一种针对静压桩机进行破除桩头的破桩器及其施工方法技术

技术编号:16123234 阅读:559 留言:0更新日期:2017-09-01 18:02
本发明专利技术公开一种针对静压桩机进行破除桩头的破桩器及其施工方法,由破桩器本体构成,所述破桩器包括上表面中心带有环形吊耳的圆形基板,其下表面连接有十字形锥头;所述锥头的长度在大于500mm,本发明专利技术可以实现快速、精准、彻底进行桩头破碎工作,杜绝在破碎桩头时对桩身的破坏,提高了施工质量。

Pile breaking device for removing pile head of static pressure pile machine and construction method thereof

The invention discloses a method for static pressure pile machine to get rid of the pile head is broken pile and its construction method, composed of broken pile body, the broken circle center of the substrate surface pile device comprises an upper with an annular lug, the lower surface is connected with a cross shaped cone; the cone head length at large in 500mm, the invention can realize fast, accurate and thorough work to prevent the pile head broken, broken in the pile head to the pile body damage, improve the quality of construction.

【技术实现步骤摘要】
一种针对静压桩机进行破除桩头的破桩器及其施工方法
本专利技术涉及建筑业进行破桩的辅助工具,特别是涉及一种针对静压桩机进行破除桩头的破桩器及其施工方法。
技术介绍
静压桩机是桩基工程的主要施工设备,一般用于城市中降噪要求较高的预应力混凝土管桩工程的施工,目前管桩的桩顶标高均由设计单位依据地勘报告及构筑物的承载力进行设计,但由于地质勘探单位取点的范围不同,地勘报告的准确性、连续性就会存在较大的差异。往往会导致施工过程中出现混凝土管桩无法施压到设计标高(设计标高一般往往在自然地坪以下),露出自然地坪较高的情况。由于静压桩机的工作原理是混凝土管桩在桩机大船、小船(大船小船是指桩机纵横行走及打桩施工支撑的四个包围式的液压配重脚)中央部位通过环抱式卡具夹住管桩进行液压压桩施工,大小船行走时的提升高度只有500mm,如果管桩露出地面较高就需要先截掉自然地坪以上的管桩,静压桩机才能继续行走施工,待基槽开挖后再进行二次截桩至设计标高。一般截桩至少需要专业人士在30分钟以上才能完成,这就给给桩基施工带来难度,极大的降低了施工效率。目前截桩的方法主要是:(1)先选用锯桩器对自然地坪以上的多余管桩进行截除。本文档来自技高网...
一种针对静压桩机进行破除桩头的破桩器及其施工方法

【技术保护点】
一种针对静压桩机进行破除桩头的破桩器,由破桩器本体构成,其特征在于,所述破桩器包括上表面中心带有环形吊耳的圆形基板,其下表面连接有十字形锥头;所述锥头的长度在大于500mm。

【技术特征摘要】
1.一种针对静压桩机进行破除桩头的破桩器,由破桩器本体构成,其特征在于,所述破桩器包括上表面中心带有环形吊耳的圆形基板,其下表面连接有十字形锥头;所述锥头的长度在大于500mm。2.根据权利要求1所述的一种针对静压桩机进行破除桩头的破桩器,其特征在于,所述破桩器本体采用厚度为25mm的Q345B钢板焊制而成。3.采用权利要求1所述的一种针对静压桩机进行破除桩头的破桩器施工方法,其特征在于,包括以下步骤:(1)将所述破桩器的锥头...

【专利技术属性】