The utility model provides a supporting structure for the unit maintenance of pumped storage power stations, which belongs to the technical field of supporting equipment for the maintenance of pumped storage power generating units. The utility model has the advantages that the utility model adopts the active bevel gear driven by the driving mechanism to drive the driven bevel gear, which is fixed on the lifting silk rod by the driven bevel gear, the lifting screw is raised and down with the rotation of the driven bevel gear, and the lifting and lifting parts are simultaneously ascending or descending along the two lifting silk rod and the two support guide rod. Movement, the lifting and lifting process of the whole lifting and lifting parts is driven by gear meshing, compact structure, smooth transmission, convenient adjustment and reliable operation, and the whole support structure can have a stable support effect on the energy storage power plant unit, can effectively reduce the direct impact on the ground, and greatly protect the internal knot of the power station unit. The construction function has improved the performance and reliability of the units of the pumped storage power station, and has good practical value and economic benefits.
【技术实现步骤摘要】
一种抽水蓄能电站机组检修用支撑结构
本技术涉及抽水蓄能电站机组检修用支撑设备
,尤其涉及一种抽水蓄能电站机组检修用支撑结构。
技术介绍
在抽水蓄能电站机组检修过程中,需要先将机坑内的座环的各个法兰面和止口进行机加工打磨,此工序打磨时间一般为30-40天,打磨完成后才能进行水轮机的底环与机坑内的座环之间的螺栓连接及焊接。由于位于上方的小径机坑里衬段的内径小于底环的直径,且底环为整体结构,所以现有的抽水蓄能电站机组检修方位为先浇筑大径机坑里衬段,然后进行座环的打磨加工,打磨完成后将底环吊装进机坑并与座环连接,最后浇筑小径机坑里衬段;从而使小径机坑里衬段的浇筑加工需要等底环打磨加工完成后再进行,导致检修人员的闲置和整体抽水蓄能电站机组检修工期的延长。因此,现有的抽水蓄能电站机组检修机组存在着检修效率较低和整体检修工期较长的问题。如何解决上述技术问题为本技术面临的课题。
技术实现思路
本技术的目的在于提供一种抽水蓄能电站机组检修用支撑结构。本技术是通过如下措施实现的:一种抽水蓄能电站机组检修用支撑结构,包括底座,其中,相对设置在所述底座上的两支撑导向杆,位于所述两支撑导向杆之间的升降丝杆,所述升降丝杆的下段一侧设有传动机构,在所述两支撑导向杆的之间设有沿所述升降丝杆上下移动的升降件,在所述升降件下方的所述两支撑导向杆上套接有压簧。所述升降件包括中部开设有螺纹孔的横板,设置在所述横板两端的凹形导向件,设置在所述横板上,与所述横板中部的所述螺纹孔同心设置的圆筒状升降套,设置在所述圆筒状升降套上段的翼型板,以及设置在所述翼型板上的支撑板。所述传动机构包括设置在所述升降丝杆 ...
【技术保护点】
一种抽水蓄能电站机组检修用支撑结构,包括底座(1),其特征在于,相对设置在所述底座(1)上的两支撑导向杆(2),位于所述两支撑导向杆(2)之间的升降丝杆(3),所述升降丝杆(3)的下段一侧设有传动机构(4),在所述两支撑导向杆(2)的之间设有沿所述升降丝杆(3)上下移动的升降件(5),在所述升降件(5)下方的所述两支撑导向杆(2)上套接有压簧(6)。
【技术特征摘要】
1.一种抽水蓄能电站机组检修用支撑结构,包括底座(1),其特征在于,相对设置在所述底座(1)上的两支撑导向杆(2),位于所述两支撑导向杆(2)之间的升降丝杆(3),所述升降丝杆(3)的下段一侧设有传动机构(4),在所述两支撑导向杆(2)的之间设有沿所述升降丝杆(3)上下移动的升降件(5),在所述升降件(5)下方的所述两支撑导向杆(2)上套接有压簧(6)。2.根据权利要求1所述的抽水蓄能电站机组检修用支撑结构,其特征在于,所述升降丝杆(3)包括中部开设有螺纹孔的横板(30),设置在所述横板(30)两端的凹形导向件(31),设置在所述横板(30)上,与所述横板(30)中部的所述螺纹孔同心设置的圆筒状升降套(32),设置在所述圆筒状升降套(32)上段的翼型板(33),以及设置在所述翼型板(33)上的支撑板(34)。3.根据权利要求1所述的抽水蓄能电站机组检修用支撑结构,其特征在于,所述传动机构(4)包括设置在所述升降丝杆(3)下端的从动锥...
【专利技术属性】
技术研发人员:郝更新,肖仁军,杨林生,谷文涌,田翔,王宜峰,
申请(专利权)人:国家电网公司,国网新源控股有限公司,山东泰山抽水蓄能电站有限责任公司,
类型:新型
国别省市:北京,11