The invention discloses a simulation method for the excavation process of a single supporting structure foundation pit with reasonable design, flexible use and low cost; firstly, the initial soil pressure on the side of the supporting pile is applied in the form of the set lateral static earth pressure, and then the loading handle of the loading device A1 on the top side of the simulation device is rotated and arranged in the mould. The number of sets of symmetrical loading devices on the right side of the model pile B1 continues to act on the simulated pile. According to the simulated working conditions, all the loading devices AI are unloaded to the loading position of the single support in turn. After the two side forces of the simulated pile are balanced, the unloaded right side pressure components corresponding to the loading position of the single support are loaded to the branch according to the magnitude of the internal support force. The retaining pile is loaded again to realize the simulation of single support loading. Finally, the pressure components on the right side of the lower part of the single support are unloaded in turn according to the predetermined working conditions until the unloading of the soil in all areas of the excavation side of the foundation pit is completed.
【技术实现步骤摘要】
一种单支撑式结构基坑开挖过程的模拟方法
本专利技术一种单支撑式结构基坑开挖过程的模拟方法,属于土木工程设计和施工
技术介绍
现代城市在不断发展过程中,建筑物趋于密集化,高层建筑及地下设施增多,在建筑密集区高层建筑下部结构施工中将存在着深基坑开挖及稳定问题。由于支护工程计算随土层的变化而更趋复杂,设计过程中常将多个土层简化,而且深基坑施工和支护往往以经验和工程类比法为主,尤其对支护方案的优选和支护构件的优化研究的并不深入系统。实际上,在基坑单支撑式结构内力计算中,首先需要确定支护结构的计算简化模型、支护结构外侧土压力的假定、基坑开挖过程中土压力的变化,现有的《建筑基坑支护技术规程》(JGJ120)在计算单支撑或锚拉式支档结构时,把支护桩外侧的土压力看作是主动土压力,把基坑内侧土反力采用线弹性模型,支护桩看着弹性梁进行计算,在计算中也没有考虑土压力是动态变化。如何采用物理模型直观地、可视化地表现这种计算过程中,而且合理的考虑单支撑式结构基坑开挖过程土压力的变化,是土木工程教学和工程计算必须面对的问题。
技术实现思路
本专利技术针对目前单支撑式结构基坑支护桩的问题,为了实现更好的理论分析和模拟教学,也为了完成合理支护设计和最优的经济效益,公开一种设计合理、使用灵活、成本低的单支撑式结构基坑开挖过程的模拟方法。为了解决上述技术问题,本专利技术采用的技术方案为:一种单支撑式结构基坑开挖过程的模拟方法,按下述步骤实施:第一步:安装反力框架;将反力框架固定于地面,确保底部横梁水平布置,侧梁垂直布置;第二步:模型桩参数的确定;确定模型桩的桩长,其中桩长=桩顶预留长度 ...
【技术保护点】
1.一种单支撑式结构基坑开挖过程的模拟方法,其特征在于,按下述步骤实施:第一步:安装反力框架(1);将反力框架(1)固定于地面,确保底部横梁(12)水平布置,侧梁(13)垂直布置;第二步:模型桩(5)参数的确定;确定模型桩(5)的桩长,其中桩长=桩顶预留长度+计算桩长+桩端预留长度,计算桩长为支护桩的桩顶到桩端之间的距离按比例确定的长度,以及用于施加侧向土压力面的桩的宽度、桩侧土层开挖前的沿计算桩长侧向土压力曲线形态和静止土压力的形态;第三步:安装定位调节组件(4);支撑板(42)布置于顶部横梁(11)和底部横梁(12)之间,且支撑板(42)的上、下端均固定于凹槽(14)内,并确保支撑板(42)的竖向轴线与铅垂线重合;在每个横梁槽口内的插孔(47)内安装调节杆(46),调节杆(46)穿过调节螺母(45),调节杆(46)上端固定在定位横梁(44)上,通过旋转调节螺母(45)使同一高度的所有定位横梁(44)在同一水平面;第四步:在模型桩(5)侧安装施压组件(2)和传压组件(3);预先加工施压组件(2),把套筒(23)两端穿过反力框架(1)的侧梁(13),定位杆(28)外置弹簧(22),且定 ...
