The invention specifically relates to a deep-water concrete construction technique, which comprises: A, determining the size of concrete needed for structural engineering; B, preparing underwater concrete materials; C, transporting underwater concrete materials to the underwater pouring position through winches, and pouring after 40 to 50 seconds, each pouring thickness is 25 to 30 mm, and each pouring is completed. After 8 10 s, repeat several times until the designed pouring position is reached; D, solidification 1 3 days; E, curing after completion of solidification; F, using ultrasonic pulse wave to check the concrete, the inspection is qualified, then end of curing, the inspection is not qualified and continue to maintain for 2 3 days until the inspection is qualified; G, drainage of dry water, completion of the implementation. Work. By adding zinc-containing concrete additives into concrete, a kind of high performance underwater concrete with good fluidity is prepared, which is not easy to disperse under water. The cohesion of concrete is improved and the effect of non-segregation and self-leveling under water is achieved.
【技术实现步骤摘要】
一种深水混凝土施工技术
本专利技术属于道路施工
;具体涉及一种深水混凝土施工技术。
技术介绍
随着近海开发及大量水下结构工程的建设,尤其是在深部水下混凝土的浇筑与施工工程的增多,对混凝土水下浇筑、施工的质量要求越来越高。亟需一种新的深水下混凝土的浇筑施工新方法。CN105133558B公开了一种深水裸岩平台及其施工方法,首先在海底岩面上插放起始钢管桩,内加设钢筋混凝土锚桩,之后在起始钢管桩旁边的海底岩面上逐根放置桩基钢护筒,并逐根利用联结系将相邻的桩基钢护筒及起始钢管桩连接起来,桩基钢护筒范围外的海底岩面上还构建有模袋混凝土围堰,最后在桩基钢护筒和起始钢管桩顶部搭建带有护栏的平台上部结构。CN101962951A公开了一种纤维增强复合深水桥梁混合桩施工方法,包括以下步骤:将钢板卷制成筒,并进行焊接形成钢管;将碳纤维增强塑料即FRP粘贴于钢管外侧,形成FRP管,并与钢管成为一体形成FRP复合管,再将FRP复合管就位并固定;采用振动或锤击将FRP复合管安装到桥梁桩基预定位置;在管内钻孔达到设计深度,将绑扎好的钢筋笼置于孔内,所述FRP复合管兼做钻孔护筒;浇筑混凝土,形成内部钢筋混凝土,所述内部钢筋混凝土与FRP复合管一起构成混合桩。CN105220703B公开了一种基于回砂平衡法条件下围挡式深水承台施工方法,首先在河床面上施工钢板桩形成围堰,在围堰内水下浇筑形成封底混凝土层,由吸泥管将围堰外侧高于封底混凝土层的砂土吸入到钢板围堰内,减少钢板围堰内外砂土高度差;在钢板围堰内逐步抽水并随之安装内支撑,吊运出围堰内砂土临时存放使封底混凝土层的表层外露;在封底混 ...
【技术保护点】
1.一种深水混凝土施工技术,其特征在于:包括如下步骤:A、根据水下结构工程建设的要求,确定结构工程需要浇筑混凝土的尺寸;B、将90‑120重量份水泥、42‑64重量份含锌混凝土助剂、21‑28重量份II级粉煤灰、19‑25重量份砂、8‑15重量份絮凝剂、12‑19重量份硅镁石纤维、5‑10重量份硫铝酸钙和200‑235重量份水放入混凝土搅拌机中搅拌,搅拌速度为600‑800r/min,搅拌时间为20‑100min,配制成水下混凝土料;C、通过绞车将水下混凝土料运送至水下浇筑位置,40‑50s后进行浇筑,每次浇筑的厚度为25‑30mm,每次浇筑结束后,静置8‑10s,重复多次,直至达到设计的浇筑位置;D、固化1‑3天;E、完成固化后进行养护,养护时间为3‑5天;F、采用超声脉冲波对混凝土进行检验,检验合格则结束养护,检验不合格则继续养护2‑3天,直至检验合格;G、排干水,完成施工;所述含锌混凝土助剂按照如下方法进行制备:将15‑20重量份萘磺酸甲醛缩合物、3‑8重量份沸石粉、3‑8重量份硬脂酸、7‑12重量份十二烷基苯磺酸钠、5‑12重量份甲基纤维素、5‑11重量份邻苯二甲酸二丁酯、3‑ ...
【技术特征摘要】
1.一种深水混凝土施工技术,其特征在于:包括如下步骤:A、根据水下结构工程建设的要求,确定结构工程需要浇筑混凝土的尺寸;B、将90-120重量份水泥、42-64重量份含锌混凝土助剂、21-28重量份II级粉煤灰、19-25重量份砂、8-15重量份絮凝剂、12-19重量份硅镁石纤维、5-10重量份硫铝酸钙和200-235重量份水放入混凝土搅拌机中搅拌,搅拌速度为600-800r/min,搅拌时间为20-100min,配制成水下混凝土料;C、通过绞车将水下混凝土料运送至水下浇筑位置,40-50s后进行浇筑,每次浇筑的厚度为25-30mm,每次浇筑结束后,静置8-10s,重复多次,直至达到设计的浇筑位置;D、固化1-3天;E、完成固化后进行养护,养护时间为3-5天;F、采用超声脉冲波对混凝土进行检验,检验合格则结束养护,检验不合格则继续养护2-3天,直至检验合格;G、排干...
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。