The utility model discloses a roof construction of reserved hole formwork support structure, including several layers of reserved holes, on opposite sides of the top edge of the reserved hole fixed beam, beam between the two sides of a fixed number of uniform distribution of the secondary beam and the secondary beam ends are respectively fixed on the two side beam, on both sides of type steel girder erection scaffolding, the scaffolding of the base are respectively arranged on two sides of the support beam; the scaffold is arranged on the top of the two plate supporting beam, two plate support beams on two steel beams, and the two plate support beam between a fixed number of uniform distribution in the next beam, two end plates are respectively arranged on two beams next time under the plate of the support beam; the supporting plate on the beam and plate beam template set next time. The utility model is used to solve the reserved hole roof construction of cast-in-place floor type support frame is set when there is a big security risk problem in the existing technology, provide support and reduce security risks for the purpose of the reserved hole cast-in-place roof.
【技术实现步骤摘要】
一种预留洞顶盖施工的模板支撑结构
本技术涉及土建施工领域,具体涉及一种预留洞顶盖施工的模板支撑结构。
技术介绍
在大型综合体项目的土建施工中,主体结构的中间层会出现有连续若干层是大面积预留洞的情况,比如自动扶梯的预留洞、中庭镂空预留洞等,这部分预留洞通常面积较大。现有技术中,预留洞顶部的混凝土顶盖在进行现浇施工时,底部模板支撑架仅能按照常规方式,采取落地式支模架,通常会是高度很高的的超高架体,架设复杂、费工费时,同时由于高度太高,还存在较大的安全隐患。
技术实现思路
本技术的目的在于提供一种预留洞顶盖施工的模板支撑结构,以解决现有技术中预留洞顶盖现浇施工时设置落地式支模架存在较大安全隐患的问题,实现为预留洞顶盖现浇提供支撑同时降低安全隐患的目的。本技术通过下述技术方案实现:一种预留洞顶盖施工的模板支撑结构,包括若干层的预留洞,在最顶层预留洞洞口相对两侧边处设置固定的型钢梁,两侧的型钢梁之间固定若干均匀分布的次梁,次梁两端分别固定在两侧的型钢梁上,两侧的型钢梁之上架设支撑脚手架,所述支撑脚手架的底座分别设置于两侧的型钢梁上;支撑脚手架顶部设置两根板下支撑梁,两根板下支撑梁正对两根型钢梁,且两根板下支撑梁之间固定若干均匀分布的板下次梁,板下次梁的两端分别设置于两根板下支撑梁上;所述板下支撑梁、板下次梁之上设置模板。针对现有技术中预留洞顶盖现浇施工时设置落地式支模架时,架设复杂、费工费时、同时还存在较大安全隐患的问题,本技术提出一种预留洞顶盖施工的模板支撑结构,在若干层大面积预留洞之中最顶层的预留洞上设置,包括在最顶层预留洞洞口相对的两内侧边固定型钢梁作为支撑的主梁结构 ...
【技术保护点】
一种预留洞顶盖施工的模板支撑结构,包括若干层的预留洞,其特征在于,在最顶层预留洞洞口相对两侧边处设置固定的型钢梁(1),两侧的型钢梁(1)之间固定若干均匀分布的次梁(2),次梁(2)两端分别固定在两侧的型钢梁(1)上,两侧的型钢梁(1)之上架设支撑脚手架(3),所述支撑脚手架(3)的底座分别设置于两侧的型钢梁(1)上;支撑脚手架(3)顶部设置两根板下支撑梁(4),两根板下支撑梁(4)正对两根型钢梁(1),且两根板下支撑梁(4)之间固定若干均匀分布的板下次梁(5),板下次梁(5)的两端分别设置于两根板下支撑梁(4)上;所述板下支撑梁(4)、板下次梁(5)之上设置模板(6)。
【技术特征摘要】
1.一种预留洞顶盖施工的模板支撑结构,包括若干层的预留洞,其特征在于,在最顶层预留洞洞口相对两侧边处设置固定的型钢梁(1),两侧的型钢梁(1)之间固定若干均匀分布的次梁(2),次梁(2)两端分别固定在两侧的型钢梁(1)上,两侧的型钢梁(1)之上架设支撑脚手架(3),所述支撑脚手架(3)的底座分别设置于两侧的型钢梁(1)上;支撑脚手架(3)顶部设置两根板下支撑梁(4),两根板下支撑梁(4)正对两根型钢梁(1),且两根板下支撑梁(4)之间固定若干均匀分布的板下次梁(5),板下次梁(5)的两端分别设置于两根板下支撑梁(4)上;所述板下支撑梁(4)、板下次梁(5)之上设置模板(6)。2.根据权利要求1所述的一种预留洞顶盖施工的模板支撑结构,其特征在于,所述型钢梁(1)与预留洞侧壁通过钢筋锚固连接。3.根据权利要求1所述的一种预留洞顶盖施工的模板支撑结构,其特征在于,两侧的型钢梁(1)之间还设置有若干平行于型钢梁(1)的第一辅助梁(7),所述第一辅助梁(7)的两端均通过钢筋锚固在预留洞侧壁。4.根据权利要求1所述的一种预留洞顶盖施工的模板支撑结构,其特...
【专利技术属性】
技术研发人员:叶小斌,杨涵,