A mine drainage well plugging structure, including anti seepage concrete, a coarse sand layer above the seepage concrete, a gravel layer above the coarse sand layer, a permeable concrete layer above the lithotripsy layer, a mortar layer above the permeable concrete layer, a filter opening pipe in the coarse sand layer, and a filter opening pipe to outsource the geotextile The water filled rubber ring is wrapped in the periphery of the cloth and the gravel layer, and the water bearing tail slag is filtered through the mortar layer, the permeable concrete layer, the gravel layer, the coarse sand layer and the geotextile as clear water. The utility model can ensure the waterproof permeability of the plugging body and ensure the strength of the plugging body to meet the safety requirements.
【技术实现步骤摘要】
一种矿山排水井封堵结构
本技术涉及矿山排水
,具体涉及一种矿山排水井封堵结构。
技术介绍
矿山排水系统的质量影响矿山的安全,排水井你是排水系统的主要构筑物之一,对尾矿库的安全稳定性起着十分重要的作用,所以排水井应严格参照《尾矿库安全技术规程》中有相关的规定:设计排水系统时,应考虑终止使用时在井座或支洞末端进行封堵的措施;尾矿库排水构筑物停用后,必须严格按设计要求及时封堵,并确保施工质量,严禁在排水井井筒顶部封堵;闭库设计时,当原排洪设施结构强度不能满足要求或受损严重时,应进行加固处理;必要时,可新建永久性排洪设施,同时将原排洪设施进行封堵。但是在实际工程中大多采用毛石混凝土或浆砌块石等刚性材料封堵,在工程实践中并不理想:1)一旦混凝土结构封堵完成,其抵抗的水头差是固定的,当库区加高极易造成内外水头(水深)差过大,超出设计要求,长时间水的渗透作用下很难保证封堵质量;2)在巨大的压力下封堵体强度不够,导致封堵体剪切破坏,封堵失效。
技术实现思路
为了克服上述现有技术的缺点,本技术的目的在于提供一种矿山排水井封堵结构,能够保证封堵体防水渗透的能力,同时保证封堵体的强度满足安全要求。为了达到上述目的,本技术采取的技术方案为:一种矿山排水井封堵结构,包括抗渗混凝土8,抗渗混凝土8的上方设有粗砂层5,粗砂层5的上方设有碎石层4,碎石层4的上方设有透水混凝土层3,透水混凝土层3的上方设有浆砌石层1,在粗砂层5中布设过滤开孔管7。所述的过滤开孔管7外包土工布6。所述的碎石层4外围包裹有遇水膨胀橡胶圈2。本技术的有益效果为:保留浆砌石层1和抗渗混凝土8,保证封堵强度,保护 ...
【技术保护点】
1.一种矿山排水井封堵结构,包括抗渗混凝土(8),其特征在于:抗渗混凝土(8)的上方设有粗砂层(5),粗砂层(5)的上方设有碎石层(4),碎石层(4)的上方设有透水混凝土层(3),透水混凝土层(3)的上方设有浆砌石层(1),在粗砂层(5)中布设过滤开孔管(7)。
【技术特征摘要】
1.一种矿山排水井封堵结构,包括抗渗混凝土(8),其特征在于:抗渗混凝土(8)的上方设有粗砂层(5),粗砂层(5)的上方设有碎石层(4),碎石层(4)的上方设有透水混凝土层(3),透水混凝土层(3)的上方设有浆砌石层(1),在粗砂层(5...