The utility model discloses a prefabricated wall connecting structure includes a first wall, second precast prefabricated wall, I-shaped joints, prefabricated wall in the first and second ends of the prefabricated wall are respectively provided with a semi H-shaped hole, 2.5 I-shaped hole group synthesis I-shaped hole; both ends of the I-shaped hole width is L2, the middle I-shaped hole width L1, L1 < L2, I-shaped connection insert I-shaped hole, the first prefabricated wall and second prefabricated wall connection. The utility model has the advantages of ingenious structure, good stability, reliable performance, and waterproof and sealing effect.
【技术实现步骤摘要】
一种预制墙连接结构
本技术涉及建筑领域,特别涉及一种预制墙连接结构。
技术介绍
随着技术发展和国家现代化进程的加快,人们对建筑建造的技术要求也大幅提高。传统的现浇施工和现场砌筑湿作业量大,模板工程量大,施工速度慢,人工需求多,已经越来越不满足现代社会建筑建造的快速步伐。建筑工业化的快速发展,将大大降低住宅的建造成本,而且能够较大地提高建筑的修建速度,因此可以让更多国民较快地住上便宜舒适的住宅。一方面,采用工业化方式修建房屋,可以大量地节省劳动力和缩短工期,一层楼的修建时间由原本的7天减少到现在5天,工期缩短近1/3,高峰期需要的劳动工人数目由240人左右减少到70人左右;另一方面,采用工业化生产方式,建筑的预制率提高了,可以使施工现场模板的用量以及现场脚手架的用量减少,节约钢材和混凝土的使用,水电、耗能耗材等,当前我国从事建筑业的民工普遍出现老龄化趋势,年轻一代不愿从事繁重的体力劳动等原因导致了建筑工人不能得到很好的补充,可以预见,将来建筑工人数量将会锐减,建筑业发展将会面临巨大的难题。因此,加速建筑业的工业化水平,减少人工需求量,是建筑业发展的一个必然趋势。装配整体式建筑是建筑业工业化的方式之一,将建筑构件在预制厂里提前制作好,直接运输到现场进行拼装,并在节点处现浇形成整体,整个施工过程湿作业量和模板工程量小,施工速度快,人工需求少,产品质量稳定并易于控制,可以形成工业化的生产建造线,是适应时代的现代化建筑施工方法。目前,两个预制墙连接一般采用现浇形成整体,施工周期长,劳动强度大。
技术实现思路
有鉴于此,本技术提出一种预制墙连接结构,包括第一预制墙、第二预制墙 ...
【技术保护点】
一种预制墙连接结构,其特征在于,包括第一预制墙、第二预制墙、工字型连接件,在第一预制墙和第二预制墙端部均开设有半工字型孔,两个半工字型孔组合成工字型孔;工字型孔两端宽度为L2,工字型孔中间宽度为L1,L1<L2,工字型连接件插入工字型孔内,使第一预制墙和第二预制墙连接。
【技术特征摘要】
1.一种预制墙连接结构,其特征在于,包括第一预制墙、第二预制墙、工字型连接件,在第一预制墙和第二预制墙端部均开设有半工字型孔,两个半工字型孔组合成工字型孔;工字型孔两端宽度为L2,工字型孔中间宽度为...
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。