The utility model belongs to the field of mine construction equipment, in particular to a conveying device for a bottom unloading bucket. The device comprises a rail transportation and is located on both sides of the rail transportation and laid on the concrete mixer and building well track of the loading, transporting track sliding with transporting vehicles, transporting car is provided with a butt rail arranged in parallel with the charging track, and the track of the loading level of docking rail high. The utility model has the advantages of artful design, through the docking track transportation vehicles and transport truck, to load the bottom dump bucket for temporary allocation, for the follow-up of the full bottom dump bucket make forward rail, multiple bottom dump bucket collaborative material transport, save a single bottom dump bucket in the mobile charging time. To improve the efficiency of material transport.
【技术实现步骤摘要】
底卸式吊桶的调运装置
本技术属于矿井建设设备领域,尤其涉及底卸式吊桶的调运装置。
技术介绍
在矿井建设领域,立井混凝土浇筑施工工序最为复杂,涉及混凝土搅拌、运输、悬吊提升和井下模板振捣等技术。现有技术中多采用底卸式吊桶转运混凝土,即将底卸式吊桶运至混凝土搅拌器处装混凝土,然后再转运至建筑井井口处,并吊运至建筑井下进行井壁浇筑施工。由于施工现场环境恶劣,现有技术中多采用于建筑井和混凝土搅拌器之间铺设轨道并配合小车对底卸式吊桶转运,但是存在如下弊端:1)将底卸式吊桶运载至轨道处较为困难,而且一条轨道上只能配设一个底卸式吊桶,施工效率较低;2)底卸式吊桶质量很重,而且在装满混凝土后,需5-8人方能推动,而且在推送过程中,很容易将底卸式吊桶推翻,存在极大的安全隐患。
技术实现思路
本技术的目的是提供一种底卸式吊桶的调运装置,本技术结构简单,设计巧妙,可以同时调运数个底卸式吊桶运料,提高运料和施工效率。为解决上述技术问题,本技术采用的技术方案如下:底卸式吊桶的调运装置,所述装置包括调运轨道以及位于调运轨道两侧且铺设于混凝土搅拌器和建筑井之间的装料轨道,调运轨道上滑动设有调运车,调运 ...
【技术保护点】
底卸式吊桶的调运装置,其特征在于,所述装置包括调运轨道以及位于调运轨道两侧且铺设于混凝土搅拌器和建筑井之间的装料轨道,调运轨道上滑动设有调运车,调运车上设有与装料轨道平行设置的对接轨道,对接轨道与装料轨道水平等高。
【技术特征摘要】
1.底卸式吊桶的调运装置,其特征在于,所述装置包括调运轨道以及位于调运轨道两侧且铺设于混凝土搅拌器和建筑井之间的装料轨道,调运轨道上滑动设有调运车,调运车上设有与装料轨道平行设置的对接轨道,对接轨道与装料轨道水平等高。2.如权利要求1所述的底卸式吊桶的调运装置,其特征在于,所述调运轨道靠近混凝土搅拌器处铺设。3.如权利要求1所述的底卸式吊桶的调运装置,...