The invention relates to a mixed water pumping station presedimentation aeration water distribution and rectification method of wall perforation flow, including water pipes, pre sedimentation tank, pre sedimentation tank inlet arranged the first water wall pre sedimentation tank is also arranged in the second water 0.1 times between the second wall with water the wall with the first water wall distance of the pre sedimentation tank length, the first water and second water wall wall height are 0.56 times the width of the pre sedimentation tank; first with water wall is provided with a plurality of first through holes, wherein the first wear holes comprises a plurality of first rectangular holes and a plurality of holes. Second, with water on the wall is provided with a plurality of holes in second, the second wear holes comprises a plurality of second rectangular holes, the flow of the pipeline buried depth is less than the depth of the pre sedimentation tank. The present invention for the traditional water flow can not be effectively balanced tracery wall on the lower velocity of innovation, more effectively achieve the water resistance and uniform flow rate, enhance the effect of pre settlement of solid particles suspended solids settling pool.
【技术实现步骤摘要】
一种取水泵站预沉曝气池的混合穿孔配水花墙及其整流方法
本专利技术涉及一种取水泵站预沉曝气池的混合穿孔配水花墙及其整流方法,属于水利工程设计
技术介绍
预沉池是构成取水泵站的重要部分,其对于泥沙的固体颗粒悬浮物的沉降发挥着重要作用。当水流通过管道由水源地自流进入预沉池,水流中含有大量泥沙等固体颗粒悬浮物,为了尽可能使泥沙等固体颗粒悬浮物在预沉池中沉降下来,需要保证预沉池中水流流态平顺均匀,通常在预沉池前端设置穿孔花墙进行配水。工程实践发现在预沉池中设置配水花墙之后,水流经过配水花墙,仍需要较长的调整,才能使预沉池内的水流流速变得均匀,而且配水花墙之后的水流,由于受到扰动,流态较差,影响预沉池内水流沉淀效果。传统配水花墙穿孔一般为矩形,通过砖块堆砌而成,是用于减小进入平流沉淀池的水流流速的多孔墙。它使流量均匀地分布在进水截面上,从而减小对沉淀池的扰动。
技术实现思路
本专利技术的目的是针对上述现有技术的不足,提供一种矩形和圆孔混合穿孔配水花墙布置的取水泵站预沉曝气池的混合穿孔配水花墙及其整流方法,可以使预沉池内水流流速分布更加均匀平顺,提升泥沙等固体颗粒悬浮物的沉降效果。本专利技术的目的是这样实现的,一种取水泵站预沉曝气池的混合穿孔配水花墙,包括来流输水管道、预沉池,来流输水管道与预沉池的进口贯通,来流水经来流输水管道流入预沉池内,其特征是:所述预沉池进口处布置有第一道配水花墙,预沉池内还设有第二道配水花墙,第二道配水花墙与第一道配水花墙之间的距离为预沉池长度的0.1倍,第一道配水花墙、第二道配水花墙的高度均为预沉池宽度的0.56倍;所述第一道配水花墙上 ...
【技术保护点】
一种取水泵站预沉曝气池的混合穿孔配水花墙,包括来流输水管道(1)、预沉池,来流输水管道(1)与预沉池的进口贯通,来流水经来流输水管道(1)流入预沉池内,其特征是:所述预沉池进口处布置有第一道配水花墙(2),预沉池内还设有第二道配水花墙(3),第二道配水花墙(3)与第一道配水花墙(2)之间的距离为预沉池长度的0.1倍,第一道配水花墙(2)、第二道配水花墙(3)的高度均为预沉池宽度的0.56倍;所述第一道配水花墙(2)上设有若干第一穿水孔,所述第一穿水孔包括若干第一矩形孔(4)和若干圆孔(5)组成,若干第一矩形孔(4)设置于第一道配水花墙(2)的上半部分,最下面的第一矩形孔(4)与第一道配水花墙(2)的墙底边的距离为预沉池宽度的0.315倍,且第一矩形孔(4)的长和宽均为预沉池宽度的0.031倍,两相邻第一矩形孔(4)水平间距为预沉池宽度的0.046倍,竖直间距为预沉池宽度的0.046倍;若干圆孔(5)设置于第一道配水花墙(2)的下半部分,圆孔(5)的直径为预沉池宽度的0.031倍,两相邻圆孔(5)与圆孔(5)之间的水平间距为预沉池宽度的0.062倍,竖直间距为预沉池宽度的0.046倍,最 ...
