The dried sludge enters the system structure of coal pulverizing system coupling power generation in the whole process of airtight way, which is used to convey the dried sludge in the dry material bin to the coal chute connected with the pulverizer, which mainly includes the pneumatic conveying main pipe, wherein the pneumatic conveying main pipe has an input port and at least one output port, the input port is connected with the outlet of the dry material bin, and the output ports are respectively connected to each coal chute; The pneumatic conveying main pipe is connected with the first pressure gas source to convey the dried sludge conveyed by the dry material bin to the coal chute; thus, the whole process of sludge conveying is closed, the odor pollutants of sludge are effectively prevented from leaking, civilized production is realized, the life health of operators is ensured, the equipment construction and maintenance costs of the original conveying system are saved, and higher economic value is created.
【技术实现步骤摘要】
干化污泥全程密闭方式进入制粉系统耦合发电的系统结构
本技术涉及污水处理领域,特别是指干化污泥全程密闭方式进入制粉系统耦合发电的系统结构。
技术介绍
污泥是指污水处理过程所产生的沉淀物质,它是一种由有机残片、细菌体、无机颗粒和胶体等组成的非均质体,很难通过沉降进行彻底的固液分离。污水处理产生的污泥是典型的有机污泥,其特性是含水率一般在80%以上,有机物含量高,呈胶体结构,是一种亲水性污泥,容易管道输送,但脱水性能差。污泥如同垃圾一样,伴随着人类社会的发展,其产出量日益增长。传统的污泥处理方法如海洋投弃、土地填埋、堆肥化等会带来污染水源和土壤、占用土地等问题,与可持续发展理念背离。国家层面出台多项政策文件,鼓励、支持污泥与燃煤机组耦合发电,以实现污泥减量化、无害化、资源化和规模化处置,推动经济社会绿色发展。污水处理厂产生的污泥含水量高达80%以上,未经干化的污泥一般不能直接进入电站锅炉焚烧。一是出于对燃煤锅炉安全、稳定和经济运行的考虑,二是为了消除对制粉系统的影响。工程实践上,一般先将污水处理厂来的污泥干化处理,将含水率 ...
【技术保护点】
1.干化污泥全程密闭方式进入制粉系统耦合发电的系统结构,用于输送干料仓(6)内的干化污泥至磨煤机(5),所述磨煤机(5)连接有落煤管(3),其特征在于:/n包括气力输送主管(8),其具有输入端口和至少一输出端口,所述输入端口与干料仓(6)出口连接,所述输出端口分别连接至各落煤管(3);/n所述气力输送主管(8)连接第一有压气源(100),将干料仓(6)输送的干化污泥输送至落煤管(3)。/n
【技术特征摘要】
1.干化污泥全程密闭方式进入制粉系统耦合发电的系统结构,用于输送干料仓(6)内的干化污泥至磨煤机(5),所述磨煤机(5)连接有落煤管(3),其特征在于:
包括气力输送主管(8),其具有输入端口和至少一输出端口,所述输入端口与干料仓(6)出口连接,所述输出端口分别连接至各落煤管(3);
所述气力输送主管(8)连接第一有压气源(100),将干料仓(6)输送的干化污泥输送至落煤管(3)。
2.如权利要求1所述的干化污泥全程密闭方式进入制粉系统耦合发电的系统结构,其特征在于:
所述气力输送主管(8)于各磨煤机(5)下方延伸设置,其向上延伸设置至少一条气力输送支管(9),所述气力输送支管(9)靠近连接气力输送主管(8)处设有气动插板门A(10),其另一端与落煤管(3)连接,在靠近连接口处设有气动插板门B(11)。
3.如权利要求2所述的干化污泥全程密闭方式进入制粉系统耦合发电的系统结构,其特征在于:
所述气力输送主管(8)最末端设置的气力输送支管(9)上连接有气力输送再循环管道(15),气力输送再循环管道(15)另一端连接至干料仓(6)。
4.如权利要求2或3所述的干化污泥全程密闭方式进入制粉系统耦合发电的系统结构,其特征在于:
进一步包含压缩空气吹扫主管(12),所述压缩空气吹扫主管(12)输入端连接第二有压气源(20...
【专利技术属性】
技术研发人员:张广文,张小虎,
申请(专利权)人:中国电力工程顾问集团华北电力设计院有限公司,
类型:新型
国别省市:北京;11
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。