The invention relates to the technical field of karst cave treatment, and discloses a karst cave treatment structure and processing method of underground continuous wall. The treatment method includes the following steps: guide wall construction, exploration edge construction, punching position setting and punching bit construction. The structure comprises a processing guide wall, the surface on the surface of the rock, located in the rock cave; the guide wall includes two sets of guide wall units arranged in parallel, the two set of guide groove formed between the wall unit, in the guide groove along the guide groove extending direction. A plurality of guide hole, the guide hole runs through the rock; the pilot hole is sheathed in steel tube. With the structure of the invention through the pilot hole to fill the soluble filler, reinforcing the original filling under soft soil consolidation; processing method can make the treatment of karst cave and underground continuous wall trench simultaneously, so as to ensure the smooth and continuous underground wall into the groove groove quality, ensure the safety of underground continuous wall construction and shorten the construction period.
【技术实现步骤摘要】
一种地下连续墙的溶洞处理结构及处理方法
本专利技术涉及溶洞处理
,特别是涉及一种地下连续墙的溶洞处理结构及处理方法。
技术介绍
随着我国经济的迅猛发展,基础设施建设也在如火如荼的展开。在南方喀斯特地貌等在地质条件复杂处进行基础设施建设经常会遇到溶洞。这些溶洞会影响位于其上部的基础设施的稳固性,因此需要对溶洞进行处理,以使得适合在溶洞上方进行施工,而不会因地基不稳而坍塌。
技术实现思路
本专利技术的目的是提供一种能够使上部地下连续墙槽段顺利冲孔成槽而不会坍塌的溶洞处理结构和处理方法。为了解决上述技术问题,本专利技术提供一种地下连续墙的溶洞处理方法,其包括以下步骤:S1.导墙施工:用挖掘机将溶洞上方的地表挖掘成槽,在所述槽的侧壁和槽口两侧的地表设置钢模并浇筑混凝土,养护后拆除所述钢模形成相对设置的两个导墙单元,所述两个导墙单元之间形成导墙槽;S2.探边施工:在导墙槽两侧,沿所述导墙槽每隔一段距离设置一个探边孔,所述探边孔底部位于所述溶洞底部完整岩层内;S3.冲孔位设定:在所述导墙槽底部所述沿导墙槽延伸方向设置多个冲孔位、相邻两个所述冲孔位部分重叠;S4.冲孔施工:用第一冲孔桩对各冲孔位进行冲孔,冲孔时泥浆比重为1.2-1.5g/cm3,遇到漏浆后用填充料进行回填,回填完毕后重新制造泥浆,用冲孔锤将回填料击实,直至冲孔到设计底高程,最后用方锤修整孔壁。作为优选方案,在步骤S3中,将所述冲孔位依次编号,先对奇数冲孔位进行冲孔施工,再对偶数冲孔位进行冲孔施工。作为优选方案,在步骤S3和步骤S4之间还包括先导孔和溶洞填充的施工,所述先导孔和溶洞填充的施工方法为:用第 ...
【技术保护点】
一种地下连续墙的溶洞处理方法,其特征在于包括以下步骤:S1.导墙施工:用挖掘机将溶洞上方的地表挖掘成槽,在所述槽的侧壁和槽口两侧的地表设置钢模并浇筑混凝土,养护后拆除所述钢模形成相对设置的两个导墙单元,所述两个导墙单元之间形成导墙槽;S2.探边施工:在导墙槽两侧,沿所述导墙槽每隔一段距离设置一个探边孔,所述探边孔底部位于所述溶洞底部完整岩层内;S3.冲孔位设定:在所述导墙槽底部所述沿导墙槽延伸方向设置多个冲孔位、相邻两个所述冲孔位部分重叠;S4.冲孔施工:用第一冲孔桩对各冲孔位进行冲孔,冲孔时泥浆比重为1.2-1.5g/cm
【技术特征摘要】
1.一种地下连续墙的溶洞处理方法,其特征在于包括以下步骤:S1.导墙施工:用挖掘机将溶洞上方的地表挖掘成槽,在所述槽的侧壁和槽口两侧的地表设置钢模并浇筑混凝土,养护后拆除所述钢模形成相对设置的两个导墙单元,所述两个导墙单元之间形成导墙槽;S2.探边施工:在导墙槽两侧,沿所述导墙槽每隔一段距离设置一个探边孔,所述探边孔底部位于所述溶洞底部完整岩层内;S3.冲孔位设定:在所述导墙槽底部所述沿导墙槽延伸方向设置多个冲孔位、相邻两个所述冲孔位部分重叠;S4.冲孔施工:用第一冲孔桩对各冲孔位进行冲孔,冲孔时泥浆比重为1.2-1.5g/cm3,遇到漏浆后用填充料进行回填,回填完毕后重新制造泥浆,用冲孔锤将回填料击实,直至冲孔到设计底高程,最后用方锤修整孔壁。2.如权利要求1所述的地下连续墙的溶洞处理方法,其特征在于:在步骤S3中,将所述冲孔位依次编号,先对奇数冲孔位进行冲孔施工,再对偶数冲孔位进行冲孔施工。3.如权利要求1所述的地下连续墙的溶洞处理方法,其特征在于:在步骤S3和步骤S4之间还包括先导孔和溶洞填充的施工,所述先导孔和溶洞填充的施工方法为:用第一冲孔桩冲击导墙槽底部至岩层,在所述岩层上方的冲孔内设有钢护筒,然后用第二冲孔桩冲破岩层,形成先导孔,按所述方法依次施工沿所述导墙槽形成多个所述先导孔;然后通过所述先导孔向溶洞内填充填充物;所述第二冲孔桩的直径小于所述第一冲孔桩。4.如权利要求3所述的地下连续墙的溶洞处理方法,其特征在于:多个所述先导孔间隔设置。5.如权利要求3所述的地下连续墙的溶洞处理...
【专利技术属性】
技术研发人员:陈秋声,李小鹏,郭少斌,张宪武,白振华,章春楷,杨威,刘海,
申请(专利权)人:广东省水利水电第三工程局有限公司,