The invention provides a OPGW optical fiber cable station under floor distribution method, comprising the following steps: OPGW through the cable tension string is fixed on the wall, the tension string tension on the roof of the building power distribution wire and ground wire; the sticking wall on the ground along the extending direction of the cable layer of a joint well, well joint is arranged in the connector box and guide cable; in the joint well wall perforated pipe, to get connected pipeline distribution inside and outside the 9 floor; OPGW cable along the wall to lead and guide the cable joint wells, and wells in the joint connection box for connecting the cable transfer to guide; joint well matched, and along the cable laying layer to the communication equipment room or two room. Thus OPGW cable and cable guide in joint well within the joint box to continue the conversion, the cable station more optimized layout appearance, safe and reliable; at the same time, the distribution pipes are embedded in the wall of the building and connected at the bottom, so as not to affect the overall structure of housing can.
【技术实现步骤摘要】
本专利技术涉及高压输电线路领域,尤其涉及一种配电楼OPGW光缆引下进站方法。
技术介绍
OPGW光缆(OpticalFiberCompositeOverheadGroundWire光纤复合架空地线),是指把光纤放置在架空高压输电线的地线中,用以构成输电线路上的光纤通信网,其具有普通架空地线和通信光缆的双重功能,因此被广泛的应用于电力系统中。OPGW光缆在引入配电楼时,固定OPGW光缆的耐张串的耐张串地线需要与配电楼屋顶的地线相接,并且OPGW不能直接进入配电楼,其必须与通信室的导引光缆接续,以组成光纤通信传输管道。目前,现有的配电楼OPGW光缆进站引入方法一般采用OPGW光缆向上翻过女儿墙后,于女儿墙内侧设置的接头盒中转换接续导引光缆,然后在配电楼的屋顶穿墙埋管,导引光缆通过管路进入配电楼,并跨过配电楼内部空间接入通信室或者二次设备室。此方法中因接头盒直接裸露在外,进而使OPGW光缆与导引光缆之间的接续环境安全可靠性底下。同时,在传统的配电楼的墙体中,因未考虑引入OPGW光缆,进而在配电楼屋顶并未预先做穿墙埋管设计,加之设置有导引光缆的电缆层一般设置在配电楼的最底层,这就导致OPGW光缆不能与通信机房内的导引光缆进行转换接续;同时,若后续在屋顶上穿墙埋管,会对配电楼的整体房屋结构造成影响,进而造成安全性能降低的技术缺陷。因此针对屋顶未做出穿墙埋管设计的配电楼,如何安全可靠的实现OPGW光缆进站引入成为了现如今亟待解决的问题。
技术实现思路
为此,本专利技术要解决的技术问题在于克服现有技术的OPGW光缆进站时因传统配电楼的接头盒裸露在外,同时屋 ...
【技术保护点】
一种配电楼OPGW光缆引下进站方法,其特征在于,包括如下步骤:将OPGW光缆(1)通过耐张串(2)固定在外墙上,所述耐张串(2)的耐张串地线(3)与屋顶的配电楼地线(4)连接;在贴着墙体的地面上沿着电缆层(5)的延伸方向做一个接头井(6),所述接头井(6)内设置有接头盒(7)以及导引光缆(8);在所述接头井(6)处的墙壁上穿孔埋管,以得到连通配电楼内外的管路(9);将所述OPGW光缆(1)沿墙体引下至接头井(6)中,并与所述接头井(6)内的所述导引光缆(8)在所述接头盒(7)中转换接续;将所述导引光缆(8)于所述接头井(6)内配出,并沿所述电缆层(5)敷设至通信室或二次设备室。
【技术特征摘要】
1.一种配电楼OPGW光缆引下进站方法,其特征在于,包括如下步骤:将OPGW光缆(1)通过耐张串(2)固定在外墙上,所述耐张串(2)的耐张串地线(3)与屋顶的配电楼地线(4)连接;在贴着墙体的地面上沿着电缆层(5)的延伸方向做一个接头井(6),所述接头井(6)内设置有接头盒(7)以及导引光缆(8);在所述接头井(6)处的墙壁上穿孔埋管,以得到连通配电楼内外的管路(9);将所述OPGW光缆(1)沿墙体引下至接头井(6)中,并与所述接头井(6)内的所述导引光缆(8)在所述接头盒(7)中转换接续;将所述导引光缆(8)于所述接头井(6)内配出,并沿所述电缆层(5)敷设至通信室或二次设备室。2.根据权利要求1所述的配电楼OPGW光缆引下进站方法,其特征在于,在所述在贴着墙体的地面上沿着电缆层(5)的延伸方向做一个接头井(6)的步骤中,所述接头井(6)位于所述OPGW光缆(1)的下方。3.根据权利要求2所述的配电楼OPGW光缆引下进站方法,其特征在于,在所述将所述导引光缆(8)于所述接头井(6)内配出的步骤中,所述导引光缆(8)通过所述管路(9)进入所述电缆层(5)中。4.根据权利要求1所述的配电楼OPGW光缆引下进站方法,其特征在于,在所述将所述OPGW光缆(1)...
【专利技术属性】
技术研发人员:张屹,李铭,李亨,王义元,孙成,谢玉强,曲伟,崔艳昭,孙少斌,吕镇,钱学庆,
申请(专利权)人:国网山东省电力公司青岛供电公司,国家电网公司,
类型:发明
国别省市:山东;37