The invention relates to the technical field of cofferdam, and discloses a construction method for the structure of the cofferdam for the construction of the water head structure in the river. The widening cofferdam is arranged on the inside of the end cofferdam and the front end of the cofferdam in the outer cofferdam, and the composite cofferdam is laid between the cofferdam and the end cofferdam and the upper cofferdam, and the cofferdam is widened between the cofferdam and the lower cofferdam. The inner cofferdam is built, the construction area of the head structure is located between the lower cofferdam and the inner cofferdam, and a number of piles are set in the body of the front end of the cofferdam, the front of the cofferdam and the end cofferdam in the end of the cofferdam, and the water stop curtain is formed between the adjacent piles. The widening cofferdam, composite geomembrane and pile in the invention greatly reduce the leakage of the structure part of the outer cofferdam, and strengthen the structure strength of the outer cofferdam, at the same time, the internal cofferdam makes the construction work in the construction area of the water head structure more safe and reliable, and can effectively carry out the construction work on the head structure.
【技术实现步骤摘要】
用于河流中取水头结构施工的围堰结构及其施工方法
本专利技术涉及围堰
,特别涉及一种用于河流中取水头结构施工的围堰结构的施工方法。
技术介绍
在本申请人的取水头结构施工项目中,根据设计要求,取水头结构需在离泵房400m处进行围堰施工,形成一圈外围堰,取水头处围堰顶部距河床有6m,河床较取水头结构底部高差为6m,围堰后存在约为9米的高差,随着围堰延伸进度,河道逐渐变窄,势必导致水流湍急,水深增加,对围堰前端的结构部分不利影响较大,出现了围堰渗漏量大的情况,10台水泵同时运转不能有效的降低围堰内因渗漏形成的水位,抽水效果不明显,且围堰渗确切漏点的位置也无法确定,工期又十分紧张,同时,开挖取水头结构的基坑时,围堰会出现管涌、流沙情况,严重影响了施工安全,管涌使得基坑施工区域内积水,无法有效对取水头结构区域进行施工,另外,湍急的水流以及围堰结构出现的管涌、流沙等情况会影响整个围堰堰体结构的稳定性,围堰堰体的结构稳定是保证围堰内施工作业安全可靠的基础条件。因此,本申请提出一种用于河流中取水头结构施工的围堰结构及其施工方法。
技术实现思路
本专利技术所要解决的技术问题是:针对 ...
【技术保护点】
1.用于河流中取水头结构施工的围堰结构,其特征在于:包括外围堰,所述外围堰包括上围堰(1)、端围堰(2)和下围堰(3)依次连接而成,所述端围堰(2)的内侧和所述上围堰(1)的前端内侧均设置有加宽围堰(4),所述加宽围堰(4)与所述端围堰(2)和上围堰(1)之间铺设有复合土工膜(5),所述加宽围堰(4)与所述下围堰(3)之间的区域修筑有内围堰(6),所述取水头结构(7)的施工区域位于所述下围堰(3)与所述内围堰(6)之间的区域,所述内围堰(6)围挡住所述取水头结构(7)的前端和上游端,所述内围堰(6)的一端与所述下围堰(3)修筑连接在一起;所述上围堰(1)前端、下围堰(3)前 ...
【技术特征摘要】
1.用于河流中取水头结构施工的围堰结构,其特征在于:包括外围堰,所述外围堰包括上围堰(1)、端围堰(2)和下围堰(3)依次连接而成,所述端围堰(2)的内侧和所述上围堰(1)的前端内侧均设置有加宽围堰(4),所述加宽围堰(4)与所述端围堰(2)和上围堰(1)之间铺设有复合土工膜(5),所述加宽围堰(4)与所述下围堰(3)之间的区域修筑有内围堰(6),所述取水头结构(7)的施工区域位于所述下围堰(3)与所述内围堰(6)之间的区域,所述内围堰(6)围挡住所述取水头结构(7)的前端和上游端,所述内围堰(6)的一端与所述下围堰(3)修筑连接在一起;所述上围堰(1)前端、下围堰(3)前端和端围堰(2)的堰体内通过高压旋喷的方式设置有若干桩体(13),相邻的桩体(13)之间扩散连接在一起,形成止水帷幕。2.根据权利要求1所述的用于河流中取水头结构施工的围堰结构,其特征在于:所述加宽围堰(4)从外往内包括垫料层(4-1)和填筑层(4-2),所述垫料层(4-1)铺设在所述复合土工膜(5)上,所述垫料层(4-1)为开挖的坡积土、粘土或者粉粘土,所述填筑层(4-2)为开挖的土石料,所述填筑层(4-2)内侧面的下端设置有细土麻袋(8),所述细土麻袋(8)压实所述填筑层(4-2)内侧面的下端;所述加宽围堰(4)内设置有若干加固基石(9),所述加固基石(9)对所述加宽围堰(4)起到基础支撑和加固的作用;所述内围堰(6)由片块石填筑而成,所述内围堰(6)的外侧面也铺设有所述复合土工膜(5)。3.根据权利要求1所述的用于河流中取水头结构施工的围堰结构,其特征在于:所述内围堰(6)与所述加宽围堰(4)之间设置有排水明沟(10),所述排水明沟(10)的轨迹与所述加宽围堰(4)的轨迹平行,所述排水明沟(10)的轨迹围挡住所述内围堰(6)的修筑轨迹,所述排水明沟(10)的一端与一集水坑(11)相连通,所述排水明沟(10)的引水纵向坡度为1%~3%,所述集水坑(11)低于所述排水明沟(10)的最低点;所述内围堰(6)与所述取水头结构(7)之间也设置有排水明沟(10),所述排水明沟(10)的轨迹与所述内围堰(6)的轨迹平行,所述排水明沟(10)的轨迹围挡住所述取水头结构(7)的前端、上游端和下游端,所述排水明沟(10)上也连接有一集水坑(11),所述排水明沟(10)的引水纵向坡度为1%~3%,所述集水坑(11)低于所述排水明沟(10)的最低点,所述排水明沟(10)和集水坑(11)内均铺设有塑料膜(12)。4.用于河流中取水头结构施工的围堰结构的施工方法,其特征在于:首先在已经修筑完成的外围堰的内侧面铺设复合土工膜(5),所述外围堰包括上围堰(1)、端围堰(2)和下围堰(3)依次连接而成,复合土工膜(5)铺设在所述端围堰(2)的内侧和所述上围堰(1)的前端内侧,然后在复合土工膜(5)的表面修筑加宽围堰(4),所述加宽围堰(4)包括垫料层(4-1)和填筑层(4-2),垫料层(4-1)铺设在在复合土工膜(5)的表面,所述垫料层(4-1)为坡积土、粘土或者粉粘土,且不能混入有尖锐轮廓的杂质,填筑层(4-2)铺设在垫料层(4-1)的表面,填筑层(4-2)为土石料,最后在所述加宽围堰(4)与所述下围堰(3)之间的区域修筑内围堰(6),所述取水...
【专利技术属性】
技术研发人员:徐茂钦,邬静芝,王祥,
申请(专利权)人:中国五冶集团有限公司,
类型:发明
国别省市:四川,51