【技术特征摘要】
1.一种取水泵站预沉曝气池的混合穿孔配水花墙,包括来流输水管道(1)、预沉池,来流输水管道(1)与预沉池的进口贯通,来流水经来流输水管道(1)流入预沉池内,其特征是:所述预沉池进口处布置有第一道配水花墙(2),预沉池内还设有第二道配水花墙(3),第二道配水花墙(3)与第一道配水花墙(2)之间的距离为预沉池长度的0.1倍,第一道配水花墙(2)、第二道配水花墙(3)的高度均为预沉池宽度的0.56倍;所述第一道配水花墙(2)上设有若干第一穿水孔,所述第一穿水孔包括若干第一矩形孔(4)和若干圆孔(5)组成,若干第一矩形孔(4)设置于第一道配水花墙(2)的上半部分,最下面的第一矩形孔(4)与第一道配水花墙(2)的墙底边的距离为预沉池宽度的0.315倍,且第一矩形孔(4)的长和宽均为预沉池宽度的0.031倍,两相邻第一矩形孔(4)水平间距为预沉池宽度的0.046倍,竖直间距为预沉池宽度的0.046倍;若干圆孔(5)设置于第一道配水花墙(2)的下半部分,圆孔(5)的直径为预沉池宽度的0.031倍,两相邻圆孔(5)与圆孔(5)之间的水平间距为预沉池宽度的0.062倍,竖直间距为预沉池宽度的0.046倍,最下面的圆孔(5)距离第一道配水花墙(2)的墙底边的距离为预沉池宽度的0.038倍;第一道配水花墙(2)横向的两边均预留有0.023倍预沉池宽度的距离长度;所述第二道配水花墙(3)上设有若干第二穿水孔,所述第二穿水孔包括若干第二矩形孔(6),且第二矩形孔(6)的长和宽均为预沉池宽度的0.031倍,两相邻第二矩形孔(6)水平间距为预沉池宽度的0.054倍,竖直间距为预沉池宽度的0.054倍;所述第二道配水花墙(3)上最下面的第二矩形孔(6)距离第二道配水花墙(3)的墙底边的距离为预沉池宽度的0.038倍,且第二道配水花墙(3)横向的两边均预留有0.027倍预沉池宽度的距离长度。2.根据权利要求1所述的一种取水泵站预沉曝气池的混合穿孔配水花墙,其特征是:所述流输水管道(1)的埋深小于预沉池的埋深。3.一种取水泵站预沉曝气池的混合穿孔配水花墙的整流方法,其特征是:包括来流输水管道(1)、预沉池,来流输水管道(1)与预沉池的进口贯通,来流水经来流输水管道(1)流入预沉池内,所述预沉池进口处布置有第一道配水花墙(2),预沉池内还设有第二道配水花墙(3),第二道配水花墙(3)与第一道配水花墙(2)之间的距离为预沉池长度的0.1倍,第一道配水花墙(2)、第二道配水花墙(3)的高度均为预沉池宽度的0.56倍;在第一道配水花墙(2)上设有若干第一穿水孔,第一穿水孔包括若干第一矩形孔(4)和若干圆孔(5)组成,若干第一矩形孔(4)设置于第一道配水花墙(2)的上半部分,最下面的第一矩形孔(4)与第一道配水花墙(2)的墙底边的距离为预沉池宽度的0.315倍,且第一矩形孔(4)的长和宽均为预沉池宽度的0.031倍,两相邻第一矩形孔(4)水平间距为预沉池宽度的0.046倍,竖直间距为预沉池宽度的0.046倍;若干圆孔(5)设置于第一道配水花墙(2)的下半部分,圆孔(5)的直径为预沉池宽度的0.031倍,两相邻圆孔(5...
【专利技术属性】
技术研发人员:成立,张帝,顾巍,周曼,崔阳,周艳霞,程卫国,于磊,徐文涛,
申请(专利权)人:扬州大学,
类型:发明
国别省市:江苏,32
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。