The utility model relates to a novel assembly type energy dissipation concrete frame shear wall structure, including shear wall, shear wall is arranged outside the frame surrounded by frame beams and columns, beams and columns for a plurality of reinforcement through hole, the through hole is inserted into the steel reinforcement, leaving a gap between frame and shear the wall surface, the rubber interlayer filling in the gap, the structure of reinforced concrete frame shear wall and energy dissipation functions, namely the implementation of frame shear wall structure and energy dissipation function integration.
【技术实现步骤摘要】
一种新型装配式耗能减震混凝土框架-剪力墙结构
本技术涉及框架剪力墙结构,尤其是一种新型装配式耗能减震混凝土框架-剪力墙结构。
技术介绍
框剪结构,由框架和剪力墙结构两种不同的抗侧力结构组成的新的受力形式。用钢筋混凝土墙板来代替框架结构中的梁柱,各类荷载引起的内力,控制结构的水平力。主要分为钢架剪力墙结构和钢筋混凝土框架剪力墙结构。该结构对水泥两要求大,计算以及施工过程耗时长,且不具有耗能减震的功能。此外,框架-剪力墙结构的屈服顺序为:剪力墙根部→框架各层梁端→框架各柱根部,剪力墙的屈服和耗能能力对整个结构的承载力和变形性能影响很大。由于剪力墙的刚度远远大于框架的刚度,剪力墙承担了大部分剪力,而框架却只承担小部分剪力。因此,在地震作用下,通常是剪力墙首先屈服,之后将产生内力重分配,框架承担的剪力比例将会增加。如果地震作用继续增大,则框架也会随后进入屈服状态而导致建筑物倒塌。目前具有耗能减震功能的钢筋混凝土框架剪力墙基本上都是在主体框架结构中附加附属结构实现消能减震功能。虽然耗能减震效果良好,但是需要安装空间,影响建筑结构的使用功能,施工工艺复杂,工期长。并且在消能的同时,增加了对主体结构附加承载力的影响。
技术实现思路
本技术的目的是为了解决现有技术中框剪结构所存在的缺陷,提供一种新型装配式耗能减震混凝土框架-剪力墙结构。为了实现上述目的,本技术采用的技术方案是:一种新型装配式耗能减震混凝土框架-剪力墙结构,包括剪力墙,剪力墙外侧设有由框架梁和框架柱围成的框架,框架梁和框架柱上预留多个钢筋贯穿孔,钢筋贯穿孔内插入钢筋,框架与剪力墙的周面之间留有间隙,在间隙内填充橡胶 ...
【技术保护点】
一种新型装配式耗能减震混凝土框架‑剪力墙结构,其特征在于,包括剪力墙,剪力墙外侧设有由框架梁和框架柱围成的框架,框架梁和框架柱上预留多个钢筋贯穿孔,钢筋贯穿孔内插入钢筋,框架与剪力墙的周面之间留有间隙,在间隙内填充橡胶隔层。
【技术特征摘要】
1.一种新型装配式耗能减震混凝土框架-剪力墙结构,其特征在于,包括剪力墙,剪力墙外侧设有由框架梁和框架柱围成的框架,框架梁和框架柱上预留多个钢筋贯穿孔,钢筋贯穿孔内插入钢筋,框架与剪力墙的周面之间留有间隙,在间隙内填充橡胶隔层。2.根据权利要求1所述的一种新型装配式耗能减震混凝土框架-剪力墙结构,其特征在于,所述框架柱为钢筋混凝土柱,框架梁为钢筋混凝土梁。3.根据权利要求1所述的一种新型装配式耗能减震混凝土框架-剪力墙结构,其特征在于,所述剪力墙...
【专利技术属性】
技术研发人员:许倩,高金贺,昌毅,张王杰,章颖辉,
申请(专利权)人:东华理工大学,
类型:新型
国别省市:江西,36