The invention relates to the technical field of roadway construction method, in particular to a roadway construction method, which includes the following steps: first, measuring the construction position and drawing drawings; second, measuring the position of the centralized yard, the coal track stone gate, the mining area demolition chamber and the monorail crane overhaul chamber, and drawing on the drawings in detail by scale; and second, preliminary drawing and predefining the construction position. After drawing, the construction location of the substation is preliminarily determined to be 29.649 M 5 degree 58'27122 By turning right and crossing 45.707 meters ahead of the C3 point of the concentrating outdoor car yard in the fourth mining area instead of crossing 16.913 meters back between the roadway and the C6 point of the concentrating outdoor car yard in the fourth mining area, the scheduled scheme is improved, and the straight line type of the roadway is changed to L type, which realizes the technical optimization, meets the requirements of the design length of the substation, shortens the construction period, reduces the amount of roadway construction work and avoids the waste of funds.
【技术实现步骤摘要】
一种巷道施工方法
本专利技术涉及巷道施工方法
,具体涉及一种巷道施工方法。
技术介绍
巷道是在地表与矿体之间钻凿出的各种通路,用来运矿、通风、排水、行人以及为冶金设备采出矿石新开凿的各种必要准备工程等。这些通路,统称为巷道。现有的巷道施工大体需要计算、画图之后才确定具体实施方式,但一般直线型的设计会使得时间加工取得的面积与预计的面积相差较多,在同样能满足需要的同时耗费更多的资源和资金;而且在施工时,会存在施工位置偏移的问题,施工偏移角度即使很小,经过长范围的施工后也会造成很大的偏移量。
技术实现思路
本专利技术的目的是为了解决现有的巷道施工大体需要计算、画图之后才确定具体实施方式,但一般直线型的设计会使得时间加工取得的面积与预计的面积相差较多,在同样能满足需要的同时耗费更多的资源和资金;而且在施工时,会存在施工位置偏移的问题,施工偏移角度即使很小,经过长范围的施工后也会造成很大的偏移量的技术问题,而提出一种巷道施工方法。为了实现上述目的,本专利技术采用了如下技术方案:设计一种巷道施工方法,包括以下步骤:步骤一:测量施工位置,绘制图纸;对集中车场、煤轨道石门、采区安拆硐室、单轨吊检修硐室的位置进行测量并且通过比例尺详细的绘制在图纸上;步骤二:初步绘制,预定施工位置;绘制完毕后,初步定下采取变电所的施工位置为组煤回风巷H1点退后29.649米5°58′27″方位3‰下坡拨门施工,巷道与集中车场C6点退后16.913米贯通;步骤三:测量、计算施工长度和施工面积;测量得到巷道断面尺寸4.6*3.8m;工程量160.3米,巷道与集中车场C6点退后16.913米贯通 ...
【技术保护点】
1.一种巷道施工方法,其特征在于:包括以下步骤:步骤一:测量施工位置,绘制图纸;对集中车场(1)、煤轨道石门(2)、采区安拆硐室(4)、单轨吊检修硐室(5)的位置进行测量并且通过比例尺详细的绘制在图纸上;步骤二:初步绘制,预定施工位置;绘制完毕后,初步定下采取变电所(3)的施工位置为组煤回风巷H1点退后29.649米5°58′27″方位3‰下坡拨门施工,巷道与集中车场(1)C6点退后16.913米贯通;步骤三:测量、计算施工长度和施工面积;测量得到巷道断面尺寸4.6*3.8m;工程量160.3米,巷道与集中车场(1)C6点退后16.913米贯通;步骤四:确定支护方式;支护方式为锚网喷;步骤五:对比施工长度与要求长度,如果相差较大,则返回步骤二;如果相差不大,进行步骤六;根据变电所要求长度为长度70米,即70米可满足供电需求,而目前巷道设计长度达160.3米,长度相差较大,返回步骤二,组煤回风巷H1点退后29.649米5°58′27″方位3‰下坡拨门施工,采取向右拐弯与集中车场(1)C3点向前45.707米贯通,优化后巷道工程量缩短为115.294米,满足长度相差不大的要求,进行步骤六; ...
【技术特征摘要】
1.一种巷道施工方法,其特征在于:包括以下步骤:步骤一:测量施工位置,绘制图纸;对集中车场(1)、煤轨道石门(2)、采区安拆硐室(4)、单轨吊检修硐室(5)的位置进行测量并且通过比例尺详细的绘制在图纸上;步骤二:初步绘制,预定施工位置;绘制完毕后,初步定下采取变电所(3)的施工位置为组煤回风巷H1点退后29.649米5°58′27″方位3‰下坡拨门施工,巷道与集中车场(1)C6点退后16.913米贯通;步骤三:测量、计算施工长度和施工面积;测量得到巷道断面尺寸4.6*3.8m;工程量160.3米,巷道与集中车场(1)C6点退后16.913米贯通;步骤四:确定支护方式;支护方式为锚网喷;步骤五:对比施工长度与要求长度,如果相差较大,则返回步骤二;如果相差不大,进行步骤六;根据变电所要求长度为长度70米,即70米可满足供电需求,而目前巷道设计长度达160.3米,长度相差较大,返回步骤二,组煤回风巷H1点退后29.649米5°58′27″方位3‰下坡拨门施工,采取向右拐弯与集中车场(1)C3点向前45.707米贯通,优化后巷道工程量缩短为115.294米,满足长度相差不大的要求,进行步骤六;步骤六:清理巷道施工面,预定掘进路线,准备掘进作业;清理出巷道施工平面(13),在所述巷道施工平面(13)的施工处配备掘进机(12),且在所述掘进机(12)的外侧安装外接固定架(6),所述...
【专利技术属性】
技术研发人员:黄祖军,刘本冲,王安伟,陈柳,
申请(专利权)人:淮北矿业股份有限公司,
类型:发明
国别省市:安徽,34