The invention relates to a method for preventing steel mining equipment foundation grouting inclined, concrete steps are as follows: (1) artificial leveling hardening on the basis of pit bottom and laying concrete cushion; (2) binding reinforced, and continued in the bottom of the reinforced concrete pouring anti tilt vertical stability (3) to be reinforced with anti tilt concrete after solidification then, concrete pouring. The invention can ensure that the steel bars assembled by the equipment foundation pit can be highly consistent, perpendicular to the bottom plate, and the force is even, the pouring quality of the concrete is high, and the durability of the equipment is good.
【技术实现步骤摘要】
一种矿山设备基础浇筑防止钢筋倾斜的方法
本专利技术涉及混凝土浇筑工程,具体涉及一种矿山设备基础浇筑防止钢筋倾斜的方法。
技术介绍
矿山井上下大中小型设备种类繁多,其基础浇筑工程的质量对设备的安全稳定性起着至关重要的作用。但由于设备基础多挖掘在岩石中,因现有的技术和工艺很难做到基础坑底部平整度较高,往往造成需绑扎的钢筋倾斜,高低不平,引起基础墩水平面保护层严重超厚、钢筋密度变化,甚至浇筑收尾时还需补扎钢筋,同样因为钢筋稳固性差,在浇筑混凝土时,钢筋受挤压倾斜,最终使钢筋受力不均,影响基础浇筑质量。
技术实现思路
本专利技术所要解决的技术问题在于针对上述现有技术的不足,提供一种矿山设备基础浇筑防止钢筋倾斜的方法。为解决上述技术问题,本专利技术采用的具体步骤如下:(1)对基础坑底部进行人工找平硬化并铺设混凝土垫层;(2)绑扎钢筋,并继续在底部浇筑防倾斜混凝土使钢筋垂直稳固(3)待钢筋与防倾斜混凝土凝固后,再进行混凝土浇筑。所述步骤(1)的具体方法为:利用风镐等凿岩设备,人工对基础坑底部进行找平,使基础坑底部基本平整,然后铺设1~3cm厚的混凝土垫层把底部垫平。所述步骤(2)待步骤(1)铺设的混凝土垫层达到初凝后,即在基础坑内绑扎钢筋,保证钢筋符合设计要求,高度一致,垂直于基础坑底板,然后再根据基础坑大小浇筑厚度100~200cm的防倾斜混凝土对绑扎好的钢筋下端进行稳固。所述步骤(3)待步骤(2)铺设的防倾斜混凝土达到初凝后,即进行最终的混凝土浇筑。本专利技术可以确保设备基础坑绑扎的钢筋能够高度一致、垂直于底板且受力均匀,混凝土浇筑质量高,具有较好的耐久性。附图说明图 ...
【技术保护点】
一种矿山设备基础浇筑防止钢筋倾斜的方法,包括步骤如下: 第一步对基础坑(4)底部进行人工找平硬化并铺设混凝土垫层(1); 第二步绑扎钢筋后,并继续在底部浇筑防倾斜混凝土(2)使钢筋(3)垂直稳固; 第三步待钢筋(3)与防倾斜混凝土(2)达到初凝后,再进行混凝土浇筑。
【技术特征摘要】
1.一种矿山设备基础浇筑防止钢筋倾斜的方法,包括步骤如下:第一步对基础坑(4)底部进行人工找平硬化并铺设混凝土垫层(1);第二步绑扎钢筋后,并继续在底部浇筑防倾斜混凝土(2)使钢筋(3)垂直稳固;第三步待钢筋(3)与防倾斜混凝土(2)达到初凝后,再进行混凝土浇筑。2.根据权利要求1所述一种矿山设备基础浇筑防止钢筋倾斜的方法,其特征在于,所述步骤一必须对基础坑找...