【技术特征摘要】
1.一种单支撑式结构基坑开挖过程的模拟方法,其特征在于,按下述步骤实施:第一步:安装反力框架(1);将反力框架(1)固定于地面,确保底部横梁(12)水平布置,侧梁(13)垂直布置;第二步:模型桩(5)参数的确定;确定模型桩(5)的桩长,其中桩长=桩顶预留长度+计算桩长+桩端预留长度,计算桩长为支护桩的桩顶到桩端之间的距离按比例确定的长度,以及用于施加侧向土压力面的桩的宽度、桩侧土层开挖前的沿计算桩长侧向土压力曲线形态和静止土压力的形态;第三步:安装定位调节组件(4);支撑板(42)布置于顶部横梁(11)和底部横梁(12)之间,且支撑板(42)的上、下端均固定于凹槽(14)内,并确保支撑板(42)的竖向轴线与铅垂线重合;在每个横梁槽口内的插孔(47)内安装调节杆(46),调节杆(46)穿过调节螺母(45),调节杆(46)上端固定在定位横梁(44)上,通过旋转调节螺母(45)使同一高度的所有定位横梁(44)在同一水平面;第四步:在模型桩(5)侧安装施压组件(2)和传压组件(3);预先加工施压组件(2),把套筒(23)两端穿过反力框架(1)的侧梁(13),定位杆(28)外置弹簧(22),且定位杆(28)一端依次与活塞(26)和传力杆(24)连接,传力杆(24)穿过限位板(25)插入连接板(32)的U型槽(34)内,且与U型槽(34)底平面接触,并通过连接销与连接板(32)固定,定位杆(28)另一端插入空心螺纹杆(21)中,且空心螺纹杆(21)通过丝扣与套筒(23)连接,并在外端加装加载把手(27);在传压组件(3)的承压板(31)几何中心预留位置安装压力传感器,压力传感器面向模型桩(5)表面与承压板(31)表面齐平,然后在承压板(31)面向模型桩(5)一侧表面安装垫块(35),把每一个传压组件(3)均通过定位板(41)连接在相应的定位横梁(44)上;第五步:模型桩的制作与安装;在反力框架(1)的底孔(16)填入适量填土,并按设定的密实度击实,然后把预制完成的模型桩(5)通过顶部横梁(11)预留的送桩孔(15)吊入反力框架(1)内,模型桩(5)底端插入底孔(16)中,并根据模型桩(5)嵌固条件,确定模型桩(5)插入底孔(16)的深度,调节模型桩(5)的垂直度使模型桩(5)纵向轴线与铅垂线重合,用填土填充并密实底孔(16)与模型桩(5)之间的空隙;第六步:调节模型桩侧施压组件加载方向并加载;确保分布在模型桩(5)两侧对称布置的承压板(31)的法线在同一水平直线上,根据桩侧向土压力的分布形式,调整传力杆(24)端部在U型槽(34)的竖向位置,使两侧对称传力杆(24)轴线重合,通过连接销(37)贯穿定位孔(36)和传力杆(24)的连接通孔将传力杆(24)固定在连接板(32)上,确保可靠连接,这样就完成一套桩侧施压组件(2)和传压组件(3)的水平调节,如此循环,直至完成所有计算桩长范围内的桩侧施压组件(2)和传压组件(3)的调节;根据第二步...
【专利技术属性】
技术研发人员:李建军,常慧,裴勇,连勇,徐鹏程,李剑锋,韩云山,
申请(专利权)人:中北大学,
类型:发明
国别省市:山西,14
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。