The invention discloses a method for repairing hollowing, which comprises the following steps: A, B, ready to repair work; drilling; C, slurry preparation; D, the head of Grouting grouting grouting, grouting at the junction of the head mouth between plastering layer and base; for larger hollowing of the staged grouting; grouting by low pressure grouting, the hollowing repair method for repairing wall plastering layer hollowing or floors hollowing. The hollowing repair method of reasonable design, has the advantages of environmental protection, saving cost, short construction period and good durability, is an effective method to repair the hollowing.
【技术实现步骤摘要】
一种空鼓修复方法
本专利技术涉及一种建筑领域,具体是一种空鼓修复方法。
技术介绍
墙面抹灰空鼓或楼地面空鼓是建筑施工中的质量通病,一直以来均没有得到有效解决,尤其是新的施工验收规范要求做到零空鼓,使施工耗费了大量的人力物力和时间,且按照传统方法处理仍然难以达到施工规范的要求。本专利技术就是为了从技术上解决这一施工质量通病。建筑墙面或楼地面空鼓是由于原墙体或楼地面基层和面层之间粘接不牢或未粘结存在缝隙引起的,检测的时候,用空鼓锤或硬物轻敲面层发出咚咚声为空鼓。用肉眼观看,其空鼓部位一般会略高出四周整体平面,并常常伴有裂缝。用小锤逐一轻轻敲击,可听见与其他部位声音不同的空响,此处即为“空鼓”。建筑物墙体抹灰砂浆或楼地面面层在施工过程中,由于工人操作或材料等原因经常会出现面层与基层粘结不牢,产生开裂,在基层与面层之间现出间隙,俗称空鼓或起壳现象。传统墙面抹灰层空鼓或楼地面空鼓修复方法,一般是将空鼓部位的面层砂浆或楼地面面层混凝土凿除,清理基层,处理界面,重新施工面层砂浆或混凝土。对面层进行洒水养护一段时间,待面层干后,重新检查修补部位的空鼓情况,如有空鼓,重复以上步骤再 ...
【技术保护点】
一种空鼓修复方法,其特征在于,包括以下步骤:A、修复准备工作;B、钻孔:钻孔的位置处于空鼓上沿,空鼓上沿对于墙面空鼓是指空鼓面层的上部位置,对于楼地面空鼓是指空鼓的任意位置,钻孔深度不超过抹灰层,每个钻孔处即为一个注浆点,钻孔原则为尽量少钻孔;C、浆料的准备;D、注浆:采用注浆头注浆,注浆头的出浆口控制在抹灰层和基层之间的交界处;对于较大的空鼓,浆料抵达不到时,需要分层分段进行注浆,分层分段进行注浆的步骤为:在浆料抵达不到的位置对应的空鼓处进行钻孔并注浆,直至浆料充满整个空鼓空间;注浆采用低压注浆。
【技术特征摘要】
1.一种空鼓修复方法,其特征在于,包括以下步骤:A、修复准备工作;B、钻孔:钻孔的位置处于空鼓上沿,空鼓上沿对于墙面空鼓是指空鼓面层的上部位置,对于楼地面空鼓是指空鼓的任意位置,钻孔深度不超过抹灰层,每个钻孔处即为一个注浆点,钻孔原则为尽量少钻孔;C、浆料的准备;D、注浆:采用注浆头注浆,注浆头的出浆口控制在抹灰层和基层之间的交界处;对于较大的空鼓,浆料抵达不到时,需要分层分段进行注浆,分层分段进行注浆的步骤为:在浆料抵达不到的位置对应的空鼓处进行钻孔并注浆,直至浆料充满整个空鼓空间;注...
【专利技术属性】
技术研发人员:马长春,周曙光,
申请(专利权)人:深圳市坤巽建筑设计顾问有限公司,
类型:发明
国别省市:广东,44