The invention relates to a high shear wall wall bolt hole plugging method, solves the existing shear wall wall bolt hole plugging are time-consuming, mortar waste serious, difficult repair and prone to leakage and thermal problems. A shear wall, concrete pouring has been completed, the formation of the bolt hole; B, select the wedge mounted on the I drill pipe drilling drill, PVC tube removal; C, select a cone impact drill bit installed in the I alloy, the outer end of the bolt hole form a flare; D, glue, and pre preparation the mortar block is fixed on the outer end of the bolt hole; E, grouting, the interface agent of centrifugal spray to the inner wall of the bolt hole, then the expansive cement mortar spraying on the surface of the interface agent, and at the center of the front end of the extrusion to the bolt hole; finally, f artificial exterior end to dense packing. The invention can effectively improve the efficiency of construction, and completely eliminate the occurrence of leakage and thermal phenomena.
【技术实现步骤摘要】
一种高效剪力墙穿墙螺栓孔洞封堵方法
本专利技术涉及建筑工程用封堵方法,具体为一种高效剪力墙穿墙螺栓孔洞封堵方法。
技术介绍
剪力墙施工过程中,墙模板支设时为加固模板,在模板两侧设置有对拉螺栓(在木模板支设过程中,为方便对拉螺栓取出重复利用,在对拉螺栓外设置有PVC套管),混凝土浇筑完成,拆除模板后,将对拉螺杆取出,因此在剪力墙上形成多个孔洞(剪力墙上对拉螺栓梅花形布置,间距约为450-550mm,一般经过计算确定)。目前,孔洞封堵作业时,一般是工人用小灰斗一点点将砂浆填入孔洞,用钢筋棍捣实,封堵过程耗费大量的人工,且砂浆浪费严重,更加严重的是封堵不密实,封堵过程也不取PVC管,如果封堵时不取出PVC管,封堵的砂浆还不易粘结,尤其是外墙上的孔洞,很容易造成渗漏隐患和热桥现象,修补时还需将外墙保温和室外装饰层剔除,返修困难,且需高空作业。
技术实现思路
本专利技术为了解决现有剪力墙穿墙螺栓孔洞封堵存在费时费力、砂浆浪费严重、返修困难且易发生渗漏隐患及热桥现象的问题,提供了一种高效剪力墙穿墙螺栓孔洞封堵方法。本专利技术是采用如下技术方案实现的:一种高效剪力墙穿墙螺栓孔洞封堵 ...
【技术保护点】
一种高效剪力墙穿墙螺栓孔洞封堵方法,其特征在于:采用如下步骤:a、剪力墙混凝土浇筑完毕达到拆模强度后,拆除模板并取出穿墙螺栓,形成带PVC管的螺栓孔洞(1);b、选取木楔钻杆(2)安装在冲击钻I(3)上,启动冲击钻I(3),木楔钻杆(2)逐步向螺栓孔洞(1)内钻动,当发现PVC管松动后,关闭冲击钻I(3)开关,将PVC管从螺栓孔洞(1)中取出;c、待混凝土达到一定强度后,选取锥台状合金钻头(4)安装在冲击钻I(3)上,并在锥台状合金钻头(4)的锥面上固定有挡墙卡环(5),随后开启冲击钻I(3),在外墙外端对着螺栓孔洞(1)进行钻取工作,当挡墙卡环(5)被外墙端面挡住时,停止 ...
【技术特征摘要】
1.一种高效剪力墙穿墙螺栓孔洞封堵方法,其特征在于:采用如下步骤:a、剪力墙混凝土浇筑完毕达到拆模强度后,拆除模板并取出穿墙螺栓,形成带PVC管的螺栓孔洞(1);b、选取木楔钻杆(2)安装在冲击钻I(3)上,启动冲击钻I(3),木楔钻杆(2)逐步向螺栓孔洞(1)内钻动,当发现PVC管松动后,关闭冲击钻I(3)开关,将PVC管从螺栓孔洞(1)中取出;c、待混凝土达到一定强度后,选取锥台状合金钻头(4)安装在冲击钻I(3)上,并在锥台状合金钻头(4)的锥面上固定有挡墙卡环(5),随后开启冲击钻I(3),在外墙外端对着螺栓孔洞(1)进行钻取工作,当挡墙卡环(5)被外墙端面挡住时,停止工作,此时在螺栓孔洞(1)外端形成喇叭口;d、在螺栓孔洞(1)的喇叭口处涂抹胶水,并将与喇叭口配合的预制砂浆块(6)固定在螺栓孔洞(1)外端进行封堵;e、然后选取注浆装置进行注浆,注浆装置包括冲击钻II(7),冲击钻II(7)的前端夹持有空心钻杆(8),空心钻杆(8)的侧壁上开有若干喷浆口(16),空心钻杆(8)的前端开有挤压浆口(17),空心钻杆(8)的尾端设置有与其连通且通过旋转接头连接的镀锌管(9),镀锌管(9)的...
【专利技术属性】
技术研发人员:任旭红,刘广,刘鑫,李飚,张宝,
申请(专利权)人:大同泰瑞集团建设有限公司,
类型:发明
国别省市:山西,14