The invention discloses a design method of TBM retrofitting tunnel expansion, which comprises the following steps: removing four ring segments from the back of TBM tail shield, and carrying out TBM retrofitting and expanding tunnel construction after removing. The excavation adopts hand-held air pick with small excavator, and the excavation section is 11.2m. Supporting parameters: 26mm threaded steel grid arch with spacing of 75cm; 8m self-propelled glass fiber bolt with circumferential spacing of 1m and longitudinal spacing of 75cm; 40cm thick C40 steel fiber shotcrete initial support; 4 deformation grooves are installed in each grid arch, and stress deformers are installed in the deformation groove. A self-propelled bolt pipe shed with L=6m and 32mm@45cm is set up for advanced support. The invention can solve specific problems creatively under special geological conditions with pioneering thinking and combined with specific working conditions, and has the characteristics of wide application range and is suitable for popularization and application.
【技术实现步骤摘要】
一种TBM改造洞室扩挖设计方法
本专利技术属于水利工程
,涉及一种TBM改造洞室扩挖设计方法。
技术介绍
对于开挖地下工程来说,之前采用的方式是利用钻爆法,但是随着我国在机械化的不断发展,目前比较常见的方法就是对TBM(岩石隧道掘进机)的使用,正是因为具有众多的优势而被广泛使用,如实现了成本的节约,在施工的过程中利用此方法使其周围环境受到较低影响,人身更为安全,可以使其工程的质量得到提高,对此和传统的方法相比较,目前在使用中对其施工提出了更多的要求,很多的国外大国就将其传统的钻爆以及TBM方法进行结合,实现了TBM施工导洞,而且进行了扩挖,实现了更为有效的结果。基于TBM导洞扩挖方法优点,从TBM直径及导洞位置的比选进行分析,由于导洞位置的选择导致稳定性的不同而进行重点分析。TBM施工受地质条件影响非常大,特殊地质条件下必须要以开拓性的思维,结合具体工况,创造性地解决具体问题。
技术实现思路
本专利技术的目的在于提供一种TBM改造洞室扩挖设计方法。其具体技术方案为:一种TBM改造洞室扩挖设计方法,包括以下步骤:步骤1、从TBM尾盾后部拆除4环管片;步骤2、拆除后进行TBM改造扩大洞室施工,开挖采用人工手持风镐配合小型挖机,开挖断面11.2m,复杂地质条件下采用支护结构;步骤3、从左侧打旁通洞到TBM机头前,向前或后开挖TBM改造洞室,向后把TBM刀盘和前护盾挖出来;伸缩护盾、支撑盾和尾盾留下做一次支护,待TBM后配套通过后再进行二次衬砌;TBM尾部对已扩挖段进行回填;步骤4、拆除设备桥,从4729~4732环管片左侧开口,开挖旁通洞,绕行至TBM刀盘前方 ...
【技术保护点】
1.一种TBM改造洞室扩挖设计方法,其特征在于,包括以下步骤:步骤1、从TBM尾盾后部拆除4环管片;步骤2、拆除后进行TBM改造扩大洞室施工,开挖采用人工手持风镐配合小型挖机,开挖断面11.2m,复杂地质条件下采用支护结构;步骤3、从左侧打旁通洞到TBM机头前,向前或后开挖TBM改造洞室,向后把TBM刀盘和前护盾挖出来;伸缩护盾、支撑盾和尾盾留下做一次支护,待TBM后配套通过后再进行二次衬砌;TBM尾部对已扩挖段进行回填;步骤4、拆除设备桥,从4729~4732环管片左侧开口,开挖旁通洞,绕行至TBM刀盘前方,进行TBM改造洞室开挖施工,并解困TBM,同时旁通洞继续开挖第三段绕行至前方主洞,对前方不良地质段进行提前人工开挖处理,以降低TBM在断层破碎带中的施工风险;在改造洞室施工的同时,对TBM原改造扩大洞室塌方进行处理,并拆除TBM,对受损部件进行检修;步骤5、在完成改造洞室以及启动洞室施工后,是TBM的组装工作与旁通洞第三段和40米的主洞上导洞的开挖平行作业,主洞人工全断面开挖,TBM由启动洞室开始掘进,主洞160m采取人工开挖上导洞TBM掘进下导洞。
【技术特征摘要】
1.一种TBM改造洞室扩挖设计方法,其特征在于,包括以下步骤:步骤1、从TBM尾盾后部拆除4环管片;步骤2、拆除后进行TBM改造扩大洞室施工,开挖采用人工手持风镐配合小型挖机,开挖断面11.2m,复杂地质条件下采用支护结构;步骤3、从左侧打旁通洞到TBM机头前,向前或后开挖TBM改造洞室,向后把TBM刀盘和前护盾挖出来;伸缩护盾、支撑盾和尾盾留下做一次支护,待TBM后配套通过后再进行二次衬砌;TBM尾部对已扩挖段进行回填;步骤4、拆除设备桥,从4729~4732环管片左侧开口,开挖旁通洞,绕行至TBM刀盘前方,进行TBM改造洞室开挖施工,并解困TBM,同时旁通洞继续开挖第三段绕行至前方主洞,对前方不良地质段进行提前人工开挖处理,以降低TBM在断层破碎带中的施工风险;在改造洞室施工的同时,对TBM原改造扩大洞室塌方进行处理,并拆除TBM,对受损部件进行检修;步骤5、在完成改造洞室以及启动洞室施工后,是TBM的组装工作与旁通洞第三段和40米的主洞上导洞的开挖平行作业,主洞人工全断面开挖,TBM由启动洞室开始掘进,主洞160m采取人工开挖上导洞TBM掘进下导洞。2.根据权利要求1所述的TBM改造洞室扩挖设计方法,其特征在于,步骤1中,从第4735环开始拆除至第4738环,4739环仍就留在尾盾内,拆除管片前先对管片背后进行固结灌浆加固。3.根据权利要求1所述的TBM改造洞室扩挖设计方法,其特征在于,步骤2中,支护参数:采用Φ26mm螺纹钢格栅拱架,间距75cm;8m自进式玻璃纤维锚杆,环向间距1m,纵向间距75cm;40cm厚C40钢纤维喷砼初支护;每榀格栅拱架设置4个变形槽,变形槽内安装应力变形器;并设置有L=6m、Φ32mm@45cm自进式锚杆管棚超前支护。4.根据权利要求1所述的TBM改造洞室扩挖设计方法,其特征在于,步骤3中,TBM尾部塌方段处理,通过打排水孔,安装管棚和钢拱架HW150×150,喷锚以及挂网,使TBM解困至尾盾。5.根据权利要求1所述的TBM改造洞室扩挖设计方法,其特征在于,步骤4中,旁通洞开口施工前,为防止开口处附近管片发生错动,确保管片稳定性,对开口附近8环管片进行了提前加固,管片加固主要进行水泥固结灌浆及打设4m长锚杆锁住管片,在固结灌浆完成后进行钻孔取芯,检查固结灌浆情况及前方围岩情况;在确定洞室结构稳定后,拆除管片,进行左侧旁通洞开挖施工。6.根据权利要求5所述的TBM改造洞室扩挖设计方法,其特征在于,开挖方式:左侧旁通洞开挖采用全断面人工手持风镐配合小挖机分层开挖,围...
【专利技术属性】
技术研发人员:孙新建,王海平,张海鸿,李海宁,蒲军竹,马福印,周隆基,晁永莲,张伟峰,杜喜龙,管吕军,占其兵,何殷鹏,刁目爽,
申请(专利权)人:青海大学,青海省引大济湟工程建设管理局,
类型:发明
国别省市:青海,63