The present invention provides concurrent processing method of a hook process and cross access network switch, which comprises the following steps: the first step, RNC or BSC downlink analysis of UE and CN between the message; the second step, UE and whether CN on hook; the third step, if UE and CN started to hang up, and report to UE the measurement report or because the system load is too high to trigger switching or relocation, RNC or BSC do not open the relocation or switching process, but to wait for the release of UE; if it is in the process of re positioning of the UE and CN started to hang up, then RNC or BSC to terminate the relocation process, and release corresponding resources, waiting for the UE release complete. The invention reduces the treatment of abnormal process between the network elements; reduce the target network element of wireless resource is not the necessary preparations; enhance the network indicators (such as the handover success rate, success rate, IU port resources to prepare IUR-G port resource preparation success rate, Diaohua rate).
【技术实现步骤摘要】
【技术保护点】
1.一种挂机过程与跨接入网切换的并发处理方法,包括以下步骤:第一步、RNC或者BSC解析UE与CN间的上下行直传消息;第二步、判断UE和CN是否进行挂机;第三步、如果UE和CN开始挂机后,UE又上报测量报告或者由于系统负荷过高需要触发切换或者重定位,RNC或BSC不开启重定位或切换流程,而是等待UE释放完成;如果是在重定位的过程中UE和CN开始挂机,则RNC或BSC终止重定位流程,并释放相应的资源,等待UE释放完成。
【技术特征摘要】
【专利技术属性】
技术研发人员:赵辉,
申请(专利权)人:西安新邮通信设备有限公司,
类型:发明
国别省市:87
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。