The utility model discloses a prestressed tension bracket, which comprises a bottom plate, a vertical plate is installed at the top of the right column, the medial support column is installed on the top of movable bearing beam, central bearing beam bottom is provided with a connecting piece, the middle part of the outer wall supporting column is installed on the support column on the left side of the controller, equipped with a motor, motor on the left side of a winch frame, winch bracket at the top of the cavity equipped with a rotary shaft, the shaft is arranged in the middle part of the outer surface of the wire coil, wire coil is wound with a sling, location close to the top of the left side of the bottom plate is installed at the top of the receiving station, the station is provided with a telescopic vertical column, the bottom end of the telescopic column is arranged on the right side of the hydraulic control valve, undertake on the left side of the machine is equipped with hydraulic pump. The utility model has the advantages of small size, simple structure, easy to move, can effectively replace the traditional prestressed stretching operation, scaffold by stitching or welding a hanging basket made of, achieve time-saving effect, effectively improves the construction speed.
【技术实现步骤摘要】
一种预应力张拉支架
本技术涉及建筑设备
,具体为一种预应力张拉支架。
技术介绍
在公路、铁路桥梁后张法预应力混凝土施工中,会遇到许多需要预应力筋的状况,其中,预应力筋大多为热处理钢筋、钢丝、钢绞线。而对于安装锚具及张拉设备时,对直线预应力筋,应使张力的作用线与孔道中心线在张拉过程中相互重合,对曲线预应力筋,应使张拉力的作用线与孔道末端中心点的切线相互重合。因此,在现场施工中会遇到各种对预应力设备高度要求和角度要求的情况,就目前的预应力设备中预应力张拉支架多数采用脚手架临时拼装,或采用工字钢焊接成挂篮,使其反作用于翼板上,保持平衡,但该装置不但重,而且在拼装脚手架或焊接挂篮时,费时费力,极大的影响了施工速度。
技术实现思路
本技术的目的在于提供一种预应力张拉支架,具备体积小,结构简单和操作方便的优点,解决了现目前预应力张拉作业时,因预应力张拉支架搭建时费时费力,以及搭建的张拉支架操作不便而造成施工速度的问题。为实现上述目的,本技术提供如下技术方案:一种预应力张拉支架,包括底板,所述底板顶部的右侧竖直安装有支撑柱,所述支撑柱顶端的内侧活动安装有承重梁,所述承重梁的顶部设有凹槽,且承重梁中部的内腔设有穿孔,所述穿孔的内侧安装有导轮一,所述承重梁的左端设有导轮二,所述承重梁底部的中部设有连接件,所述支撑柱中部的外壁安装有控制器,所述支撑柱的左侧安装有电机,所述电机的左侧设有绞盘支架,所述绞盘支架顶部的内腔安装有转轴,所述转轴的中部安装有绞线盘,所述绞线盘的外表面缠绕有吊索,所述吊索远离绞线盘的一端安装有千斤顶,所述底板的顶部靠近左侧的位置处安装有承接台,所述承接台的 ...
【技术保护点】
一种预应力张拉支架,包括底板(1),其特征在于:所述底板(1)顶部的右侧竖直安装有支撑柱(2),所述支撑柱(2)顶端的内侧活动安装有承重梁(3),所述承重梁(3)的顶部设有凹槽(4),且承重梁(3)中部的内腔设有穿孔(5),所述穿孔(5)的内侧安装有导轮一(6),所述承重梁(3)的左端设有导轮二(7),所述承重梁(3)底部的中部设有连接件(8),所述支撑柱(2)中部的外壁安装有控制器(23),所述支撑柱(2)的左侧安装有电机(9),所述电机(9)的左侧设有绞盘支架(10),所述绞盘支架(10)顶部的内腔安装有转轴(11),所述转轴(11)的中部安装有绞线盘(15),所述绞线盘(15)的外表面缠绕有吊索(16),所述吊索(16)远离绞线盘(15)的一端安装有千斤顶(17),所述底板(1)的顶部靠近左侧的位置处安装有承接台(18),所述承接台(18)的顶部竖直安装有伸缩柱(19),所述伸缩柱(19)底端的右侧安装有液压控制阀(20),所述承接台(18)的左侧安装有液压泵(21),所述伸缩柱(19)的顶端与连接件(8)相连接,所述转轴(11)的一端安装有转盘二(13),所述电机(9)靠近转盘 ...
【技术特征摘要】
1.一种预应力张拉支架,包括底板(1),其特征在于:所述底板(1)顶部的右侧竖直安装有支撑柱(2),所述支撑柱(2)顶端的内侧活动安装有承重梁(3),所述承重梁(3)的顶部设有凹槽(4),且承重梁(3)中部的内腔设有穿孔(5),所述穿孔(5)的内侧安装有导轮一(6),所述承重梁(3)的左端设有导轮二(7),所述承重梁(3)底部的中部设有连接件(8),所述支撑柱(2)中部的外壁安装有控制器(23),所述支撑柱(2)的左侧安装有电机(9),所述电机(9)的左侧设有绞盘支架(10),所述绞盘支架(10)顶部的内腔安装有转轴(11),所述转轴(11)的中部安装有绞线盘(15),所述绞线盘(15)的外表面缠绕有吊索(16),所述吊索(16)远离绞线盘(15)的一端安装有千斤顶(17),所述底板(1)的顶部靠近左侧的位置处安装有承接台(18),所述承接台(18)的顶部竖直安装有伸缩柱(19),所述伸缩柱(19)底端的右侧安装有液压控制阀(20),所述承接台(18)的左侧安装有液压泵(21...
【专利技术属性】
技术研发人员:于宪涛,冉海英,柴健,侯庆敏,谭冬浩,李培庆,
申请(专利权)人:于宪涛,
类型:新型
国别省市:山东,37