The present invention discloses an upper and lower split prefabricated pipe gallery, and relates to the technical field of comprehensive pipe gallery, which comprises an upper and a lower pipe pipe gallery Gallery; the gallery comprises a top plate and two side plates; under the pipe rack comprises a bottom plate and two side; on the two side is connected with the two side plates with internal short positions. The invention adopts the upper and lower split structure, adopts split type horizontal pouring, can reduce the weight of the single casting, is convenient for transportation and installation, and has good pouring quality.
【技术实现步骤摘要】
一种上下分体式预制管廊
本专利技术涉及用于城市地下管网系统的综合管廊的
,尤其涉及一种上下分体式预制管廊。
技术介绍
综合管廊是指在城市道路下面建造一个市政共用隧道,将电力、通信、供水、燃气等多种市政管线集中在一体,实行“统一规划、统一建设、统一管理”,以做到地下空间的综合利用和资源的共享。传统的综合管廊建设,一般采用现场浇筑,需要在施工现场进行钢筋加工绑扎、支模、混凝土浇注、养护、拆模等工序,此方法不仅施工工序复杂,施工周期长,同时还存在需要较大的原材料存放和加工厂地等问题。为了解决现场浇筑式管廊的施工缺陷,出现了整体式预制管廊,但是整体式预制管廊往往体积和重量较大,从工厂到施工现场的的运输和现场吊装极为不便,从而出现了装配式结构管廊。而现有的装配式结构管廊其实也是属于整体式预制管廊范畴,只是相对整体式预制管廊长度缩短而已;其浇筑工艺一般采用立式整体浇筑或卧式整体浇筑;卧式整体浇筑,往往都存在几个技术缺陷:1)由于预制管廊的高度高、重量大,从而在浇筑时经常在模具的下部出现胀模现象,从而造成模具损坏;2)由于模具为整体式的,从而导致,从上往下向模具内灌注混凝土时,在模具底部的空气及气泡无法完全排出,从而导致成型的管廊底板出现蜂窝状缺陷,甚至出现局部露筋现象,严重影响结构强度、使用寿命及密封性;3)浇筑完,脱模难,且易磨损磨具,减少模具使用寿命。而立式整体浇筑,存在技术缺陷:1)模具的浇筑顶面即为管廊装配时的配合面,采用立式整体浇筑,模具无法保证浇筑的该面的平整度,从而影响之后的管廊装配及密封。
技术实现思路
针对上述技术难点,本专利技术的目的在于,提供一 ...
【技术保护点】
一种上下分体式预制管廊,其特征在于,包括上管廊和下管廊;所述上管廊包括顶板和两上侧板;下管廊包括底板和两下侧板;两上侧板与两下侧板配合连接,内部为空仓。
【技术特征摘要】
1.一种上下分体式预制管廊,其特征在于,包括上管廊和下管廊;所述上管廊包括顶板和两上侧板;下管廊包括底板和两下侧板;两上侧板与两下侧板配合连接,内部为空仓。2.根据权利要求1所述的一种上下分体式预制管廊,其特征在于,所述下管廊的下侧板预埋多根底部设锚固板和螺帽的下PC钢棒,上管廊的上侧板设多个与下侧板下PC钢棒对应的通孔,通孔中穿设上PC钢棒;所述下PC钢棒和上PC钢棒通过螺套连接,螺套设于下侧板上部的凹孔...
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。