The utility model relates to a support system and a construction method for a tunnel with completely weathered surrounding rock in a water rich sand stratum. At least four steps are arranged in the tunnel; a steel bent support is arranged between the steps and the top of the tunnel; an advance small conduit and a advance pipe shed are arranged at the top of the tunnel; a steel arch is arranged in the tunnel; a group of steel arches are arranged in longitudinal intervals; the shape of the steel arch is suitable for the cross section shape of the tunnel; Pipe shed lock feet are set on the steel arch frame and on both sides of each step; steel mesh is hung on the inner side of the tunnel between the adjacent steel arch frames; concrete layer is sprayed on the outer side of the steel arch frame and the steel mesh; strip foundation is set on the horizontal plane of the step and the position corresponding to the steel bent support; diagonal bracing is set between the steel bent support and the steel arch frame. The invention solves the technical problems that the traditional construction method is easy to cause the settlement of the overall primary support structure, the construction space is small, the steel frame arch foot pipe shed lock foot can not be strengthened, the risk is large when the middle diaphragm is removed, the process is complex and the construction speed is slow.
【技术实现步骤摘要】
一种富水流砂地层全风化围岩隧道的支护体系及施工方法
本专利技术属于地下工程施工
,特别是一种富水流砂地层全风化围岩隧道的支护体系及施工方法。
技术介绍
Ⅵ级富水砂夹石围岩,围岩很差,采用常规CRD工法施工,会造成整体初支结构整体沉降;且CRD施工分为四个小导洞进行施工,施工空间小,无法进行钢架拱脚管棚锁脚加强,拆除中隔壁时风险较大,工序繁杂,施工速度较慢等问题。
技术实现思路
本专利技术的目的是提供一种富水流砂地层全风化围岩隧道的支护体系及施工方法,要解决传统的施工方法容易造成整体初支结构沉降,施工空间小、无法进行钢架拱脚管棚锁脚加强,拆除中隔壁时风险较大,工序繁杂以及施工速度慢的技术问题。为实现上述目的,本专利技术采用如下技术方案。一种富水流砂地层全风化围岩隧道的支护体系,设置在开挖中的隧道内;所述隧道的内部,沿纵向至少设有四层台阶;每层台阶与隧道的顶部之间设置有钢排架支撑;所述隧道顶部的土体中设置有超前小导管和超前管棚;所述超前小导管有若干排,沿纵向间隔布置;每排超前小导管沿环向 ...
【技术保护点】
1.一种富水流砂地层全风化围岩隧道的支护体系,设置在开挖中的隧道(1)内;其特征在于:所述隧道(1)的内部,沿纵向至少设有四层台阶(2);每层台阶(2)与隧道(1)的顶部之间设置有钢排架支撑(3);所述隧道(1)顶部的土体中设置有超前小导管(4)和超前管棚(5);所述超前小导管(4)有若干排,沿纵向间隔布置;每排超前小导管(4)沿环向间隔设置;所述超前管棚(5)有若干排,沿纵向间隔布置;每排超前管棚(5)沿环向间隔设置;所述隧道(1)的内部设有钢拱架(6);所述钢拱架(6)有一组,沿纵向间隔布置;每个钢拱架(6)的形状与隧道(1)的截面形状相适应,且支撑在隧道(1)的内侧; ...
【技术特征摘要】
1.一种富水流砂地层全风化围岩隧道的支护体系,设置在开挖中的隧道(1)内;其特征在于:所述隧道(1)的内部,沿纵向至少设有四层台阶(2);每层台阶(2)与隧道(1)的顶部之间设置有钢排架支撑(3);所述隧道(1)顶部的土体中设置有超前小导管(4)和超前管棚(5);所述超前小导管(4)有若干排,沿纵向间隔布置;每排超前小导管(4)沿环向间隔设置;所述超前管棚(5)有若干排,沿纵向间隔布置;每排超前管棚(5)沿环向间隔设置;所述隧道(1)的内部设有钢拱架(6);所述钢拱架(6)有一组,沿纵向间隔布置;每个钢拱架(6)的形状与隧道(1)的截面形状相适应,且支撑在隧道(1)的内侧;所述钢拱架(6)上、位于每层台阶(2)的两侧分别设有管棚锁脚(7);在相邻钢拱架(6)之间的隧道(1)内侧面上铺挂有钢筋网片(8);所述钢拱架(6)和钢筋网片(8)的外侧满喷有混凝土层;所述台阶(2)的水平面上、对应钢排架支撑(3)的位置处设置有条形基础(9);所述钢排架支撑(3)的顶部支撑在隧道(1)顶部的侧壁上,钢排架支撑(3)的底部支设在条形基础(9)上;在钢排架支撑(3)与其前后侧的钢拱架(6)之间设置有斜撑(10)。
2.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:所述台阶(2)的纵向长度为5~7m,台阶(2)的高度为3.0m~3.1m;所述台阶(2)的踢面为斜面,斜面的倾角为2%~5%。
3.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:所述超前小导管(4)的环向间距为不大于0.4m;相邻两排超前小导管(4)之间的间距为不大于3m;所述超前小导管(4)的长度为4m~5m。
4.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:所述超前管棚(5)设置在隧道(1)的拱顶部位、对应140°的圆心角范围内;每根超前管棚(5)的长度不小于10m,超前管棚(5)向外倾斜插设,且与隧道(1)的纵轴之间的夹角不大于12°;纵向相邻的超前管棚(5)搭接长度不小于3m,环向相邻的超前管棚(5)的间距不大于0.4m。
5.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:纵向相邻的钢拱架(6)之间的间距为不大于0.5m,并且在相邻的钢拱架(6)之间连接有纵向连接杆(11)。
6.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:所述钢拱架(6)的两端底部设置有水平的连接板(12);所述钢拱架(6)通过连接板(12)与地面连接。
7.根据权利要求1所示的富水流砂地层全风化围岩隧道的支护体系,其特征在于:所述钢排架支撑(3)中纵向相邻的立柱(3.1)之间的间距为不大于1.2m。
8.一种权利要求1-7中任意一项所述的富水流砂地层全风化围岩隧道的支护体系的施工方法,其特征在于,包括步骤如下:
步骤一,施工准...
【专利技术属性】
技术研发人员:张硕,王志成,宋合财,李路路,武凌春,陈德霞,
申请(专利权)人:中国建筑土木建设有限公司,
类型:发明
国别省市:北京;11