A pre-excavation single roadway forward block filling mining method, which uses mining instead of excavation to form auxiliary transport along the roadway, pre-excavation roadway as return air along the roadway as filling slurry and coal transportation layout; comprehensive mechanized block filling mining technology is used in mining and goaf filling; coal mining in order of advancing mining and filling in the direction of filling coal face towards the boundary of the mining area. Method. Pre-excavated return air chute is formed before mining, and auxiliary haulage chute is formed by cutting end coal by shearer with the advance of mining face. This mining method is simple in technology, feasible, technically achievable full-mining area without pillars and high recovery rate. It not only solves the technical problem of continuous tension in retrogressive mining, but also realizes rapid production through advancing layout along with filling face while making safe and rapid mechanized mining of \three below\ difficult coal seams become reality.
【技术实现步骤摘要】
一种预掘单巷前进式砌块充填采煤方法
本专利技术属于综合机械化无煤柱开采“三下”难采煤层群采煤
,具体是一种预掘单巷前进式砌块充填采煤方法。
技术介绍
我国“三下”难采煤层资源分布广泛,储量大,传统采取留设边界煤柱的开采方法为煤炭资源战略开采埋下了隐患:(1)浪费大量的优质资源,(2)具有自燃倾向煤层中留设的煤柱长期稳定性难保证,(3)干扰矿井采区、工作面布置;矸石、膏体、超高水等其他固体充填方法存在的共性问题是投入高、见效慢且地表沉降效果无法保证;如何实现最经济地解放压置资源且保证控制地表控制效果是目前亟需攻关的技术难点。
技术实现思路
本专利技术的目的是针对村庄下压煤回采导致地表建筑物变形受损的问题,提供一种预掘单巷前进式砌块充填采煤方法。本专利技术采取以下技术方案:一种预掘单巷前进式砌块充填采煤方法,包括以下步骤,A)在采区下部边界开掘采区运输巷及采区辅运巷分别与运输大巷及辅运大巷相连;在采区上部边界开掘采区回风巷与回风大巷相连。B)从采区运输巷及采区辅运巷开切口,由切口处开掘巷道至采区上部边界的采区回风巷,形成预掘区段回风顺槽。C)从采区辅运巷另一侧开切口,并预留集中巷保护煤柱,由切口处开掘巷道至集中巷保护煤柱边界处,形成随掘区段辅运顺槽。D)自集中巷保护煤柱边界处开切眼,形成采煤工作面,并在切眼中布置充填采煤设备;在切眼后方的留巷区段运输顺槽中布置顺槽运煤设备;在切眼后方的留巷区段辅运顺槽中布置干线充填管和设备列车组成充填设备。E)从切眼处前进式推进采煤工作面至采区回风巷保护煤柱,工作面随采随充,巷道以采代掘,实施一个步距的采煤与充填作业。F)随 ...
【技术保护点】
1.一种预掘单巷前进式砌块充填采煤方法,其特征在于:包括以下步骤,A)在采区下部边界开掘采区运输巷(1)及采区辅运巷(2)分别与运输大巷及辅运大巷相连;在采区上部边界开掘采区回风巷(3)与回风大巷相连;B)从采区运输巷(1)及采区辅运巷(2)开切口,由切口处开掘巷道至采区上部边界的采区回风巷(3),形成预掘区段回风顺槽(4);C)从采区辅运巷(2)另一侧开切口,并预留集中巷保护煤柱(5),由切口处开掘巷道至集中巷保护煤柱边界(6)处,形成随掘区段辅运顺槽(7);D)自集中巷保护煤柱边界处开切眼(8),形成采煤工作面,并在切眼(8)中布置充填采煤设备;在切眼(8)后方的留巷区段运输顺槽(13)中布置顺槽运煤设备;在切眼(8)后方的留巷区段辅运顺槽(17)中布置干线充填管(18)和设备列车(19)组成充填设备;E)从切眼(8)处前进式推进采煤工作面至采区回风巷保护煤柱,工作面随采随充,巷道以采代掘,实施一个步距的采煤与充填作业;F)随着工作面持续向前推进,在后方采空区进行砌块充填作业,同时替代两旁顺槽的巷旁支护作业;G)工作面持续向前推进的同时,随掘区段辅运顺槽(7)通过采煤机割煤代替巷道 ...
【技术特征摘要】
1.一种预掘单巷前进式砌块充填采煤方法,其特征在于:包括以下步骤,A)在采区下部边界开掘采区运输巷(1)及采区辅运巷(2)分别与运输大巷及辅运大巷相连;在采区上部边界开掘采区回风巷(3)与回风大巷相连;B)从采区运输巷(1)及采区辅运巷(2)开切口,由切口处开掘巷道至采区上部边界的采区回风巷(3),形成预掘区段回风顺槽(4);C)从采区辅运巷(2)另一侧开切口,并预留集中巷保护煤柱(5),由切口处开掘巷道至集中巷保护煤柱边界(6)处,形成随掘区段辅运顺槽(7);D)自集中巷保护煤柱边界处开切眼(8),形成采煤工作面,并在切眼(8)中布置充填采煤设备;在切眼(8)后方的留巷区段运输顺槽(13)中布置顺槽运煤设备;在切眼(8)后方的留巷区段辅运顺槽(17)中布置干线充填管(18)和设备列车(19)组成充填...
【专利技术属性】
技术研发人员:宋选民,朱德福,加麦生,刘一扬,霍昱名,王仲伦,
申请(专利权)人:太原理工大学,
类型:发明
国别省市:山西,14