The utility model discloses a reinforced concrete filling device for artificial rivers, which comprises a fixing bracket, a fixing plate and a fixing plate. The fixing bracket is fixed with a mold support plate, and the upper surface of the mold support plate is provided with a mold cover. The inner part of the fixing bracket is reserved with a first groove, and the first groove is arranged in the upper surface of the mold support plate. A first fixing block is installed. The fixing plate is installed below the die support plate, and the fixing plate is connected with the fixing bracket through the first fixing block, and the fixing bracket is connected with the movable bracket through the second fixing block. The artificial river is filled with reinforced concrete device. The mould can be used repeatedly to save energy. The device can make four concrete blocks at the same time, save time and space by arranging the mould along the vertical direction. It can transfer the concrete blocks on the mobile support conveniently, and the mobile support can transport up to 13 concrete blocks at the same time, save manpower and increase work efficiency.
【技术实现步骤摘要】
一种人工河流用填充钢筋混凝土装置
本技术涉及钢筋混凝土装置相关
,具体为一种人工河流用填充钢筋混凝土装置。
技术介绍
人工河流的两岸受水流冲刷,会使河岸不断地坍塌。为保护路堤安全,须修筑防护建筑物,护坡使放置边坡受冲刷,在坡面上所做的各种铺砌和栽植的统称。护坡需要使用大量标准化的钢筋混凝土块,需要使用模具对钢筋混凝土进行浇筑,但市面上大多护坡模具均需现场安装,不能重复使用,不环保,施工时间长,不能同时制作多个混凝土块。
技术实现思路
本技术的目的在于提供一种人工河流用填充钢筋混凝土装置,以解决上述
技术介绍
中提出的市面上大多模具需现场安装,不能重复使用,工作效率较低的问题。为实现上述目的,本技术提供如下技术方案:一种人工河流用填充钢筋混凝土装置,包括固定支架、置物板和固定板,所述固定支架上固定有模具支撑板,且模具支撑板的上表面设置有模具造型板,并且模具造型板的上表面设置有模具盖,所述固定支架的内部预留有第一凹槽,且第一凹槽内安装有第一固定块,所述置物板安装在模具支撑板的下方,且置物板通过第一固定块与固定支架相连接,所述固定支架通过第二固定块与移动支架相连接,且移动支架的下表面安装有万向轮,所述移动支架的内部预留有第二凹槽,且第二凹槽内安装有第三固定块,所述固定板通过第三固定块与移动支架相连接,且传送块通过固定板与移动支架相连接,所述移动支架的右侧下方位置设置有连接块,且连接块通过固定绳与把手相连接,所述移动支架的前后两侧均连接有固定杆,且移动支架的前表面上方位置上设置有置物块。优选的,所述置物板和模具支撑板呈平行分布,且置物板在固定支架上构成滑动结构,并且置物 ...
【技术保护点】
1.一种人工河流用填充钢筋混凝土装置,包括固定支架(1)、置物板(5)和固定板(9),其特征在于:所述固定支架(1)上固定有模具支撑板(2),且模具支撑板(2)的上表面设置有模具造型板(3),并且模具造型板(3)的上表面设置有模具盖(4),所述固定支架(1)的内部预留有第一凹槽(18),且第一凹槽(18)内安装有第一固定块(6),所述置物板(5)安装在模具支撑板(2)的下方,且置物板(5)通过第一固定块(6)与固定支架(1)相连接,所述固定支架(1)通过第二固定块(7)与移动支架(8)相连接,且移动支架(8)的下表面安装有万向轮(13),所述移动支架(8)的内部预留有第二凹槽(19),且第二凹槽(19)内安装有第三固定块(11),所述固定板(9)通过第三固定块(11)与移动支架(8)相连接,且传送块(10)通过固定板(9)与移动支架(8)相连接,所述移动支架(8)的右侧下方位置设置有连接块(14),且连接块(14)通过固定绳(15)与把手(17)相连接,所述移动支架(8)的前后两侧均连接有固定杆(12),且移动支架(8)的前表面上方位置上设置有置物块(16)。
【技术特征摘要】
1.一种人工河流用填充钢筋混凝土装置,包括固定支架(1)、置物板(5)和固定板(9),其特征在于:所述固定支架(1)上固定有模具支撑板(2),且模具支撑板(2)的上表面设置有模具造型板(3),并且模具造型板(3)的上表面设置有模具盖(4),所述固定支架(1)的内部预留有第一凹槽(18),且第一凹槽(18)内安装有第一固定块(6),所述置物板(5)安装在模具支撑板(2)的下方,且置物板(5)通过第一固定块(6)与固定支架(1)相连接,所述固定支架(1)通过第二固定块(7)与移动支架(8)相连接,且移动支架(8)的下表面安装有万向轮(13),所述移动支架(8)的内部预留有第二凹槽(19),且第二凹槽(19)内安装有第三固定块(11),所述固定板(9)通过第三固定块(11)与移动支架(8)相连接,且传送块(10)通过固定板(9)与移动支架(8)相连接,所述移动支架(8)的右侧下方位置设置有连接块(14),且连接块(14)通过固定绳(15)与把手(17)相连接,所述移动支架(8)的前后两侧均连接有固定杆(12),且移动支架(8)的前表面上方位置上设置有置物块(16)。2.根据权利要求1所述的一种人工河流用填充钢筋混凝土装置,其特征在于:所述置物板(5)和模具支撑板(2)呈平行分布,且置物板(5...
【专利技术属性】
技术研发人员:冯德火,
申请(专利权)人:永春县品冠科技有限公司,
类型:新型
国别省市:福建,35
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。