A management and control system of heavy-duty electrical equipment adopts model-free fuzzy PID to control the rising stage and closed-loop iterative learning to control the position adjustment stage. The two stages are converted by switching module, and the position protection is carried out by locking module at the end of switching and lifting. The lifting control method uses position and force switching to control the lifting, guarantees the rising speed in the rising stage, guarantees the lifting accuracy and the positioning accuracy by controlling the lifting force, solves the difficult problems caused by error accumulation in the lifting process, and improves the lifting efficiency and the lifting accuracy.
【技术实现步骤摘要】
一种重型电气设备管控系统
本专利技术涉及一种重型电气设备管控系统,具体是一种重型电气设备管控系统。
技术介绍
电能需求量不断增加,电力行业建设不断发展,液压顶升装置被广泛应用于大型变电站的建设中,尤其在重型电器设备安装就位中,有着举足轻重的地位。同时新建大型变电站已经向自动化、智能化的方向发展,这对电气设备的安装就位提出了更高的要求。由于液压传动系统具有传动平稳、布置灵活、自动化程度高、易于实现过载保护等优点,电力建设行业普遍采用超高压液压泵站、液压千斤顶等组成的液压顶升装置进行电气设备的装卸和安装就位。与此相应的液压顶升装置的操作控制如下:首先、进行性能检查,接通380V液压泵站主电源,送电并空载运行,后检查液压泵站及液压千斤顶工作是否正常,经过调试后处于良好的使用状态。其次、进行顶升准备工作,将液压千斤顶摆放至变压器指定的顶位下,放置垫铁,并接通液压油管。第三、启动液压顶升装置,将变压器一侧顶起,再进行另一侧顶升,左右两侧交替进行。第四、至变压器底部与地面空间高度达到预定高度时,打好保险,完成顶升。受到现有施工及技术的制约,液压顶升装置及顶升方法在施工过程中,存在一些影响推广使用的因素如下:首先、重型电气设备重达200吨以上,为顶升施工的难点。其次、重型电气设备施工安装所需财力和物力较多,成本较高。第三、重型电气设备施工安装时间长,影响其进度。第四、主变压器作为变电站的核心设备,其安装在毫米级,顶升速度限制在100mm/60s,精度要求高,特别是安装精度要进行震荡校验。为此,改善重型电气设备管控系统,进一步提升系统的精度和效率,以满足重型电器设备的施工 ...
【技术保护点】
1.一种重型电气设备管控系统,其特征在于,具体方法如下:(1)开始程序;(2)设定初值,当顶升高度为h时,切换位置高度为0.6h;(3)通过数据采集模块采集位置信号;(4)由无模型模糊PID控制模块输出位置控制信号,进入顶升阶段;(5)由迭代学习控制模块检测位置趋近零误差输出,判断是否达到设定切换位置,是,执行位置闭锁;否,继续执行上述(4)步骤;(6)启动切换程序;(7)由闭环迭代学习ILC控制模块输出力控制信号,进入调整阶段;(8)判断是否达到预计顶升高度,是,执行位置闭锁,停止程序;否,继续上述步骤(7)。
【技术特征摘要】
1.一种重型电气设备管控系统,其特征在于,具体方法如下:(1)开始程序;(2)设定初值,当顶升高度为h时,切换位置高度为0.6h;(3)通过数据采集模块采集位置信号;(4)由无模型模糊PID控制模块输出位置控制信号,进入顶升阶段;(5)由迭代学习控制模块检测...
【专利技术属性】
技术研发人员:徐学明,
申请(专利权)人:南通同德电气设备有限公司,
类型:发明
国别省市:江苏,32
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。