The utility model discloses a lifting device for assembling prefabricated stair board is characterized in that the device 10 sets of fixed points on the steel pole hanging, hanging above the No. 4.1 and No. 18 steel wire rope shackle 4 5 connection, No. 18 and No. 6.8 above the 5 wire rope connecting shackle; hanging point is connected below the setting in the sling, sling and fixed threaded bolt embedded in the precast concrete stairs in connection. The utility model has the following characteristics: 1, steel pole on 10 sets of fixed point hanging hanging position can be adjusted according to the floor and the precast slab length, flexible use. 2, the device and the wire rope shackle of various models are proved by practice, meet the housing construction of precast hoisting. 3, by fixing the hanging point just pole under the stairs, lifting prefabricated plate can ensure verticality of wire rope, to ensure the direction of the force of prefabricated stairs down, lifting device and stability of the cargoes in hoisting process guarantee.
【技术实现步骤摘要】
一种适用于装配式楼梯板预制构件的吊装装置
本技术涉及一种吊装装置,具体讲是一种适用于装配式楼梯板预制构件的吊装装置。
技术介绍
现在建设部大量提倡预制装配式构件施工,然而,预制构件在施工中通常需要吊装装置来配合施工,因此,目前出现了一些用于吊装预制件的设备。经过检索发现,专利号CN201120547505.1的技术公开了一种大吨位预制梁原位预制吊装装置,龙门吊安装在垫块上,滑轮车与龙门吊上横梁连接,在两滑轮车之间设有钢丝绳,钢丝绳与卷扬机连接,兜梁钢丝绳与滑轮车连接,在兜梁钢丝绳与滑轮车之间还设有卸扣。本技术采用安装在大梁两端的龙门吊进行大梁的安装,并以预制混凝土垫块作为龙门吊的安装基础,卷扬机安装在龙门吊下方,通过动滑轮走动、定滑轮导向形成单边向上垂直起吊力,两台龙门吊共同作用形成2倍起重力以满足原位预制梁的吊装需要。专利号CN201220094468.8的技术公开了一种吊装结构,尤其是公开了一种用于预制箱梁节段吊装的吊装结构,属于建筑生产设备制造
提供一种能有效避免预制箱梁在吊装过程中出现开裂现象的用于预制箱梁节段吊装的吊装结构。专利号CN201020 ...
【技术保护点】
一种适用于装配式楼梯板预制构件的吊装装置,其特征在于:该装置包括钢扁担(1)以及定型吊具(2);钢扁担(1)上设置了10组固定的吊点(3),10组固定的吊点(3)分成两列,吊点(3)上方通过4.1号卸扣(4)与18号钢丝绳(5)连接,18号钢丝绳(5)上方与6.8号卸扣(6)连接;吊点(3)的下方通过18号钢丝绳(7)以及4.1号卸扣(8)连接定型吊具(2),定型吊具(2)与预埋在预制楼梯中的内螺纹螺栓(9)连接。
【技术特征摘要】
1.一种适用于装配式楼梯板预制构件的吊装装置,其特征在于:该装置包括钢扁担(1)以及定型吊具(2);钢扁担(1)上设置了10组固定的吊点(3),10组固定的吊点(3)分成两列,吊点(3)上方通过4.1号卸扣(4...
【专利技术属性】
技术研发人员:刘刚,周志成,廖天彬,徐燕春,
申请(专利权)人:中科科建集团有限公司,
类型:新型
国别省市:四川,51