A device of transformer for overcurrent test, including generator and the power supply transformer, intermediate and intermediate transformer outlet is connected to the compensating capacitor, and capacitor connected transformer, and test equipment, measurement of the transformer comprises a voltage transformer and current PT CT transformer, transformer test test device comprises at least two sets of the same parameters, the high voltage side of the transformer is connected with the first test transformer, the transformer test series, the same voltage side and a testing transformer and a testing transformer connection, one side of the last test a test transformer with transformer connected short circuit.
【技术实现步骤摘要】
一种同时对多台变压器进行过电流试验的装置
本技术属于变压器试验
,具体涉及一种同时对多台变压器进行过电流试验的装置。
技术介绍
随着国家电力事业的大力发展,110kV变压器参数基本已经统一化,许多公司110kV变压器已经开始实施批量化生产。而变压器出厂试验是变压器生产过程中必不可少的环节,如何提高试验效率,缩短变压器生产周期,成为迫切需要解决的问题。根据变压器试验标准和国网技术规范要求,110kV变压器需要进行过电流试验。1.1倍过电流试验需要进行4个小时,要求专人监护操作,耗时耗力。
技术实现思路
针对上述问题,本技术提供一种同时对多台变压器进行过电流试验的装置。为解决上述问题,本技术采用的技术方案为:一种同时对多台变压器进行过电流试验的装置,包括发电机组和由其供电的中间变压器、与中间变压器出线端连接的补偿电容器、与补偿电容器连接的测量互感器,以及试验装置,其特征在于:所述的测量互感器包括电压互感器PT和电流互感器CT,所述的试验装置包括至少两台相同参数的试验变压器,其中第一台试验变压器高压侧与测量互感器连接,且电流互感器串联于补偿电容器与第一台试验变压器之间 ...
【技术保护点】
一种同时对多台变压器进行过电流试验的装置,包括发电机组(1)和由其供电的中间变压器(2)、与中间变压器(2)出线端连接的补偿电容器(3)、与补偿电容器(3)连接的测量互感器,以及试验装置,其特征在于:所述的测量互感器包括电压互感器PT(4)和电流互感器CT(5),所述的试验装置包括至少两台相同参数的试验变压器,其中第一台试验变压器高压侧与测量互感器连接,其他各台试验变压器顺序串联,且下一台试验变压器与其上一台试验变压器的相同电压等级侧连接,最后一台试验变压器不与其上一台试验变压器连接的一侧短接。
【技术特征摘要】
1.一种同时对多台变压器进行过电流试验的装置,包括发电机组(1)和由其供电的中间变压器(2)、与中间变压器(2)出线端连接的补偿电容器(3)、与补偿电容器(3)连接的测量互感器,以及试验装置,其特征在于:所述的测量互感器包括电压互感器PT(4)和电流互感器CT(5),所述的试验装置包括至少两台相同参数的试验变压器,其中第一台试验变压器高压侧与测量互感器连接,其他各台试验变压器顺序串联,且下一台试验变压器与其上一台试验变压器的相同电压等级侧连接,最后一台试验变压器不与其上一台试验变压器连接的一侧短接。2.根...
【专利技术属性】
技术研发人员:韩复兴,赵永亮,葛宝金,刘二浩,欧阳坤,张忠宝,刘永,刘洪波,
申请(专利权)人:山东电力设备有限公司,
类型:新型
国别省市:山东,37
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。