The utility model discloses a height limiting device for municipal bridges, which comprises a first and a second bottom poles. Installation grooves are arranged in the first and second bottom poles, a first spring pole and a second spring pole are respectively arranged at the right end of the first gate connector, a third spring pole and a fourth spring pole are respectively arranged at the left end of the second gate connector, and a first spring pole, a second spring pole, a third spring pole and a third spring pole are arranged at the left end of the second gate connector. No.4 spring column can absorb the impact energy effectively. There is a buffer spring between the outer ring of the installation cylinder and the inner ring of the installation cylinder. It can further absorb the energy transmitted by the collision between the No.1 and No.2 limit transverse bars. Through the stable mechanical structure of the tripod, the impact force on the No.1 and No.2 bottom bars can be decomposed to prevent the No.1 and No.2 bottom bars from being impacted. The utility model has the advantages of simple structure, strong practicability, easy use and popularization.
【技术实现步骤摘要】
一种市政桥梁限高装置
本技术涉及一种市政
,具体是一种市政桥梁限高装置。
技术介绍
市政桥梁限高装置使市政相关部门依据交通法令法规和桥梁设计使用要求对桥梁上通车辆高度做出限定的装置,常设置在桥梁的上桥处,遵循市政桥梁限高装置的指示是桥梁车辆通行的基本保证。在实际生活中,常常会发生超高车辆强行通过限高装置的情况,超高车辆通过限高装置一方面破坏了限高装置的结构,使限高装置无法继续实用,另一方面由于碰撞也损伤了车辆,碰撞还有可能导致限高装置的倾倒、坍塌造成了二次事故,带来严重的经济损失,因此需要一款可以在碰撞时吸收碰撞能量。缓冲碰撞冲击,减小由于超高通过带来的伤害。
技术实现思路
本技术的目的在于提供一种市政桥梁限高装置,以解决上述
技术介绍
中提出的问题。为实现上述目的,本技术提供如下技术方案:一种市政桥梁限高装置,包括一号底杆和二号底杆,所述一号底杆和二号底杆内均设有安装槽,一号安装杆和二号安装杆的下端位于一号底杆和二号底杆的安装槽内,一号安装杆和二号底杆下端两侧均等间距的设有若干固定孔,一号底杆和二号底杆上在对应固定孔侧设有螺纹孔,一号底杆和二号底杆上设有定位螺栓;所述一号安装杆上端右侧设有安装筒,二号安装杆上端左侧设有安装筒,安装筒上包含安装筒外圈和安装筒内圈,安装筒外圈和安装筒内圈之间通过若干缓冲弹簧连接,安装筒内设有安装孔,一号安装杆通过安装筒连接一号连杆的左端,一号连杆的右端固定连接一号门形连接件,二号安装杆通过安装筒连接二号连杆的右端,二号连杆的左端固定连接二号门形连接件,所述一号门形连接件和二号门形连接件均水平设置,一号门形连接件开口向右,二号门形连 ...
【技术保护点】
1.一种市政桥梁限高装置,包括一号底杆(1)和二号底杆(3),其特征在于,所述一号底杆(1)和二号底杆(3)内均设有安装槽(29),一号安装杆(2)和二号安装杆(4)的下端位于一号底杆(1)和二号底杆(3)的安装槽(29)内,一号安装杆(2)和二号底杆(3)下端两侧均等间距的设有若干固定孔(30),一号底杆(1)和二号底杆(3)上在对应固定孔(30)侧设有螺纹孔(31),一号底杆(1)和二号底杆(3)上设有定位螺栓(7);所述一号安装杆(2)上端右侧设有安装筒(8),二号安装杆(4)上端左侧设有安装筒(8),安装筒(8)上包含安装筒外圈(81)和安装筒内圈(84),安装筒外圈(81)和安装筒内圈(84)之间通过若干缓冲弹簧(83)连接,安装筒(8)内设有安装孔(82),一号安装杆(2)通过安装筒(8)连接一号连杆(13)的左端,一号连杆(13)的右端固定连接一号门形连接件(15),二号安装杆(4)通过安装筒(8)连接二号连杆(14)的右端,二号连杆(14)的左端固定连接二号门形连接件(16),所述一号门形连接件(15)和二号门形连接件(16)均水平设置,一号门形连接件(15)开口向右, ...
【技术特征摘要】
1.一种市政桥梁限高装置,包括一号底杆(1)和二号底杆(3),其特征在于,所述一号底杆(1)和二号底杆(3)内均设有安装槽(29),一号安装杆(2)和二号安装杆(4)的下端位于一号底杆(1)和二号底杆(3)的安装槽(29)内,一号安装杆(2)和二号底杆(3)下端两侧均等间距的设有若干固定孔(30),一号底杆(1)和二号底杆(3)上在对应固定孔(30)侧设有螺纹孔(31),一号底杆(1)和二号底杆(3)上设有定位螺栓(7);所述一号安装杆(2)上端右侧设有安装筒(8),二号安装杆(4)上端左侧设有安装筒(8),安装筒(8)上包含安装筒外圈(81)和安装筒内圈(84),安装筒外圈(81)和安装筒内圈(84)之间通过若干缓冲弹簧(83)连接,安装筒(8)内设有安装孔(82),一号安装杆(2)通过安装筒(8)连接一号连杆(13)的左端,一号连杆(13)的右端固定连接一号门形连接件(15),二号安装杆(4)通过安装筒(8)连接二号连杆(14)的右端,二号连杆(14)的左端固定连接二号门形连接件(16),所述一号门形连接件(15)和二号门形连接件(16)均水平设置,一号门形连接件(15)开口向右,二号门形连接件(16)开口向左,一号门形连接件(15)右端分别设有一号弹簧柱(17)和二号弹簧柱(18),一号弹簧柱(17)的左端固定连接一号门形连接件(15)右侧上端,二号弹簧柱(18)的左端固定连接一号门形连接件(15)右侧下端,二号门形连接件(16)左端分别设有三号弹簧柱(19)和四号弹簧柱(20),三号弹簧柱(19)的右端固定连接二号门形连接件(16)右左侧上端,四号弹簧柱(20)的右端固定连接二号门形连接件(16)左侧下端,一号弹簧柱(17)和三号弹簧柱(19)之间设有一号限高横杆(21),一号限高横杆(21)的左端固定连接一号弹簧柱(17)的右端,一号限高横杆(21)的右端固定连接三号弹簧柱(19)的左端,二号弹簧柱(18)和四号弹簧柱(20)之间设有二号限高横杆(22),二号限高横杆(22)的...