work table, vibration rods, hoist, sling, two auxiliary hoist, motor vehicle and sectional pile pipe, the steel bracket in a motor vehicle, the vibration rod will be segmented pile pipe all pipe section by section down in the foundation, and through the two rope festival will be segmented by piling pipe in pipe all pulled out from the ground; the bottom of the vibration rod is provided with a column on both sides of the pipe column is provided with a hook, the hook, used to the hanging rings. By adopting the above structure form, the segmental piling pipe can be used to construct piling in the high limit section safely, and also reduce the construction cost. The invention has the characteristics of simple operation and high construction efficiency.
【技术实现步骤摘要】
高效型高楼地基打桩机
本专利技术涉及一种高楼地基打桩机械,具体是一种高楼地基打桩机。
技术介绍
高楼地基打桩的作业设备,是将一根很长的打桩管下入到地基中,这种施工方式,要求钢质支架必须很高,这种很高的钢质支架不仅加大了施工成本,而且还受到工作环境的限制,在限高的环境下,无法作业。
技术实现思路
本专利技术的目的在于提出一种施工效率高,施工成本低的高效型高楼地基打桩机。本专利技术采用的技术方案如下:高效型高楼地基打桩机,其特征在于:包括钢质支架、打桩工作台、振动棒、卷扬机、两根吊绳和分节式打桩管,所述打桩工作台架设在钢质支架上,所述分节式打桩管是由多个管段对接而成,每个管段的上端部设有管套,管套的直径大于管段的直径,所述分节式打桩管的低端管段或管段上的管套的两侧设有吊耳,顶端管段的侧壁上且靠近上端部的位置开有打桩料投放端口,所述卷扬机通过牵引绳带动振动棒上下移动,两根吊绳的下端分别与低端管段或管段上的管套上的两个吊耳连接,所述振动棒将分节式打桩管的所有管段逐节向下打入地基中,并通过两根吊绳逐节将分节式打桩管中的所有管段从地基中拔出;所述两根吊绳上都间隔分布有与管段数量相 ...
【技术保护点】
一种高效型高楼地基打桩机,其特征在于:包括钢质支架、打桩工作台、振动棒、卷扬机、两根吊绳和分节式打桩管,所述打桩工作台架设在钢质支架上,所述分节式打桩管是由多个管段对接而成,每个管段的上端部设有管套,管套的直径大于管段的直径,所述分节式打桩管的低端管段或管段上的管套的两侧设有吊耳,顶端管段的侧壁上且靠近上端部的位置开有打桩料投放端口,所述卷扬机通过牵引绳带动振动棒上下移动,两根吊绳的下端分别与低端管段或管段上的管套上的两个吊耳连接,所述振动棒将分节式打桩管的所有管段逐节向下打入地基中,并通过两根吊绳逐节将分节式打桩管中的所有管段从地基中拔出;所述两根吊绳上都间隔分布有与管段 ...
【技术特征摘要】
1.一种高效型高楼地基打桩机,其特征在于:包括钢质支架、打桩工作台、振动棒、卷扬机、两根吊绳和分节式打桩管,所述打桩工作台架设在钢质支架上,所述分节式打桩管是由多个管段对接而成,每个管段的上端部设有管套,管套的直径大于管段的直径,所述分节式打桩管的低端管段或管段上的管套的两侧设有吊耳,顶端管段的侧壁上且靠近上端部的位置开有打桩料投放端口,所述卷扬机通过牵引绳带动振动棒上下移动,两根吊绳的下端分别与低端管段或管段上的管套上的两个吊耳连接,所述振动棒将分节式打桩...