The utility model belongs to a large-scale steel structure installation of construction equipment technical field, relates to a wind power base ring installation of special tools, including measuring flat base, the base is vertically provided in a vertical plate, a foot plate through a screw is movably arranged on one side of the lower end of the vertical plate, horizontal steel ruler is arranged level. The beneficial effect of the utility model is that the work efficiency of the installation and leveling of the foundation ring is increased, and the safety risk of the construction personnel is reduced. The structure is simple, the operation is convenient, the maintenance is convenient, and the cost is reduced.
【技术实现步骤摘要】
一种风力发电基础环安装调平测量专用工具
本技术属于大型钢结构安装施工工装
,涉及一种风力发电基础环安装调平测量专用工具。
技术介绍
由于风机设备整体过高,因此对整个风机垂直度要求严格,其中预埋基础环的水平度直接影响风机发电设备的垂直度、安全性和可靠性。风机基础环为圆形筒体,直径大、高度高,安装时采用顶部6、9、12平分点进行调平后固定,基础环水平偏差度要求高不能超过2.5mm以内,安装采用传统的水准仪和银瓦钢尺找平,水准仪采用DSZ1等精密测绘专用水准仪,在测量时钢尺需要人手扶垂直逐个分点测量保证精度。如申请号为CN201410214052的中国专利技术专利公开了一种风机基础环调平方法,风机基础环包括上法兰以及下法兰,其调平方法为:⑴、风机基础环对中:首先将风机基础环用吊车垂直吊起,将支撑调平用螺栓按设计值等距装在风机基础环的下法兰上,以风机基础环的下法兰外侧对应的塔筒门中心点为起点,用校验后的钢卷尺3等分风机基础环的下法兰的外周长,并且做好3个相应的标记点;在风机基础环就位到垫层上的预埋钢板上时,将风机基础环上法兰上的塔筒门中心点与垫层上用墨线弹出的塔筒门中心点对齐,误差小于10mm;将风机基础环下法兰上标记等分周长的3个标记点与垫层上用墨线弹出的3个预埋件中心线对齐,误差小于15mm,用垂球检查;对中完毕后,将风机基础环下面等距设置的三个支腿分别与垫层上的预埋钢板焊接牢固,方可撤离吊车;⑵、风机基础环粗调:在垫层上架设校验过的水准仪一台,水准仪高度低于风机基础环的下法兰底面,将钢角尺倒挂在一个支腿下法兰的上表面进行测量,其它两个支腿依次测量,测量 ...
【技术保护点】
一种风力发电基础环安装调平测量专用工具,其特征在于,包括底座,在底座上垂直设置有立板,在立板的一个侧面通过螺钉活动地设置有钢板尺,在钢板尺的下端水平设置有水准仪。
【技术特征摘要】
1.一种风力发电基础环安装调平测量专用工具,其特征在于,包括底座,在底座上垂直设置有立板,在立板的一个侧面通过螺钉活动地设置有钢板尺,在钢板尺的下端水平设置有水准仪。2.根据权利要...
【专利技术属性】
技术研发人员:范银鹏,白文科,党永长,李柱,
申请(专利权)人:中国水利水电第十一工程局有限公司,
类型:新型
国别省市:河南,41
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。