The invention relates to a system and method for beating and forming holes of anchor foundation of strong weathered strata in Tibet. The steps are as follows: the identification points of several anchor holes are identified by using ash powder on the surface of strong weathered stratum under the anchor foundation platform, and the identification points of all anchor holes are numbered, and the construction of anchor hole marking points numbered as odd numbers is carried out. Kong Cheng odd numbered anchor holes; the odd number anchor holes were grouted by anchor holes respectively. After 24 hours of grouting, odd numbers of anchor holes were completed; even numbered anchor holes were constructed respectively, and even numbered anchor holes were bored. Then the bolt grouting construction was carried out to even number anchor holes to complete the foundation hole formation of strong weathered ground anchor. The invention adopts the interval jump beating. When the anchor hole is broken into holes, it is necessary to carry out the bolt grouting construction, and the remaining anchor hole jumping construction after 24 hours of concrete filling is ensured, which can effectively prevent the anchor hole hole collapse, expand the application scope of the anchor foundation in Tibet area, avoid earthwork excavation and protect the environment life. State.
【技术实现步骤摘要】
一种西藏强风化地层锚杆基础跳打成孔系统及方法
本专利技术涉及一种锚杆基础成孔系统及方法,特别是关于一种西藏强风化地层锚杆基础跳打成孔系统及方法。
技术介绍
在我国内地地区,锚杆基础常用于中等风化地层,该种地层风化痕迹不明显,组织结构较为完好,裂隙发育不完全,整体性较好。通常锚杆基础施工采用风镐进行施工,风镐在钻孔钻进过程中,因岩体强度高,土压力和钻杆产生的震动不会导致相邻已成孔的基础塌孔,因此锚孔可以连续施工完成后,再进行锚杆灌浆施工。但在我国西藏地区,地表层由于受高海拔气候侵蚀作用和风化严重,锚杆基础所处地层主要为第四系冲洪积形成的粉土、细砂、卵石,崩坡积的碎石、块石,厚度达到3~4m。但由于西藏地区环境和生态植被脆弱,环境保护要求极高,不允许清除较厚覆盖层,因此在西藏地区的强风化地层,进行锚杆基础施工,就要考虑到风镐钻进过程中的震动和成排逐一打孔导致土壤的挤压不均匀,造成相邻已成孔的基础塌孔。
技术实现思路
针对上述问题,本专利技术的目的是提供一种西藏强风化地层锚杆基础跳打成孔系统及方法,其适用于西藏强风化地层锚杆基础成孔,达到保护环境,减少或避免土方开挖的目的。为实现上述目的,本专利技术采取以下技术方案:一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于包括以下步骤:1)在锚杆基础承台下根据需要在强风化地层表面采用灰粉标识出若干锚孔标识点,并对所有锚孔标识点进行编号;2)对编号为奇数的锚孔标识点进行施工,钻孔成奇数锚孔;3)分别对奇数锚孔进行锚杆灌浆施工,等灌浆24小时后,完成奇数锚孔的施工;4)分别对偶数锚孔进行施工,钻孔成偶数锚孔,然后分别对偶数锚孔 ...
【技术保护点】
一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于包括以下步骤:1)在锚杆基础承台下根据需要在强风化地层表面采用灰粉标识出若干锚孔标识点,并对所有锚孔标识点进行编号;2)对编号为奇数的锚孔标识点进行施工,钻孔成奇数锚孔;3)分别对奇数锚孔进行锚杆灌浆施工,等灌浆24小时后,完成奇数锚孔的施工;4)分别对偶数锚孔进行施工,钻孔成偶数锚孔,然后分别对偶数锚孔进行锚杆灌浆施工,完成强风化地层锚杆基础成孔。
【技术特征摘要】
1.一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于包括以下步骤:1)在锚杆基础承台下根据需要在强风化地层表面采用灰粉标识出若干锚孔标识点,并对所有锚孔标识点进行编号;2)对编号为奇数的锚孔标识点进行施工,钻孔成奇数锚孔;3)分别对奇数锚孔进行锚杆灌浆施工,等灌浆24小时后,完成奇数锚孔的施工;4)分别对偶数锚孔进行施工,钻孔成偶数锚孔,然后分别对偶数锚孔进行锚杆灌浆施工,完成强风化地层锚杆基础成孔。2.如权利要求1所述的一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于:所述奇数锚孔和偶数锚孔的孔径均为120mm。3.如权利要求1所述的一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于:所述奇数锚孔和偶数锚孔的孔深均为3500mm。4.如权利要求1所述的一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于:相邻的所述奇数锚孔和偶数锚孔之间的孔间距大于等于400mm;相邻两个所述奇数锚孔或相邻两个所述偶数锚孔之间的孔间距大于等于800mm。5.如权利要求1至4任一项所述的一种西藏强风化地层锚杆基础跳打成孔方法,其特征在于:...
【专利技术属性】
技术研发人员:蔡德峰,朱勇,王赞,卢二岩,王伟,李占岭,张照青,李旭,高超飞,陈洁,郭之中,孔杰,舒邦京,郑群明,宋洪磊,肖绪峰,
申请(专利权)人:国家电网公司,国网西藏电力有限公司,河北省电力勘测设计研究院,国网物资有限公司,华北电力大学,北京华联电力工程监理有限公司,
类型:发明
国别省市:北京,11