The utility model discloses a drip line marking guide rolling operation device, which comprises a liquid storage chamber is arranged on the rolling machines and grinding wheel in front of the drip tube, the liquid storage tank and drop tube through diversion pipe connection, diversion pipe in the cab is provided with a rolling machine by electromagnetic valve switch; the drop tube located near the side of rolling compaction equipment to the work surface, and drop distance and wrong tube distance between center line of rolling machine width. The utility model has the advantages that the utility model is convenient for the driver to master the mutual relations between the rolling machine and the rolling mark, guide the rolling operation, and improve the rolling quality, and can effectively prevent the economic loss caused by the leakage pressure.
【技术实现步骤摘要】
本技术涉及碾压作业
,具体为一种滴液成线标记指引碾压作业装置。
技术介绍
随着碾压机具的发展,碾压作业在土石坝填筑、道路填筑等工程中运用越来越多,但碾压的操作要满足施工参数的要求,又不至于造成浪费,实际比较困难,主要是只能通过驾驶员的经验判断碾压设备的相对位置,进行调整,往往不是重复碾压太多,就是漏压,须再次进行补压,即浪费时间不利于进度,又造成经济上的损失。GPS监控的数字化技术的运用,对碾压遍数的合格率做出要求,采用规范规定的错距法进行碾压,出现漏压后,不易对漏压位置进行定位,补压十分困难,在实际作业中采用搭接法进行碾压,每个条带一次将遍数碾压完成后,再进行下一条带的碾压,一方面在条带间搭接部分存在碾压遍数太多,且极易错台与隆起现象。碾压作业在后退时一般驾驶员需要回头观察并操作,长期的回头对驾驶员的颈部必然造成损伤。如在两河口电站大坝的施工中,坝顶高程2875.00m,河床部位心墙底高程2582.00m,基底设2m厚混凝土基座,最大坝高295.00m,坝顶宽度16.00m。土石方填筑总量约4215.8万m3,大坝规划填筑施工期79个月,平均填筑强度为53.4万m3/月。心墙铺料厚度为30cm,碾压10遍;堆石料铺料厚度为100cm,碾压8遍;过渡料铺料厚度为50cm,碾压8遍,反滤料铺料厚度为30cm,碾压8遍,根据总的方量,按2.0m的有效碾压宽度计算,碾压总的行走约26.27万km,考虑10%的沉降,总行走接近30万km。如果碾压控制不好,一方面造成极大的浪费,同时将影响坝体填筑质量,导致漏压或者超压。
技术实现思路
针对上述问题本技术的目的在于提 ...
【技术保护点】
一种滴液成线标记指引碾压作业装置,其特征在于,包括设置于碾压机具(1)上的储液仓(2)和碾轮前方的滴液管(4),储液仓(2)和滴液管(4)之间通过导流管(3)连接,导流管(3)位于碾压机具(1)驾驶室处设有电磁阀开关(5)。
【技术特征摘要】
1.一种滴液成线标记指引碾压作业装置,其特征在于,包括设置于碾压机具(1)上的储液仓(2)和碾轮前方的滴液管(4),储液仓(2)和滴液管(4)之间通过导流管(3)连接,导流管(3)位于碾压机具(1)驾驶室处设有电磁阀开关(5)。2.根据权利要求1所述的滴液成线标记指引...
【专利技术属性】
技术研发人员:王森荣,田中涛,梁涛,熊亮,姜杰,
申请(专利权)人:中国水利水电第五工程局有限公司,
类型:新型
国别省市:四川;51