The invention discloses a driving device and a driving method for a steel pile with a ground electrode of a transmission tower, which solves the problem of large labor intensity existing in the construction of a pile with a ground electrode of a transmission tower. A threaded through hole (2) and a threading bolt (3) are arranged on the crossbeam of the half-shaped hoop base (1), and pins are arranged on the top of the left and right longitudinal beams of the half-shaped hoop base (1), and a swing block is articulated on the pin shaft, and a wedge block is arranged on the inner surface of the left and right swing blocks to insert a groove, and the swing block is arranged outside the swing block. A pile hammer percussion block (16) is fixed and welded on the side, and a pile hammer bucket (18) is fixed and connected on the top surface of the left pile hammer percussion block (16), and a buckle tongue is arranged on the top of the left and pendulum blocks; and an electric control pile hammer (30) is arranged in the left pile hammer bucket (18) and the right pile hammer bucket (19). The piling process of the invention has the advantages of electric control, fast speed and high efficiency, and greatly reduces the labor intensity of construction personnel.
【技术实现步骤摘要】
输电铁塔接地极钢桩打入装置及打入方法
本专利技术涉及一种电力输送铁塔的接地极钢桩的打入设备,特别涉及一种操作简单,携带方便,以电池为动力的输电铁塔接地极钢桩的打桩装置及打桩的方法。
技术介绍
在输电线路铁塔的施工中,需要进行输电铁塔接地极的打入施工,接地极一般为近2.5-3米长的角钢或钢管,布设于铁塔塔基的四角地面下,并与铁塔连接,用于铁塔接地。在现场施工中,接地极是通过人工捶打或使用小型挖掘机等机械设备将其压入地中的;但由于大部分铁塔布设于山区的山梁上,地形复杂,没有道路,施工机械无法进入施工现场,只能通过人工携带重锤,翻山越岭进入到施工现场,通过人工捶打的方式,进行铁塔接地极的打桩施工,存在劳动强度大,工具携带不方便和打桩施工效率低的问题。
技术实现思路
本专利技术提供了一种输电铁塔接地极钢桩打入装置及打入方法,解决了输电铁塔接地极施工打桩时存在的劳动强度大,工具携带不方便和打桩施工效率低的技术问题。本专利技术是通过以下技术方案解决以上技术问题的:一种输电铁塔接地极钢桩打入装置,包括半口字形抱箍基座,在半口字形抱箍基座的横梁上设置有螺纹通孔,在螺纹通孔中螺接有顶丝螺栓,在半口字形抱箍基座的左纵梁顶端设置有左销轴,在左销轴上铰接有左摆块,在左摆块的内侧面上设置有左楔形块插入凹槽,在左摆块的外侧面上固定焊接有左桩锤打击块,在左桩锤打击块的顶面上固定连接有左桩锤桶,在左摆块的顶端设置有左扣接锁舌;在半口字形抱箍基座的右纵梁顶端设置有右销轴,在右销轴上铰接有右摆块,在右摆块的内侧面上设置有右楔形块插入凹槽,在右摆块的外侧面上固定焊接有右桩锤打击块,在右桩锤打击块的 ...
【技术保护点】
1.一种输电铁塔接地极钢桩打入装置,包括半口字形抱箍基座(1),在半口字形抱箍基座(1)的横梁上设置有螺纹通孔(2),在螺纹通孔(2)中螺接有顶丝螺栓(3),其特征在于,在半口字形抱箍基座(1)的左纵梁顶端设置有左销轴(7),在左销轴(7)上铰接有左摆块(9),在左摆块(9)的内侧面上设置有左楔形块插入凹槽(12),在左摆块(9)的外侧面上固定焊接有左桩锤打击块(16),在左桩锤打击块(16)的顶面上固定连接有左桩锤桶(18),在左摆块(9)的顶端设置有左扣接锁舌(10);在半口字形抱箍基座(1)的右纵梁顶端设置有右销轴(8),在右销轴(8)上铰接有右摆块(6),在右摆块(6)的内侧面上设置有右楔形块插入凹槽(14),在右摆块(6)的外侧面上固定焊接有右桩锤打击块(17),在右桩锤打击块(17)的顶面上固定连接有右桩锤桶(19),在右摆块(6)的顶端设置有右扣接锁舌(11);半口字形抱箍基座(1)上的左摆块(9)与右摆块(6)闭合后组成一个封闭的抱箍,在封闭的抱箍中设置有角钢接地极(21),在左楔形块插入凹槽(12)中插入有左楔形块(13),在右楔形块插入凹槽(14)中插入有右楔形块( ...
【技术特征摘要】
1.一种输电铁塔接地极钢桩打入装置,包括半口字形抱箍基座(1),在半口字形抱箍基座(1)的横梁上设置有螺纹通孔(2),在螺纹通孔(2)中螺接有顶丝螺栓(3),其特征在于,在半口字形抱箍基座(1)的左纵梁顶端设置有左销轴(7),在左销轴(7)上铰接有左摆块(9),在左摆块(9)的内侧面上设置有左楔形块插入凹槽(12),在左摆块(9)的外侧面上固定焊接有左桩锤打击块(16),在左桩锤打击块(16)的顶面上固定连接有左桩锤桶(18),在左摆块(9)的顶端设置有左扣接锁舌(10);在半口字形抱箍基座(1)的右纵梁顶端设置有右销轴(8),在右销轴(8)上铰接有右摆块(6),在右摆块(6)的内侧面上设置有右楔形块插入凹槽(14),在右摆块(6)的外侧面上固定焊接有右桩锤打击块(17),在右桩锤打击块(17)的顶面上固定连接有右桩锤桶(19),在右摆块(6)的顶端设置有右扣接锁舌(11);半口字形抱箍基座(1)上的左摆块(9)与右摆块(6)闭合后组成一个封闭的抱箍,在封闭的抱箍中设置有角钢接地极(21),在左楔形块插入凹槽(12)中插入有左楔形块(13),在右楔形块插入凹槽(14)中插入有右楔形块(15),在顶丝螺栓(3)的内侧端与角钢接地极(21)之间设置有等腰梯形顶块(5),等腰梯形顶块(5)的两腰与角钢接地极(21)的角钢内侧面顶接在一起,左楔形块(13)与角钢接地极(21)的角钢的左侧外侧面顶接在一起,右楔形块(15)与角钢接地极(21)的角钢的右侧外侧面顶接在一起;左桩锤桶(18)的结构与右桩锤桶(19)的结构完全相同,在左桩锤桶(18)和右桩锤桶(19)中均设置有电控桩锤(30)。2.根据权利要求1所述的一种输电铁塔接地极钢桩打入装置,其特征在于,在左桩锤桶(18)的顶端面上设置有上端铁芯(22),在左桩锤桶(18)的底端面上设置有下端铁芯(26),在上端铁芯(22)与下端铁芯(26)之间活动设置有...
【专利技术属性】
技术研发人员:冯永刚,李志明,李方,毕士斌,粟玉生,张民宝,
申请(专利权)人:中国能源建设集团山西电力建设有限公司,
类型:发明
国别省市:山西,14