Counterweight rail lifting device, balance weight well balance weight on the same axis track installation elevation on both sides of the wall are connected by a first support beam, a support rail beam fixed on the beam line first, track beam is provided with a reinforcement assembly, track beam is installed on the electric gourd. The utility model provides a balance weight hoisting device of a ship lifting machine, which can solve the problem of low hoisting efficiency of the balance heavy rail, and the hoisting operation time of each track can be controlled in 10 to 20 minutes.
【技术实现步骤摘要】
本技术涉及一种吊装装置,尤其是一种升船机平衡重轨道吊装装置。
技术介绍
平衡重轨道为二期埋件,分成T型和工型两种样式,其中T型有272根,工型有288根,合计总工程量2548.078t。平衡重轨道共有32条(16套),T型和工型各16条。其中每条T型轨道由17个单根组成、工型轨道由18个单根组成,安装高程从60.0m至192.6m。除工型轨道上下两节单根长3.9m外,其余轨道单根长均为7.8m,轨道单重约3t至6t不等。受平衡重竖井内爬模0号平台的影响(2750mm宽),采用施工建筑塔机进行轨道吊装时,其吊点中心距离其安装中心约3m,就位难度很大,每根轨道构件吊装时间达数小时,吊装效率很低,大大占用建筑塔机的工作时间。另外,每次吊装完成后才能进行施工排架的上升,单节安装、浇筑循环时间时间长,是整个平衡重轨道安装进度迟缓的主要原因之一。
技术实现思路
本技术所要解决的技术问题是提供一种升船机平衡重轨道吊装装置,可以解决平衡重轨道吊装效率低下的问题,每根轨道吊装作业时间可控制在10~20分钟内完成。为解决上述技术问题,本技术所采用的技术方案是:平衡重井内平衡重轨道安装轴线上同一高程的两侧壁通过第一支撑梁连接,第一支撑梁中线上固定安装有轨道梁,轨道梁上设置有加固组件,轨道梁上安装有电动葫芦。加固组件中,固定安装在轨道梁上的固定钢板组成,固定钢板两侧下端设置有侧板,两侧板之间各通过槽钢连接,第一支撑梁底部设置有多根第二支撑梁。轨道梁底端安装有加固钢板。本技术提供的升船机平衡重轨道吊装装置,实现利用电动葫芦吊装平衡重轨道,可以解决平衡重轨道吊装效率低下的问题,施工塔机 ...
【技术保护点】
一种升船机平衡重轨道吊装装置,其特征在于:平衡重井(1)内平衡重轨道安装轴线上同一高程的两侧壁通过第一支撑梁(2)连接,第一支撑梁(2)中线上固定安装有轨道梁(3),轨道梁(3)上设置有加固组件(4),轨道梁(3)上安装有电动葫芦(5)。
【技术特征摘要】
1. 一种升船机平衡重轨道吊装装置,其特征在于:平衡重井(1)内平衡重轨道安装轴线上同一高程的两侧壁通过第一支撑梁(2)连接,第一支撑梁(2)中线上固定安装有轨道梁(3),轨道梁(3)上设置有加固组件(4),轨道梁(3)上安装有电动葫芦(5)。2.根据权利要求1所述的升船机平衡重轨道吊装装置,其特征在于:加固组件(4)中,固定安装在轨...
【专利技术属性】
技术研发人员:卫书满,陈强,
申请(专利权)人:中国葛洲坝集团机电建设有限公司,
类型:新型
国别省市:四川;51