The invention discloses a multi-stage water retaining and draining system for high dam projects, which includes water retaining units and draining units arranged in turn along the flow direction of the water flow in the tunnel. The water retaining units are arranged by n-stage water retaining gate devices according to appropriate spacing. The draining units include accident gate devices and draining gate devices. The n-stage water retaining gate devices of the water retaining units are arranged side by side in the tunnel. In the overhaul and working sluice wells, the horizontal pressure pipes are arranged side by side at all levels of the sluice wells and are connected with all the overhaul and working sluice wells respectively. The horizontal pressure pipes are lower than the water level in the last sluice well relative to the bottom of the tunnel. By adopting the technical scheme of the present invention, the water level in the sluice well is reduced step by step, and the relative water pressure of each water retaining gate device is kept stable, so that the resultant force of the sluice gate is within the maximum range that the metal structure can bear, and the ability of emptying to any depth is realized. At the same time, the safe operation of the emptying system is guaranteed by installing a supplementary gas pipe and an overflow corridor, etc.
【技术实现步骤摘要】
一种用于高坝工程的多级挡水放空系统
本专利技术具体涉及水利水电工程
,尤其涉及一种用于高坝工程的多级挡水放空系统。
技术介绍
高坝工程为我国经济社会发展带来巨大能源效益,工程放空技术是其稳定、安全运行的重要保障。但是目前多数300m级高坝工程通过溢洪道、泄洪洞、放空洞只能放空到105m左右水深,剩余库容水量巨大,水压很大,受材料强度及金属结构制造工艺影响,难以实现更深层放空。因此,需要专利技术一种适应更深层放空的技术来满足当今高坝工程的放空运行需求。为满足300m级的高坝工程运行要求,公开号为CN105220659B的中国专利公开了一种高坝大库超深层挡水放空系统及其操作方法。通过设置多级闸门分担总水头,并在各级闸门后充水抵消挡水水头,使各级闸门承受的水推力在常规设计范围内,克服了金属结构专业现有技术难题,但是该结构仍存在以下不足:通气管设置在闸门井外侧,增加了施工难度;平压管、补气管、充水管设置复杂,且部分缺乏备用设施,可能导致系统平压失效;各级闸门系统按照水头平均分担,首级闸门仅分担一部分水头,增加了闸门井的数量及施工周期。
技术实现思路
为解决上述技术问题,本专利技术提供了一种用于高坝工程的多级挡水放空系统。本专利技术是通过如下技术方案予以实现的。本专利技术提供了一种用于高坝工程的多级挡水放空系统,包括挡水单元、放水单元、平压单元和隧洞,所述隧洞与水源连通,沿着所述隧洞以内水流方向,所述挡水单元、放水单元按照适当的间距并列布置于所述隧洞之上,所述挡水单元包括沿着所述隧洞以内水流方向按照适当间距并列布置的n级挡水闸门装置,所述放水单元包括沿着所述隧洞以 ...
【技术保护点】
1.一种用于高坝工程的多级挡水放空系统,其特征在于:包括挡水单元(1)、放水单元(2)、平压单元(3)和隧洞(10),所述隧洞(10)与水源连通,沿着所述隧洞(10)以内水流方向,所述挡水单元(1)、放水单元(2)按照适当的间距并列布置于所述隧洞(10)之上,所述挡水单元(1)包括沿着所述隧洞(10)以内水流方向按照适当间距并列布置的n级挡水闸门装置(4),所述放水单元(2)包括沿着所述隧洞(10)以内水流方向按照适当间距并列布置于所述隧洞(10)之上的事故闸门装置(5)和排空闸门装置(6),其中,位于第一级挡水闸门装置(4)的上游隧洞(10)为有压段A(1001),位于第一级挡水闸门装置(4)与最后一级挡水闸门装置(4)之间的隧洞(10)为有压段B(1002),位于最后一级挡水闸门装置(4)与事故闸门装置(5)之间的隧洞(10)为有压段C(1003),位于所述排空闸门装置(6)之后的隧洞(10)为无压段(1004),所述挡水闸门装置(4)包括沿着所述隧洞(10)以内水流方向依次并列布置的检修闸井(401)和工作闸井(402),所述事故闸门装置(5)包括事故闸井(501),所述检修闸井 ...
