充电桩的供能方法技术

技术编号:16760106 阅读:61 留言:0更新日期:2017-12-09 04:36
本发明专利技术提供一种充电桩的供能方法;其包括以下步骤:检测当前电网负荷;比较当前电网负荷是否大于电网设计容量,若当前电网负荷大于电网设计容量,则减少充电桩的充电输出功率,直至当前电网负荷等于电网设计容量;若当前电网负荷不大于电网设计容量,则增加充电桩的充电输出功率,直至当前电网负荷等于电网设计容量。

Energy supply method for charging pile

The present invention provides a method for charging pile; it includes the following steps: detecting the load of power system; comparison of the current power grid load is greater than the design capacity of power grid, power grid if the current load is greater than the design capacity, reduce the output power of charging charging pile, when the load is equal to grid until the former design capacity; if the load of power system no more than the grid design capacity, increase the output power of charging charging pile, until the current load is equal to grid design capacity.

【技术实现步骤摘要】
充电桩的供能方法
本专利技术涉及一种充电桩的供能方法,特别涉及一种可动态控制充电桩的充电输出功率的充电桩的供能方法。
技术介绍
电网功率容量一直都是制约充电桩建设的一大难题。特别是老旧小区,由于建设日期较早,供电容量考虑不足,随着家用电器的数量增长,满足居民日常生活的用电已经吃紧,更别提在供电高峰时期,再有额外的功率容量供大功率的充电桩建设使用,因此这类小区物业管理者在建设充电桩时往往动力不足。而另外的一个场景是,在已有的充电桩电网中,随着后续发展,继续增加充电桩时,也可能面临原有功率容量规划不足的情况发生。因此开发一种能检测电网供电容量的充电桩,根据检测的参数来判断电网质量,在电网容量有裕度的情况下才开始进行充电,是解决这一问题的办法。
技术实现思路
本专利技术的主要目的在于提供一种可动态控制充电桩的充电输出功率的充电桩的供能方法。本专利技术提供一种充电桩的供能方法;其包括以下步骤:步骤100:检测当前电网负荷;步骤200:比较当前电网负荷是否大于电网设计容量,若当前电网负荷大于电网设计容量;执行步骤300;否则,执行步骤400;步骤300:减少充电桩的充电输出功率,直至当本文档来自技高网...
充电桩的供能方法

【技术保护点】
一种充电桩的供能方法;其特征在于包括以下步骤:步骤100:检测当前电网负荷;步骤200:比较当前电网负荷是否大于电网设计容量,若当前电网负荷大于电网设计容量;执行步骤300;否则, 执行步骤400;步骤300:减少充电桩的充电输出功率,直至当前电网负荷等于电网设计容量;步骤400:增加充电桩的充电输出功率,直至当前电网负荷等于电网设计容量。

【技术特征摘要】
1.一种充电桩的供能方法;其特征在于包括以下步骤:步骤100:检测当前电网负荷;步骤200:比较当前电网负荷是否大于电网设计容量,若当前电网负荷大于电网设计容量;执行步骤300;否则,执行步骤400;步骤300:减少充电桩的充电输出功率,直至当前电网负荷等于电网设计容量;步骤400:增加充电桩的充电输出功率,直至当前电网负荷等于电网设计容量。2.根据权利要求1所述的充电桩的供能方法,其特征在于:步骤100中通过电网前端的电网功率测量仪检测当前电网负荷。3.根据权利要求2所述的充电桩的供能方法,其特征在于:电网功率测量仪与充电桩之间以电力线载波的方式通讯。4.一种充电桩的供能方法;其特征在于包括以下步骤:步骤101:建立区域用电周期数据库;步骤201:...

【专利技术属性】
技术研发人员:陈文仿
申请(专利权)人:环达电脑上海有限公司
类型:发明
国别省市:上海,31

网友询问留言 已有0条评论