【技术特征摘要】
1.一种用于高坝工程的多级挡水放空系统,其特征在于:包括挡水单元(1)、放水单元(2)、平压单元(3)和隧洞(10),所述隧洞(10)与水源连通,沿着所述隧洞(10)以内水流方向,所述挡水单元(1)、放水单元(2)按照适当的间距并列布置于所述隧洞(10)之上,所述挡水单元(1)包括沿着所述隧洞(10)以内水流方向按照适当间距并列布置的n级挡水闸门装置(4),所述放水单元(2)包括沿着所述隧洞(10)以内水流方向按照适当间距并列布置于所述隧洞(10)之上的事故闸门装置(5)和排空闸门装置(6),其中,位于第一级挡水闸门装置(4)的上游隧洞(10)为有压段A(1001),位于第一级挡水闸门装置(4)与最后一级挡水闸门装置(4)之间的隧洞(10)为有压段B(1002),位于最后一级挡水闸门装置(4)与事故闸门装置(5)之间的隧洞(10)为有压段C(1003),位于所述排空闸门装置(6)之后的隧洞(10)为无压段(1004),所述挡水闸门装置(4)包括沿着所述隧洞(10)以内水流方向依次并列布置的检修闸井(401)和工作闸井(402),所述事故闸门装置(5)包括事故闸井(501),所述检修闸井(401)、工作闸井(402)和事故闸井(501)以内分别设置有可阻断或导通所述隧洞(10)的检修闸门(8)、工作闸门(7)和事故闸门(14),所述平压单元(3)包括至少两条并列布置的平压主管(19),每条平压主管(19)之上连接有第一支管(20)和第二支管(21),所述第一支管(20)和第二支管(21)上均安装有至少两个球阀(22)和一个活塞阀(23),其中所述第一支管(20)与所述检修闸井(401)连接,所述第二支管(21)与所述工作闸井(402)连接。2.根据权利要求1所述的一种用于高坝工程的多级挡水放空系统,其特征在于:沿着隧洞(10)以内水流流向,自第2级挡水闸门装置(4)起至最后1级挡水闸门装置止,任意相邻两级挡水闸门装置(4)之间还设置有溢流廊道A(9),溢流廊道A(9)的一端与检修闸井(401)连通,溢流廊道A(9)的另一端与工作闸井(402)连通。3.根据权利要求2所述的一种用于高坝工程的多级挡水放空系统,其特征在于:沿着所述隧洞(10)以内水流方向,所述溢流廊道A(9)进口设置高度逐渐递减,并与其前一级挡水闸门装置(4)控制水位高程相匹配。4.根据权利要求2所述的一种用于高坝工程的多级挡水放空系统,其特征在于:所述溢流廊道A(9)的横断面外轮廓形状为城门洞型、圆形、马蹄形中的一种。5.根据权利要求1所述的一种用于高坝工程的多级挡水放空系统,其特征在于:所述最后一级挡水闸门装置(4)的工作闸井(402)还依次通过溢流廊道B(11)、溢流竖井A(12)、平压竖井(16)与所述有压段C(1003)连通,溢流廊道B(11)设置高度与所述最后一级挡水闸门装置(4)控制水位高程相匹配,所述平压主管(19)末端还与平压竖井(16)连通。6.根据权利要求5所述的一种用于高坝工程...
【专利技术属性】
技术研发人员:杨家修,杜帅群,湛正刚,李晓彬,郑雪玉,鲍伟,
申请(专利权)人:中国电建集团贵阳勘测设计研究院有限公司,
类型:发明
国别省市:贵州,52